Payment Terms | L/C, T/T, Western Union |
Supply Ability | 10 Ton Per Month |
Delivery Time | 15 Working days |
Packaging Details | Regular shipping packaging or depends on customer's requirement |
Product Name | Nickel Alloy Steel Pipe |
Material | UNS N08800 |
End | BE |
Standard | ASME |
Technic | Seamless |
Usage | Oil |
Brand Name | TOBO |
Model Number | UNS N07718 |
Certification | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
Place of Origin | China |
View Detail Information
Explore similar products
ASTM A798 F53 UNS S32750 6" SCH80 Super Duplex Steel Pipe
ASME B16.5 Threaded Reducing Flange NPT LJ RF Flange For Chemicals And Gas
Nickle Alloy Stainless Steel Seamless Pipe Round Shape Cold Rolled ISO
UNS N10001 Alloy B Nickel Alloy Seamless Pipe Wet Chlorine Resistant High
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 10 Ton Per Month |
Delivery Time | 15 Working days | Packaging Details | Regular shipping packaging or depends on customer's requirement |
Product Name | Nickel Alloy Steel Pipe | Material | UNS N08800 |
End | BE | Standard | ASME |
Technic | Seamless | Usage | Oil |
Brand Name | TOBO | Model Number | UNS N07718 |
Certification | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED | Place of Origin | China |
High Light | nickel alloy tube ,seamless alloy pipe |
GENERAL CHARACTERISTICS OF Alloy 800
Alloy 800 has good high-temperature strength and is resistant to oxidation, carburization and other types of high temperature corrosion.
Production Name | Nickel Alloy Steel Pipes |
Standard | ASME/ANSI B16.9, ISO, JIS, DIN, BS,GB, SH, HG,QOST,ETC. |
Size | 1/2’’~48’’(Seamless);16’’~72’’(Welded) |
Wall thickness | Sch5~Sch160XXS |
Manufacturing process | Push, Press, Forge, Cast, etc. |
Nickel alloy steel | Alloy 200/Nickel 200/NO2200/2.4066/ASTM B366 WPN; Alloy 201/Nickel 201/NO2201/2.4068/ASTM B366 WPNL; Alloy 400/Monel 400/NO4400/NS111/2.4360/ASTM B366 WPNC; Alloy K-500/Monel K-500/NO5500/2.475; Alloy 600/Inconel 600/NO6600/NS333/2.4816; Alloy 601/Inconel 601/NO6001/2.4851; Alloy 625/Inconel 625/NO6625/NS336/2.4856; Alloy 718/Inconel 718/NO7718/GH169/GH4169/2.4668; Alloy 800/Incoloy 800/NO8800/1.4876; Alloy 800H/Incoloy 800H/NO8810/1.4958; Alloy 800HT/Incoloy 800HT/NO8811/1.4959; Alloy 825/Incoloy 825/NO8825/2.4858/NS142; Alloy 925/Incoloy 925/NO9925; Hastelloy C/Alloy C/NO6003/2.4869/NS333; Alloy C-276/Hastelloy C-276/N10276/2.4819; Alloy C-4/Hastelloy C-4/NO6455/NS335/2.4610; Alloy C-22/Hastelloy C-22/NO6022/2.4602; Alloy C-2000/Hastelloy C-2000/NO6200/2.4675; Alloy B/Hastelloy B/NS321/N10001; Alloy B-2/Hastelloy B-2/N10665/NS322/2.4617; Alloy B-3/Hastelloy B-3/N10675/2.4600; Alloy X/Hastelloy X/NO6002/2.4665; Alloy G-30/Hastelloy G-30/NO6030/2.4603; Alloy X-750/Inconel X-750/NO7750/GH145/2.4669; Alloy 20/Carpenter 20Cb3/NO8020/NS312/2.4660; Alloy 31/NO8031/1.4562; Alloy 901/NO9901/1.4898; Incoloy 25-6Mo/NO8926/1.4529/Incoloy 926/Alloy 926; Inconel 783/UNS R30783; NAS 254NM/NO8367; Monel 30C Nimonic 80A/Nickel Alloy 80a/UNS N07080/NA20/2.4631/2.4952 Nimonic 263/NO7263 Nimonic 90/UNS NO7090; Incoloy 907/GH907; Nitronic 60/Alloy 218/UNS S21800 |
Package | Wooden cases, pallets, nylon bags or according to the customers' requirements |
Delivery time | 10-100 days depending on quantity |
Payment terms | T/T or Western Union or LC |
Shipment | FOB Tianjin/Shanghai, CFR, CIF, etc |
Application | Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc |
Remarks | Other materials and drawings are available. |
The third party inspection: | BV,SGS,LOIYD,TUV,and other party alloyed by clients. |
Trade Name | ASTM Pipe | Pipe Fittings | UNS | Forging & Flanges |
Monel@ 400 | B165 | B366 WPNC | N04400 | B564 N04400 |
Inconel@ 600 | B167 | B366 WPNCI | N06600 | B564 N06600 |
Inconel@ 625 | B444 | B366 WPNCMC | N06625 | B564 N06625 |
Incoloy@ 800 | B163 | B366 WPNIC | N08800 | B564 N08800 |
Incoloy@ 800H | B407 | B366 WPNIC10 | N08810 | B564 N08810 |
Incoloy@ 800HT | B407 | B366 WPNIC11 | N08811 | B564 N08811 |
Incoloy@ 825 | B423 | B366 WPNICMC | N08825 | B564 N08825 |
Hastelloy@ B2 | B619/622 | B366 WPHB-2 | N10665 | B564 N10665 |
Hastelloy@ C276 | B619/622 | B366 WPHC276 | N10276 | B564 N10276 |
Hastelloy@ C22 | B619/622 | B366 WPHC22 | N06022 | B564 N06022 |
Carpenter 20Cb-3@ | B729 | B366 WP20Cb | N08820 | B462 N08820 |
SANICRO 28@ | B668 | N08028 |
Chemical Properties
CHEMICAL ANALYSIS | |
---|---|
C | Carbon 0.10 max |
Cr | Chromium 19.00/23.00 |
Ni | Nickel 30.00/35.00 |
Fe | Iron 39.50 min |
Ti | Titanium 0.15/0.60 |
Al | Aluminium 0.15/0.60 |
Al + Ti | Aluminium + Titanium 0.30/1.20 |
Application
The alloy is used in furnace components and equipment, petrochemical furnace cracker tubes, pigtails and headers, and sheathing for electrical heating elements
FORGING
Forging of this alloy is carried out between 2200/1600ºF (1200/870ºC): heavy forging is carried out in the range 2200/1850ºF (1200/1010ºC).
Chromium carbide precipitation will occur in the temperature range 1400/1000ºF (760/540ºC), thus parts should be cooled rapidly through this temperature range.
WELDABILITY
The alloy may be welded by all processes. The alloy supplier should be consulted for a guide to electrodes and filler metals to be used. Parts to be welded should be clean and joint designs should be such that a minimum of stress may be set up during welding.
Our advangtage
1) Raw material use 100% material steel
2) Good service
3) Competive price
4) Fast delivery
5)High quality products
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
3,000,000-10,000,000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicia... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicia...
Get in touch with us
Leave a Message, we will call you back quickly!