Payment Terms | T/T, L/C |
Supply Ability | 2 Set/Sets per Month |
Delivery Time | 15-45 work days |
Packaging Details | Standard packing |
Video outgoing-inspection | Provided |
Warranty | 1 Year |
Power Supply | Custom-Made |
Weight: | 5600kg |
Applicable Industries | Manufacturing Plant |
Brand Name | NOBO Machine |
Model Number | NOBO-ZD-80S |
Certification | CE |
Place of Origin | Foshan,china |
View Detail Information
Explore similar products
Bonell Type Automatic Spring Bed Net Production Line NOBO-ZD-80S 2M Max Width
NOBO 1.2KW 70-450mm Thick Mattress Tape Edge Machine For Sleeping Bag
Auto String Spring Mattress Production Line 5000x3200x2200mm
2000mm Bed Nets Mattress Production Line 28KW Pocket Spring Coiling Machine
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 2 Set/Sets per Month |
Delivery Time | 15-45 work days | Packaging Details | Standard packing |
Video outgoing-inspection | Provided | Warranty | 1 Year |
Power Supply | Custom-Made | Weight: | 5600kg |
Applicable Industries | Manufacturing Plant | Brand Name | NOBO Machine |
Model Number | NOBO-ZD-80S | Certification | CE |
Place of Origin | Foshan,china | ||
High Light | 2.4mm Automatic Spring Making Machine ,2.0mm Automatic Spring Making Machine ,20kw Mattress Compression Machine |
Automatic spring Mattress Production Line with mattress compression machine Spring Making
Working principle:
1. Steel wires are winded into single springs by spring coiling machine, and then springs are conveyed to the spring assembly machine through an automatic transmission system.
2. The automatic spring assemly machine realizes the simultaneous connection of the spring up and down, automaticly cutting of the connecting wire, the bending of both ends.
3. The entire spring bed net will be ejected automatically.
Packaging | |
Size | (L) * (W) * (D)mm |
Weight | *kg |
Packaging Details | The normal package is wooden box(Size: L*W*H). If export to european countries,the wooden box will be fumigated.If container is too tigher,we will use pe film for packing or pack it according to customers special request. |
Delivery: | |
Payment: | 30% by T/T as down payment before production, and the rest 70% by T/T as balance payment before shipment. |
Time of Delivery: | Within 20 days after receiving the buyer’s down payment. |
Warranty: | The seller provides one year warranty of the main machine starting from the moment the buyer signs the acceptance certificate. For the wearing parts, consumption of materials and the damage incurred by the Buyer's incorrect operation are out of the warranty range. |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2007
Total Annual:
600-700
Employee Number:
50~100
Ecer Certification:
Site Member
NOBO MATTRESS MACHINERY COMPANY is established in foshan since 2007 ,we are professionally manufacturing the mattress machinery for China and oversea market in the past decade ,after years growing , we are becoming one of the leading high tech company in the mattress industry , providing: ... NOBO MATTRESS MACHINERY COMPANY is established in foshan since 2007 ,we are professionally manufacturing the mattress machinery for China and oversea market in the past decade ,after years growing , we are becoming one of the leading high tech company in the mattress industry , providing: ...
Get in touch with us
Leave a Message, we will call you back quickly!