Payment Terms | MoneyGram,Western Union,T/T,D/P,D/A,L/C |
Supply Ability | 5 sets per month |
Delivery Time | 20~90 days |
Packaging Details | Angle Iron Frame + Tray + Collision Protection |
Design Code | API 650 |
Usage | Storage |
Size | Customizable |
Installation | Above Ground |
Application | Industrial/Commercial |
Durability | Long-lasting |
Material | Steel |
Corrosion Resistance | High |
Construction Type | Welded |
Maintenance | Low |
Shape | Cylindrical |
Installation Method | On-site |
Brand Name | MDS |
Model Number | MDS-WT5000 |
Certification | CE, ISO9001:2015 |
Place of Origin | China |
View Detail Information
Explore similar products
Product Specification
Payment Terms | MoneyGram,Western Union,T/T,D/P,D/A,L/C | Supply Ability | 5 sets per month |
Delivery Time | 20~90 days | Packaging Details | Angle Iron Frame + Tray + Collision Protection |
Design Code | API 650 | Usage | Storage |
Size | Customizable | Installation | Above Ground |
Application | Industrial/Commercial | Durability | Long-lasting |
Material | Steel | Corrosion Resistance | High |
Construction Type | Welded | Maintenance | Low |
Shape | Cylindrical | Installation Method | On-site |
Brand Name | MDS | Model Number | MDS-WT5000 |
Certification | CE, ISO9001:2015 | Place of Origin | China |
Waste Oil Storage Tank
Product Overview
Welded Tanks for Waste Oil Storage: Engineering Excellence Meets Environmental Compliance
In industrial facilities handling lubricants, hydraulic fluids, or machining coolants, waste oil storage tank have become the gold standard for leak-proof containment.
The Critical Role of Welded Construction in Oil Containment
Unlike sectional tanks prone to gasket failures, welded waste oil storage tanks offer seamless integrity – a vital feature given that 1 liter of spilled oil can contaminate 1 million liters of groundwater. Modern fabrication techniques like submerged arc welding (SAW) create joints with <0.1% porosity, exceeding API 650 standards for hazardous liquid storage.
5 Factors Driving Welded Tank Superiority
1. Pressure Resistance:
Welded tanks withstand 2.5-4X more internal pressure than bolted equivalents (tested to 30 PSI).
2. Customization:
On-site welding allows integration of:
- Baffle walls to prevent sloshing
- Heating jackets for viscous oils
- Multi-chamber configurations
3. Lifespan:
Properly maintained welded steel tanks last 25-40 years vs. 10-15 years for polyethylene.
4. Regulatory Compliance:
Meet strict EPA 40 CFR 264.193 requirements for secondary containment.
5. Recyclability:
Steel tanks have 90%+ scrap metal value vs. landfilling costs for plastic.
Material Selection Guide for Welded Waste Oil Tanks
Material | Thickness Range | Corrosion Resistance | Temp Limit | Cost Index |
---|---|---|---|---|
Carbon Steel (ASTM A36) | 3/16" - 1/2" | Moderate (needs coating) | 800°F | 1.0 |
304 Stainless Steel | 1/8" - 3/8" | Excellent | 1500°F | 3.2 |
Duplex 2205 | 3/16" - 1/2" | Superior (chloride resistance) | 600°F | 4.8 |
Corten Steel | 1/4" - 1" | Atmospheric corrosion | 750°F | 1.7 |
Smart Welding Technologies Revolutionizing Tank Fabrication
Maintenance Protocol for Maximum Tank Longevity
Annual Inspections:
- Ultrasonic testing (UT) for wall thickness
- Dye penetrant testing on welds
Coatings:
- Apply coal-tar epoxy (CTE) for acidic oils
- Zinc-rich primers for coastal environments
Upgrades:
- Retrofit with IoT-enabled pressure sensors
- Install explosion-proof vents for flammable oils
FAQs: Welded Waste Oil Storage Tanks
Q1: How does welding affect tank certification?
A: Welded tanks require ASME Section VIII Division 1 certification for pressures >15 PSIG. Always request mill test reports (MTRs) for materials.
Q2: Can existing bolted tanks be converted to welded?
A: Limited feasibility – consult a PE to assess shell plate conditions. Full weld-over typically costs 60% of new tank pricing.
Q3: What’s the lead time for custom welded tanks?
A: 8-14 weeks for engineered systems, depending on size (standard 5,000-50,000 gal).
Q4: Are welded tanks earthquake-resistant?
A: When designed per API 650 Appendix E, they withstand seismic zones up to Zone 4. Anchoring must follow IBC 2018 Chapter 16.
Q5: How to handle tank bottom corrosion?
A: Implement API 653 repair guidelines – partial replacement requires ≥12" overlap on existing welds.
Future-Proofing Your Investment
Leading manufacturers now offer:
- Hybrid Laser-Arc Welding: 50% faster deposition rates for large tanks
- Self-Healing Coatings: Microcapsules release anti-corrosion agents when scratched
By choosing welded tanks for waste oil storage, industries achieve the trifecta of regulatory compliance, environmental stewardship, and long-term cost efficiency. Partner with AWS-certified fabricators and specify NACE SP0294 coatings to maximize ROI.
Product Show
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2015
Total Annual:
10 million-15 million
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Founded in 2015, Sichuan Mondes Green Technology Co., Ltd. stands proudly in Chengdu, the heart of Sichuan Province, a region celebrated as "the Land of Abundance." As the cornerstone subsidiary of Jiangxi Yitian Environmental Protection Equipment Co., Ltd., Mondes has carved out an illustrious repu... Founded in 2015, Sichuan Mondes Green Technology Co., Ltd. stands proudly in Chengdu, the heart of Sichuan Province, a region celebrated as "the Land of Abundance." As the cornerstone subsidiary of Jiangxi Yitian Environmental Protection Equipment Co., Ltd., Mondes has carved out an illustrious repu...
Get in touch with us
Leave a Message, we will call you back quickly!