Payment Terms | L/C, T/T |
Supply Ability | 100 Unit per month |
Delivery Time | 30 days |
name | Overhead Fault Indicator |
model | JYL-KK type fault indicator |
Rating Voltage | 6-35kV |
Working mode | automatic |
Brand Name | Knkong |
Model Number | JYL-KK type fault indicator |
Certification | ISO IEC CB |
Place of Origin | China |
View Detail Information
Explore similar products
JYL-KK Type 6-35kV Overhead Fault Indicator
Outdoor Solar Overhead Fault Indicator For MV Power Distribution Network
Solar Powered JYW-KK IPX7 Overhead Line Fault Indicator Automatic Warning
DYX-KK Type Automatic 6KV Power Line Fault Indicator
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 100 Unit per month |
Delivery Time | 30 days | name | Overhead Fault Indicator |
model | JYL-KK type fault indicator | Rating Voltage | 6-35kV |
Working mode | automatic | Brand Name | Knkong |
Model Number | JYL-KK type fault indicator | Certification | ISO IEC CB |
Place of Origin | China | ||
High Light | 35kV Overhead Fault Indicator ,6kV Overhead Fault Indicator ,overhead line fault indicator |
JYL-KK Type 6-35kV Overhead Fault Indicator
Product Introduction
The ring network cabinet online monitoring equipment is mainly suitable for the automation transformation of the traditional ring network cabinet and the switchgear. While realizing two remote (remote signaling, telemetry) functions, detect and locate the position of short circuit and ground fault at the same time, shorten the power outage time and scope. Not only is important for improving the reliability of power supply, but also an indispensable technology for building an intelligent grid.
Advantages
Sampling the zero-sequence current synthesis algorithm, canceling the traditional zero-sequence transformer design, synthesizing the zero-sequence current by detecting the phase sequence to identify the single-phase ground fault, and effectively solving the situation where it is not convenient to install the zero-sequence transformer;
5A self-powered, the acquisition unit uses high magnetic permeability material CT, combined with low-power system design, to ensure that the primary current 5A achieve battery-free full-function operation, improve reliability;
Instead of using the traditional one-time battery power supply scheme, the three-level power architecture of CT power supply, supercapacitors, and non-rechargeable lithium batteries is adopted to guarantee the reliable operation of the equipment;
Electronic current transformer for current and ground electric field detection, It has great linearity of test data and is not affected by wire diameter, thus guarantee test accuracy;
Collection unit indicates failures locally and centrally, eliminating the need to install display panels in every interval;
The energy opening CT is made of anti-rust and anti-corrosion materials, supplemented by a high-level cutting process to ensure that the outdoor environment provides sufficient power for the equipment;
Both the collection unit and the acquisition unit can be controlled remotely and wirelessly.
Technical Parameter
Item | Parameter | |
Applications |
Voltage | 6~35kV |
Neutral grounding method | Various grounding methods are available | |
Wiring type | Overhead insulation and bare wires 35mm²~300mm² | |
Collection unit power supply |
Main power | PT/CT |
Backup power |
Rechargeable battery: Lithium iron phosphate or lead-acid colloid battery is dependent on necessary. All hardware design is compatible for them both. |
|
Acquisition unit power supply |
Main power | Line self-powered (5A full-function operation) |
Backup power | Disposable lithium battery 3.6V, 8.5Ah | |
Time of duration of the supercapacitor battery> 12 hours | ||
Static power dissipation | Acquisition unit | ≤40uA |
Collection unit | ≤0.2VA | |
Telemetry accuracy | Current |
0~200A,measurement accuracy:±2A 200A~600A,measurement accuracy:±1% |
Sampling frequency | 4096Hz | |
Fault detection | Recognizable fault type | Short circuit between phases, various single-phase grounding |
Instantaneous faults and permanent faults | ||
Recognition minimum recognition time | 0.2s | |
Line status indication |
Indication | Bright LED |
Flashing time after an outage | >2000h | |
Fault reset method | Timed automatic reset can be set from 1 to 48 hours | |
Power-on automatic reset and remote manual reset | ||
Local communication |
Frequency band | 430~480MHz |
Communication medium | Plastic optical fiber | |
Communication distance | >20m | |
Mechanical properties | Weight | <2kg |
Protection level | Acquisition unit IPX7;Collection unit IPX5 | |
Working environment | Temperature | -40℃~70℃ 10%~ |
Humidity | 100% | |
Service life | Operating | >8 years |
Failure-free time (average) |
MTBF≥70000h |
Company Details
Business Type:
Manufacturer
Year Established:
2012
Total Annual:
1000000-9000000
Employee Number:
50~100
Ecer Certification:
Active Member
Knkong Electric Co., Ltd (Zhengzhou Knkong Mechanical And Electrical Co., Ltd)was established in 2012. A wholly-owned subsidiary of Henan Sanhe Electric Group. We are mainly responsible for overseas market exporting, electronic components, and technology import. Relying on a h... Knkong Electric Co., Ltd (Zhengzhou Knkong Mechanical And Electrical Co., Ltd)was established in 2012. A wholly-owned subsidiary of Henan Sanhe Electric Group. We are mainly responsible for overseas market exporting, electronic components, and technology import. Relying on a h...
Get in touch with us
Leave a Message, we will call you back quickly!