Payment Terms | T/T |
Supply Ability | 10000pcs/month |
Delivery Time | 15-30 days |
Packaging Details | According To Your Demand |
Material | Zinc#5 |
Finished | Bright Nickel Chrome Plating |
Color | Gold |
MOQ | 1000pcs |
Drawing Format | IGS,SLD,STEP,CAD and PDF |
Tooling Life | 80000pcs |
Brand Name | JHPD |
Model Number | Win |
Certification | ISO9001:2015/TS16949 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
TS16949 Zamak Die Casting Part Multiple Cavity For Aviation Machine
CNC Machining Zinc Die Casting 0.05~0.2mm Motorcycle Spare Parts
Single Cavity Copper Die Casting Auto Parts SGS IATF16949 Certification
Automotive Housing Zinc Die Casting Parts 1.2344 Cavity CNC Machining For
Product Specification
Payment Terms | T/T | Supply Ability | 10000pcs/month |
Delivery Time | 15-30 days | Packaging Details | According To Your Demand |
Material | Zinc#5 | Finished | Bright Nickel Chrome Plating |
Color | Gold | MOQ | 1000pcs |
Drawing Format | IGS,SLD,STEP,CAD and PDF | Tooling Life | 80000pcs |
Brand Name | JHPD | Model Number | Win |
Certification | ISO9001:2015/TS16949 | Place of Origin | CHINA |
High Light | ISO9001 Zinc Die Casting ,JHPD Zinc Die Casting ,Zamak Die Casting |
Bright Nickel Chrome Plating Zinc Die Casting In Zamak#5 For HD Housing
Place of Origin | Guangdong, China |
Model Number | OEM |
Surface | Chrome Plating |
Size | Customized |
Keywords | Zinc die casting |
Method | Die casting |
Material | Zic#3, Zinc#5, Zinc#7 |
Mold lead time | 4 weeks |
MOQ | 1000pcs |
Certificate | ISO9001:2015/TS16949 |
Salt Spray | 72Hours |
Quality | Control by CMM |
Die Casting Manufacturer Equipment List
Ka Heng Mould Manufactruring Limited Shenzhen Johnhalm PDTec.,ltd | ||||
No | Equipment name | Brand | Qty | Specification |
1 | Hot Chamber Die Casting Machine | LK | 1 | 88T |
Hot Chamber Die Casting Machine | LK | 1 | 160T | |
2 | Cold Chamber Die Casting Machine | LK | 1 | 500T |
Cold Chamber Die Casting Machine | LK | 2 | 280T | |
Cold Chamber Die Casting Machine | LK | 1 | 500T | |
Cold Chamber Die Casting Machine | LK | 1 | 800T | |
Cold Chamber Die Casting Machine | LK | 1 | 1250T | |
3 | CNC lathe Machine | TSUGAMI CHINA | 5 | |
4 | CNC Machining Centre | Brother and Taikan | 16 | |
5 | Milling Machine | FTM-4TA | 4 | |
6 | EDM Machine | CKEATE450 | 2 | |
7 | Radial drilling machine | Z3038X9 | 1 | |
8 | Grinding Machine | M618A | 3 | |
9 | Drilling Machine | SGM350 | 10 | |
10 | Tapping Machine | Z3038X9 | 10 | |
11 | Ultrosonic Machine | 1 | ||
12 | Sand Blast Machine | MQ3225 | 2 | |
13 | Lapping Machine | 2 |
Services
1 | Project Evaluation |
2 | Product Design |
3 | Electronic Design and Engineering |
4 | Mechanical Design and Engineering |
5 | Prototype Design and Engineering |
6 | Design for Manufacturing |
7 | Manufacturing Coordination |
8 | Mould design |
9 | Manufacturing |
10 | Second processing |
11 | Assembly and etc. |
12 | One-stop services for plastic parts. |
Production Information
1. Start from part design analysis
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making
3. If product is complex,moldflow report will be present as well
4. In house mold making shop ensure you mold quality under well control.
5. Normally it takes 25-35 days to make mold,precise time depends on part design
Product
Die Casting Workshop
CNC Machining Workshop
FAQ
1. Are you a factory or trade company?
We are a factory and trade company located in Shenzhen of Guangdong, specialize in aluminum zinc ,magnesium casting, cnc machining, gravity, injection and so on.
welcome to visit our factory
2. How about your quality?
All our products will be checked one by one before delivery
3. What is your payment term?
Payment: Tooling cost 50% deposit and 50% after T1 samples approved.
Part cost: Net 30
Payment Method: Wire
4. How long you can make your quotation?
After receiving detail information we will quote within 2 days.
5. What is your quotation element?
Drawing, material, surface treatment and quantity.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
2005
Total Annual:
7.6 Million -12.3 Million
Employee Number:
100~220
Ecer Certification:
Active Member
JHPD Mould Manufacturer was established in 2005, located in Tianluohu Industrial Park, Guanguang Road, Guanlan Town, Shenzhen (near the entrance of Meiguan Expressway, opposite of Chang'an Peugeot) which is very convenient to be in our factory. Since the establishment of the co... JHPD Mould Manufacturer was established in 2005, located in Tianluohu Industrial Park, Guanguang Road, Guanlan Town, Shenzhen (near the entrance of Meiguan Expressway, opposite of Chang'an Peugeot) which is very convenient to be in our factory. Since the establishment of the co...
Get in touch with us
Leave a Message, we will call you back quickly!