Payment Terms | T/T |
Supply Ability | 30 Sets Mould Per Month |
Delivery Time | 30 working days |
Packaging Details | Artificial Wooden Box with Steel Frame |
Mold Material | NAK80, 738/P20/718/NAK80/S136, S136, P20, 718H |
Mold Base Material | S50C LKM, HASCO, DME, LKM & HASCO & DME, LKM Mould Base |
Design Software | UG, CAD, PROE, ProE/G/SOLIDWORKS/CAD/, CATIA |
Mold Life | 1,000 to 1,000,000 shots(according to your requirement) |
Runner System | Hot Runner\ Cold Runner |
Cavity | Single cavity, Muti Cavity, based on customer’s requirement. |
Lead time | T1 4-5 weekds working days after mold 3D approved |
To be discussed | In-Mold Decoration, Injection Mould, |
Brand Name | KYE |
Model Number | 2 plate-mold |
Certification | ISO9001:ISO14001 |
Place of Origin | China |
View Detail Information
Explore similar products
OEM Cold Runner TPE TPR Silicone Overmold Injection Mold
Hot Runner Plastic TPE TPU Overmold Injection Mold
Medical Automotive DME ABS PC Overmold Injection Mold
2 Cavity Overmold Injection Mold
Product Specification
Payment Terms | T/T | Supply Ability | 30 Sets Mould Per Month |
Delivery Time | 30 working days | Packaging Details | Artificial Wooden Box with Steel Frame |
Mold Material | NAK80, 738/P20/718/NAK80/S136, S136, P20, 718H | Mold Base Material | S50C LKM, HASCO, DME, LKM & HASCO & DME, LKM Mould Base |
Design Software | UG, CAD, PROE, ProE/G/SOLIDWORKS/CAD/, CATIA | Mold Life | 1,000 to 1,000,000 shots(according to your requirement) |
Runner System | Hot Runner\ Cold Runner | Cavity | Single cavity, Muti Cavity, based on customer’s requirement. |
Lead time | T1 4-5 weekds working days after mold 3D approved | To be discussed | In-Mold Decoration, Injection Mould, |
Brand Name | KYE | Model Number | 2 plate-mold |
Certification | ISO9001:ISO14001 | Place of Origin | China |
High Light | TPU plastic injection overmolding ,PC plastic injection overmolding ,Remote Controller overmolding |
Remote Controller PC TPU Plastic Injection Overmolding
Part Desription
Runner type | Cold runner |
A/B plate steel | P20 |
Mold base steel | S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base |
Mold type | 2 plate-mould |
Core/Caviry steel | S136, P20/718/738/NAK80/S136, NAK80, P20, 718H |
Mold standard | LKM |
Gate type | Sub gate |
Mold life | 0.3-0.5 million shots |
Design software | UG, PROE, CAD, CAD/ProE/UG/SOLIDWORKS |
Cycle time | 40S |
Payment term | T/T |
Package | Artificial Wooden Box with Steel Frame |
Deliverly date | 4 Weeks |
Mold number | According to customer requirement |
MOQ | 1 set |
KYE Mould Team is able to offer the full range of service from mold designing, making, plastic part molding to printing, assembly, package, and shipping arrangement.
1. Mold Building
Mold up range from small, middle and large mold
Complex Surfaces
Assembly Fixtures
Hot-Runner Capability
Mold flow analysis
2. Technical Injection Molding
Robotic and Automated Pick and Place
High Pressure Thin wall
Small Precision and Large Cosmetic
Structural Foam
3. Engineering/ Technical
Supplier Managed Inventory
Mold design
Project management
Design for Manufacturing
4. Plasting/die-casting molding
Our Advantage
1. Owned mold making workshop
KYE has owned mold workshop with 15 CNC machine,10 EDM, 4 wire cutting,milling machines, drilling machines, 2CMM and 3CMM in house to make sure the high quality and lead time.
2. Professional Engineer team
KYE has 6-8 engineers with 10~15 years of full expereience, their professional skill can offer you the best solution for the project and help you manage the project in the best effective way.
3. Various Service
We offer various service including Automotive parts, Home Appliance, Electronic and Medical parts with one stop service
including product design, mould fabrication and second processing,such as Spray painting,Printing, Chrome, Engrave and assembling,etc.
4. Injection molding workshop
KYE has around 40-50 sets of injection machine range from 50T to 600T.
5. Thorough project management system
KYE has thorough project management system from sales team to engineer and worker team.
Equipment | Model | Qty | Made in |
CNC Center | YCM FV85A | 2 | Taiwan |
Harford CNC-2150H | 2 | China | |
OKUMA | 1 | Japan | |
EDM Machine | ARD M30E | 7 | Taiwan |
Sodick am30l | 3 | Japan | |
AM30L | 1 | China | |
Wire EDM | Charmilles 240 | 2 | Switzerland |
GA64S | 1 | Taiwan | |
Grinder | JL-614 | 3 | Taiwan |
WP-614 | 5 | Taiwan | |
Miller | Topone 3-5# | 5 | Taiwan |
Die Spotting machine | NICE NC70-1007 | 1 | China |
Die Rolling Machine | NICE NCF-5 | 1 | China |
CMM | Mitutoyo C707 | 1 | Japan |
Linear Height | TESA Micro-Hite M600 | 1 | Switzerland |
Tool Microscope | Mitutoyo MF-A1720 | 5 | Japan |
Projector | CPJ-3015Z | 1 | Taiwan |
Gear Tester | OSAKA GTR-4LS | 1 | Japan |
FAQ
Q1: How many mold can you make per month?
A: About 40-50 molds, it is depend on the size of mold.
Q2: What's the MOQ?
A: It is depend on the product, please kindly contact me , I will send you more details.
Q: How soon can i get reply after sending inquiry?
A: All inquiries would be replied within 2 hours, except sleeping time in China; and our cell phones are standing by any calls at any time.
Q: What should I provide for price enquiry?
A: The 3d drawing (in STP/ STEP/ IGS/ X_T/ SLD format) with information about material, quantity, surface treatment, tolerance, and requires.
Q: If I don't have drawing, how can I get prototype?
A: If you don't have any drawing, you can send us your samples, we'll scan it and make the drawing first, then make prototype for you.
Q: What is your MOQ ( minimum order quantity)?
A: The MOQ is 1,000pcs for injetcion molding, you are welcome to send us trial order to test our quality and services.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
2008
Total Annual:
2 Million-3 Million
Employee Number:
50~80
Ecer Certification:
Site Member
KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting... KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting...
Get in touch with us
Leave a Message, we will call you back quickly!