China factories

China factory - Sichuan Mondes Green Technology Co.,Ltd

Sichuan Mondes Green Technology Co.,Ltd

  • China,Chengdu ,Sichuan
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Green Color Dual Membrane Biogas Dome Gas Holder Anti Corrosion Shockproof
China Green Color Dual Membrane Biogas Dome Gas Holder Anti Corrosion Shockproof

  1. China Green Color Dual Membrane Biogas Dome Gas Holder Anti Corrosion Shockproof
  2. China Green Color Dual Membrane Biogas Dome Gas Holder Anti Corrosion Shockproof
  3. China Green Color Dual Membrane Biogas Dome Gas Holder Anti Corrosion Shockproof
  4. China Green Color Dual Membrane Biogas Dome Gas Holder Anti Corrosion Shockproof

Green Color Dual Membrane Biogas Dome Gas Holder Anti Corrosion Shockproof

  1. MOQ: 1 set
  2. Price: Please contact us
  3. Get Latest Price
Type Double membrane gas holder
Shape Dome shaped
Function Store And Collect Biogas
Control Mode Automatic Control
Packaging Details Standard export wooden box
Delivery Time 5~60 days
Payment Terms T/T, L/C, Western Union, MoneyGram
Supply Ability 20 sets per month
Place of Origin China
Brand Name MDS
Certification CE, ISO9001:2015

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Type Double membrane gas holder Shape Dome shaped
Function Store And Collect Biogas Control Mode Automatic Control
Packaging Details Standard export wooden box Delivery Time 5~60 days
Payment Terms T/T, L/C, Western Union, MoneyGram Supply Ability 20 sets per month
Place of Origin China Brand Name MDS
Certification CE, ISO9001:2015
High Light Shockproof Dual Membrane Biogas DomeGreen Color Dual Membrane Gas Holder

 

Green Dual Membrane Biogas Domes

 

Benefits of green dual membrane biogas domes
MONDES's gas storage systems are exclusively manufactured from advanced structural fabrics and designed as membranes to provide both structural (climatic) stability and impermeable gas storage. No metals are used, except for the anchorage connecting the membranes to a concrete foundation slab.
Our green dual membrane biogas domes are provided with full instrumentation to measure and control the storage process. Our Biogas holders can be used in (e.g.) solid waste processing facilities, sewage water and sludge treatment facilities, agricultural waste treatment projects, and agricultural- and industrial biogas installations.

Included components of green dual membrane biogas domes
- Quality membranes: inner membrane
- Quality membranes: outer membrane
- Quality membranes: bottom membrane
- Explosion-proof blower
- Pressure sensor
- Control cabinet
- Range finder
We only list the main components here, the detailed components will be listed in quotation sheet.
Optional
- Gas volume measurement system (Ultrasonic range finder)
- PLC control system
- Methane detector

Making green dual membrane biogas domes using superior materials and standards.
The white dual membrane biogas domes are highly tear resistant polyester fabrics with a special PVC surface treatment and acrylate varnish. The fabric is also resistant to the impact of the different biogas ingredients and the white colour of its external membrane has a highly reflective effect. The construction and dimensions of the double membrane biogas storage tank comply with all relevant standards.

  • Biogas storage system fabric is highly flame-poof according to DIN 4102-B1

  • Higher specification fabric is available on request

  • The special surface treatment formula guarantees high resistance against permeability & UV

  • All biogas storage tanks are resistant to wind and heavy snow and guarantee safe operation

The temperature resistance ranges from –30°C to +70°C

Advantages of green dual membrane biogas domes
- Light weight
- Conservation and environmental
- Easily repair & remove
- Advantageous anti-corrosion property
- Better shockproof and shock resistant ability than Enamel tank
- Free equipment operation training
- Standardization, serialization, wide range of selection
- Modern method of production
- Certificate of originate, ISO 9001
- Design Life time: 15 to 25 years

Delivery Service of green dual membrane biogas domes
- The product will leave factory within 30-45 days after receipt of your advance payment
- Export standard, safety and environmental packing Quick lead time for mass production.
- Accept EXW, FOB, CIF and other price terms

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    2015

  • Total Annual:

    10 million-15 million

  • Employee Number:

    50~100

  • Ecer Certification:

    Verified Supplier

Founded in 2015, Sichuan Mondes Green Technology Co., Ltd. stands proudly in Chengdu, the heart of Sichuan Province, a region celebrated as "the Land of Abundance." As the cornerstone subsidiary of Jiangxi Yitian Environmental Protection Equipment Co., Ltd., Mondes has carved out an illustrious repu... Founded in 2015, Sichuan Mondes Green Technology Co., Ltd. stands proudly in Chengdu, the heart of Sichuan Province, a region celebrated as "the Land of Abundance." As the cornerstone subsidiary of Jiangxi Yitian Environmental Protection Equipment Co., Ltd., Mondes has carved out an illustrious repu...

+ Read More

Get in touch with us

  • Reach Us
  • Sichuan Mondes Green Technology Co.,Ltd
  • ROOM 10, 20TH FLOOR, 1ST BUILDING, NO.588, MIDDLE SECTION OF YIZHOU AVENUE, HIGH-TECH ZONE, CHENGDU CITY, (SICHUAN) PILOT FREE TRADE ZONE, CHINA
  • https://www.mondestank.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement