Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
ompact 800 mm (30 in) diameter, stainless steel body with bottom flange
24.5 m2 (264 sq ft) filter surface
Maintenance height = 1,100 mm (3.6 ft)
High filtration efficiency due to filtering elements
Low dust emission level filter media
Maintenance-free air jet cleaning unit integrated inside weather protection cover
Safe weather protection cover with lockable quick release
Tool-free filtering element removal
Detail show:
Technical features:
BODY
Filter Suirface
Cleaning method
Connecting way
Maintenance height
Ø800 mm
24.5㎡
Pulse air-jet cleaning continuous working
Flange connection
1100mm
Company Details
Bronze Gleitlager
,
Bronze Sleeve Bushings
and
Graphite Plugged Bushings
from Quality China Factory
Business Type:
Manufacturer,Agent,Importer,Trading Company
Year Established:
2015
Total Annual:
100,0000-500,0000
Employee Number:
>50
Ecer Certification:
Active Member
Shandong ENCKE is dedicated to the production, design and manufacture of biomass energy equipment, waste treatment equipment, small construction machinery and equipment.
The company's business is mainly divided into two parts:
1. The design of the biomass machinery production line and the ... Shandong ENCKE is dedicated to the production, design and manufacture of biomass energy equipment, waste treatment equipment, small construction machinery and equipment.
The company's business is mainly divided into two parts:
1. The design of the biomass machinery production line and the ...