Payment Terms | L/C, T/T |
Supply Ability | 1 set per a month |
Delivery Time | A month |
Packaging Details | According to customers' requirement. 1-Painted with anticorrosive paint to protect the mold from rust;2-Wrapped with plastic film to protect the mold from rust due to;3-Load on very durable wooden cases. |
Material | A360.A380,ADC12,A413...etc |
Keyword | Export die casting mold |
Mould material | SKD61,H13,P20,1.2344 |
Tolerance | 0.05-0.10mm |
Mould life | 5000-80000shots |
Surface treatment | Painting,Sandblasting,Powder coating |
Size | As your requirement |
Brand Name | JHPD |
Model Number | JHPD-08 |
Certification | ISO9001,IATF16949 |
Place of Origin | China |
View Detail Information
Explore similar products
High Precision Mold Die Casting 1.2344 Core Steel Customized For Auto Accessorie
H13 Steel Custom Die Casting / Aluminum Extrusion Mold 60inch For Heat Sink
Mold Die Casting Multi Cavity SKD61 Steel Customized High Precision 80000 Shots
High Precision Aluminum Die Casting Tooling Customized ADC10 5000 shots
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 1 set per a month |
Delivery Time | A month | Packaging Details | According to customers' requirement. 1-Painted with anticorrosive paint to protect the mold from rust;2-Wrapped with plastic film to protect the mold from rust due to;3-Load on very durable wooden cases. |
Material | A360.A380,ADC12,A413...etc | Keyword | Export die casting mold |
Mould material | SKD61,H13,P20,1.2344 | Tolerance | 0.05-0.10mm |
Mould life | 5000-80000shots | Surface treatment | Painting,Sandblasting,Powder coating |
Size | As your requirement | Brand Name | JHPD |
Model Number | JHPD-08 | Certification | ISO9001,IATF16949 |
Place of Origin | China | ||
High Light | Sandblasting Mold Die Casting ,P20 Mold Die Casting ,Sandblasting Aluminium High Pressure Die Casting |
Sandblasting Powder coating Custom Zinc Aluminum Metal High Pressure Mold Die Casting
product name | Factory Tool Design Available One Top Service Mould Design Mold Opening available Die-set Mould Base | |||
material | Aluminum alloy (ADC12/A380/A360 etc.) | |||
size and shape | Any size available, according to your design | |||
processing | Drawing review - material preparation - processing - die frame processing - die core processing - electrode processing - die parts | |||
processing - inspection - assembly - flying die - test die - production | ||||
tolerance | Normally +/-0.05~+/-0.1mm, according to your requirement | |||
certificate and quality assurance | ISO 9001:2015,IATF 16949:2016, | |||
SGS Certification, CE certificate, Rohs certificate | ||||
MOQ | Small quantity also available | |||
moulding lead time | Normally takes 30~45 days |
Company Information
ShenZhen Johnhalm PDTec., Ltd and Shenzhen KaHeng Mould Manufacturer is a global manufacturer of both conventional and multi-slide die cast precision components. We offer solutions for a variety of industries including light of hoticulture and ballast, professional/stage lighting housings, LED light enclosures, motors, communication products, consumer electronics, automotive, healthcare, and more.
Main Inspection Equipment | ||
No | Equipment name | Qty(pcs) |
1 | CMM | 1 |
2 | 2D measurement instrument | 1 |
3 | Infrared temperature detector | 1 |
4 | Thermocouple temperature detector | 1 |
5 | Image measuring instrument | 1 |
6 | Thickness meter | 1 |
7 | Roughness tester | 1 |
8 | Gloss tester | 1 |
9 | Salt spray test machine | 1 |
10 | Leeb hardness tester | 1 |
11 | Color difference analyzer | 1 |
12 | Wear test machine | 1 |
13 | Torque wrench | 1 |
14 | Micrometer | 6 |
15 | Caliper | 12 |
Die casting Workshop
Production Packaging
Q1: How do you keep the customer information confidentiality?
A1: It is a good question, and also most of the customers will have the same thinking, we have Non-Disclosure Agreement with all the employees.
Q2: How long will the quote be finished?
A2: Actually it depends on how many items you want to quote. Normally 1-2 simple project, we will provide the quotation within two days. If you have many items, normally it takes 3-4 days to work out. If you are really urgent, we will make a special arrangement for you.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
2005
Total Annual:
7.6 Million -12.3 Million
Employee Number:
100~220
Ecer Certification:
Active Member
JHPD Mould Manufacturer was established in 2005, located in Tianluohu Industrial Park, Guanguang Road, Guanlan Town, Shenzhen (near the entrance of Meiguan Expressway, opposite of Chang'an Peugeot) which is very convenient to be in our factory. Since the establishment of the co... JHPD Mould Manufacturer was established in 2005, located in Tianluohu Industrial Park, Guanguang Road, Guanlan Town, Shenzhen (near the entrance of Meiguan Expressway, opposite of Chang'an Peugeot) which is very convenient to be in our factory. Since the establishment of the co...
Get in touch with us
Leave a Message, we will call you back quickly!