Changzhou Chenye Warp Knitting Machinery Co., Ltd. Leave Messages
Payment Terms | L/C, T/T,Western Union, MoneyGram |
Supply Ability | 20 sets per month |
Delivery Time | 60 days after deposit payment |
Packaging Details | 40HQ/Set |
Condition | New |
Product Type | Shade net making machine |
Type | Single needle bar |
Knitting Style | Knitting |
Computerized | Yes |
Power(W) | 3~7.5KW |
Color | Bule/Green/White/Customized |
Size | 2m/2.5m/3.4m/3.8m/4.5m/5.5m/6m/6.6m/8.6m/9.6m/11m |
Brand Name | Chenye |
Model Number | SRCP |
Certification | ISO ,CE, TUV |
Place of Origin | China , Jiangsu |
View Detail Information
Explore similar products
Mono Raschel Wrap Green Net Manufacturing Machine
Pe / Pp Mono Shade Net Making Machine 3~7.5KW For Knitting Agro Net
Plastic Shade Net Making Machine , 3-7.5kw Computerized Knitting Machine
SRCP Open Cam Shade Net Making Machine With Beam / Single Needle Bar
Product Specification
Payment Terms | L/C, T/T,Western Union, MoneyGram | Supply Ability | 20 sets per month |
Delivery Time | 60 days after deposit payment | Packaging Details | 40HQ/Set |
Condition | New | Product Type | Shade net making machine |
Type | Single needle bar | Knitting Style | Knitting |
Computerized | Yes | Power(W) | 3~7.5KW |
Color | Bule/Green/White/Customized | Size | 2m/2.5m/3.4m/3.8m/4.5m/5.5m/6m/6.6m/8.6m/9.6m/11m |
Brand Name | Chenye | Model Number | SRCP |
Certification | ISO ,CE, TUV | Place of Origin | China , Jiangsu |
High Light | Monofilament shade Net Manufacturing Machine ,Monofilament Net making Machine ,sunshine shade Net Manufacturing Machine |
Application:This machine is used to produce Agriculture sunshine shade net, sports net ,purse net and deep sea aquaculture net and so on.
Feature:The machine is equipped with oiled eccentric gearing and a negative yarn let-off system.
Needle Type:Block latch needle ,individual latch needle or Compound needle
Gauge : E3,E6,E7,E8,E9,E12,E14,E16,E18
Number of bar : 2~8
Working Width : 135", 150", 170", 220", 240". 260"
Take-up manner: 2 rollers with friction drive, center shaft drive, 2 rollers with friction drive, separately-standing, center shaft drive, separately-standing
Relevant corollary equipment: Warping Machine
Type | Size(L×W×H) | Weight(Kg) | Power(KW) | Speed(rpm) | |
Main motor | Inching motor | ||||
class="lazy" src="/myres/images/load_icon.gif" data-originalP-135 | 4300×2200×2700 | 4700 | 3 | 0.37 | 200-560 |
class="lazy" src="/myres/images/load_icon.gif" data-originalP-150 | 4900×2200×2700 | 5000 | 3 | 0.37 | 200-560 |
class="lazy" src="/myres/images/load_icon.gif" data-originalP-180 | 6100×2200×2700 | 7500 | 5.5 | 0.75 | 200-560 |
class="lazy" src="/myres/images/load_icon.gif" data-originalP-220 | 7300×2200×2700 | 9000 | 5.5 | 1.5 | 200-500 |
class="lazy" src="/myres/images/load_icon.gif" data-originalP-240 | 8200×2200×2700 | 10500 | 5.5 | 1.5 | 200-500 |
class="lazy" src="/myres/images/load_icon.gif" data-originalP-260 | 10300×2200×2700 | 12000 | 7.5 | 1.5 | 200-400 |
PRODUCING LINE
The machine can produce suitable nets according to different use scenarios and different raw materials
SHIPPMENT
SERVICE
1.We can dispatch our enginner to your factory to commissioning machine and trainning your enginner.
2.You can dispatch your enginner come to our factory to study how to maintance and fix machine.We will arrange netting factory to teach your enginner study how to produce net for free.
3.Our service team online 24 hours to help you solve problems.
4.Some contries we have office and local enginner to provide you professional service.
5.If we go to your contry to attend exhibition or visit customers,we must go to your factory to maintance machine for free.
EXHIBITION
COMPANY INTRODUCTION
A
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5.How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
6.How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Trading Company
Year Established:
2001
Total Annual:
100-200
Employee Number:
20~30
Ecer Certification:
Verified Supplier
We are manufacturer specialised in warp knitting machinery with strong R&D background. We have our own sales and service team to expand our overseas trade.Our focus is also on technical and product development. Our facility covers 14000 sq.m with more than60 employees. We ha... We are manufacturer specialised in warp knitting machinery with strong R&D background. We have our own sales and service team to expand our overseas trade.Our focus is also on technical and product development. Our facility covers 14000 sq.m with more than60 employees. We ha...
Get in touch with us
Leave a Message, we will call you back quickly!