China factories

China factory - Mabis Project Management Ltd.

Mabis Project Management Ltd.

  • China,Foshan ,Guangdong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Durable Shipping Container Pool Convenient Transportation Cost Saving
China Durable Shipping Container Pool Convenient Transportation Cost Saving

  1. China Durable Shipping Container Pool Convenient Transportation Cost Saving

Durable Shipping Container Pool Convenient Transportation Cost Saving

  1. MOQ: 1 Set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms T/T, L/C
Supply Ability 1000 sets per month
Delivery Time 30-45 work days
Packaging Details Bare bundle/40ft HQ
Product Name Container Swimming Pool
Structure Shipping container
Material Steel and insulation panel
Size 20ft or 40ft or modular
Lifetime Main Materials Up to 50 years
Use Home, Hotel, Apartment, Residence
Brand Name MABIS
Model Number M-C-25
Certification SGS
Place of Origin CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, L/C Supply Ability 1000 sets per month
Delivery Time 30-45 work days Packaging Details Bare bundle/40ft HQ
Product Name Container Swimming Pool Structure Shipping container
Material Steel and insulation panel Size 20ft or 40ft or modular
Lifetime Main Materials Up to 50 years Use Home, Hotel, Apartment, Residence
Brand Name MABIS Model Number M-C-25
Certification SGS Place of Origin CHINA
High Light storage container apartmentsshipping container house

Customized Shipping Container Apartment Container Swimming Pool Durable Outdoor Use

 

MABIS Container House

The house will be modified from 40ft or 20ft ISO standard shipping container; Based on in-house modification, floor & wall & roof can all be modified to get good force resistance, heat insulation, sound insulation, moisture resistance; tidy and clean appearance, and easy maintenance; Take you no time to assemble it. electrical tie-in prepared, which would make it very easy to hook-up local system.

 

ADVANTAGES

  1. Easy assembly and disassembly
  2. Convenient transportation
  3. Cost saving (material and labor cost)
  4. Reusable(material & water & electronic system and others)

SPECIFICATIONS

  • Product Name: Shipping Container Swimming Pool
  • Exterior Size: Standard 20ft or 40ft HQ container
  • Ceiling & Wall Panels : 50mm thick color-coated steel EPS sandwich panels or custom standard
  • Doors and Windows:Aluminum alloy sliding bathroom door, sliding toughened glass windows or door
  • Bathroom equipment: Toilet with paper holder; Basin with mirror and cabinet; Integral shower and towel rack.
  • Electricity Items and water system:Distribution boxes with breakers; LED lights; Switches / Sockets & A/C socket; PVC cable tubes & wire; Water plumbing system; Drainage line and drainage cover.

 

FAQ

1.What is prefab house?

 

A prefab house is shortened name for a prefabricated house, which is a home/house that has components manufactured in an off-site industrial facility. They are sometimes referred to as factory-made or modular houses, although there are some differences.

 

2.What Are The Advantages Of Your Prefab House?

 

Light weight,wind resistance,anti-seismic,fire proof,sound proof,environmentally friendly, Quicker to build, Cost effective etc, and the prefab container can be move in anywhere and anytime.

 

3.What is your product range?

 

We specialized in design and manufacturing high-end prefab house,container house,light steel structure villa house,steel structure as well.

 

4.What are your house made of?

 

Our Prefab house is made of light steel structure or shipping containers and cement board or sandwich panels for the walls and roof.

 

5.Prefab container house Installation time?

 

Normally, for light steel structure prefab house 1 skilled worker can install 1-2sqm per day; for shipping container house, most materials are assembled well in factory, it will only need easy connection on site.

 

6.What Should Be Prepare For The Site Before Start To Built?

 

As the prefab container, it no need the foundation, just make sure the land is stable and flat is ok.

Have a nice day! Welcome to contact us!

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Trading Company,Seller

  • Year Established:

    2009

  • Total Annual:

    5000000-10000000

  • Employee Number:

    120~150

  • Ecer Certification:

    Active Member

MABIS PROJECT MANAGEMENT CO LTD offers a wide range of professional services, including architectural and interior design, project and construction management, interior fit-out contracting, design for light steel structure prefabricated homes, prefab modular house and container house etc., and build... MABIS PROJECT MANAGEMENT CO LTD offers a wide range of professional services, including architectural and interior design, project and construction management, interior fit-out contracting, design for light steel structure prefabricated homes, prefab modular house and container house etc., and build...

+ Read More

Get in touch with us

  • Reach Us
  • Mabis Project Management Ltd.
  • Unit 01-02, 19th Floor, Ying Feng Commercial Center, Yi Xing Road, Beijiao County, Shunde District, Foshan City, Guangdong Province, PRC
  • https://www.modern-prefabhomes.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement