Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 10sets per month |
Delivery Time | 20-25 working days |
Packaging Details | Sea shipping Wooden case |
Application | 5 gallon Bottle water filling |
Capavity | 100-1200 bottles per hour(for 18.9L bottle) |
Automation level | Automatic |
Material | SUS304 |
Installation | Provided |
After sale | Provided |
Power | 1.38KW |
Weight | 400kg |
Brand Name | BOTTLING MACHINERY |
Model Number | QGF-120 |
Certification | CE/ISO9001-2008 |
Place of Origin | Zhangjiagang city Jiangsu provice China |
View Detail Information
Explore similar products
200BPH 3 In 1 Monoblock 20L Barrel 5 Gallon Water Bottling Machine
80BPH Semi Automatic SUS304 18.9L / 5 Gallon Water Bottling Machine
Linear Type Double Row Rinsing SUS304 300 BPH 5 Gallon Water Bottling Machine
300BPH L Type With Rinser Filler Capper 5 Gallon Water Bottling Machine
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 10sets per month |
Delivery Time | 20-25 working days | Packaging Details | Sea shipping Wooden case |
Application | 5 gallon Bottle water filling | Capavity | 100-1200 bottles per hour(for 18.9L bottle) |
Automation level | Automatic | Material | SUS304 |
Installation | Provided | After sale | Provided |
Power | 1.38KW | Weight | 400kg |
Brand Name | BOTTLING MACHINERY | Model Number | QGF-120 |
Certification | CE/ISO9001-2008 | Place of Origin | Zhangjiagang city Jiangsu provice China |
High Light | 120BPH 5 Gallon Water Bottling Machine ,100BPH 5 Gallon Water Bottling Machine ,SUS304 mineral water bottling machine |
Description of 100-120BPH complete PET / PC 3 to 5 gallon water bottling machine
We can supply the whole 5 gallon water packing line, the core of the whole line is the Monoblock 3 in 1 rinser-filler-capper part, first the gallon bottle need to be washer and the cap need to be unplugged, then the 1.2 part reins the bottle, fill the gallon bottle and cap the bottle. When the gallon bottle automatically get out, we can check if there's any Dirty matter in the water by checking the light checker, workers need printer the Production Date on the sleeve label by Solid Ink Roll Coding Machine and manually put the sleeve label on the mouth of gallon bottle, after the shrink tunnel, the label will shrink well.
Equipment list:
Items | Name of machine | Model | Size(mm) | Qty. | |
1.1 | Semi-auto de-capper and brush washer with full SUS304 | BS-1 | 900*900*1250 | 1set | |
1.2 | Monoblock rinser-filler-capper with full SUS304 | QGF-120 | 3400*780*1950 | 1set | |
1.3 | Light checker | / | / | 1pc | |
1.4 | Roller conveyor | / | / | 2m | |
1.5 | Label shrink tunnel | / | 600*600*1000 | 1set | |
1.6 | Solid Ink Roll Coding Machine | LB-380F | 440*345*300 | 1set |
Monoblock rinser-filler-capper
Principle:
This machine is integrated with jar washing-filling-capping functions together;
Worker loads empty jar on jar holder manually, the jar holder with jar will be transferred in advance for jar washing, the transmission force is by gear cylinder;
Washing will be devided into 3 parts, 1st process is by disinfectant fluid, 2nd process is by recycle water washing, 3rd process is by pure water;After washing, the jars will be falling down on angle plate from jar holder by transmission chain with gravity force; Then the jars will be pushed by pushing cylinder to under filling head, then filling start; Filling volume can be controlled by filling time set up. The filled jars will be pushed to under capping head by empty jars afterwards. Worker put lot of disordered caps into cap loader, cap loader will sort cap automatically to load down into cap rail. When filled bottles passing under capping head, cap will fall down onto jar neck, then capping cylinder will do the capping automatically by cap pressing cylinder.
Characters:
1, The whole machine is controlled by PID system, all cylinder travel is calculated in advance for driven distance;
The machine can work under automatic model, manual model is for machine checking;
PID microcomputer system control
Parameters:
Rinsing pump 1: 0.37KW
Rinsing pump 2: 0.37KW
Filling pump: 0.55KW
Cap sorting motor: 0.09KW
Dimension: 3100*570*1450mm (cap loader at side)/2700*570*1720mm (cap loader at top)
+ 2000mm conveyor
Weight: 400kg
Spare parts for free:
Sealing ring for filling valves*1suit
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2011
Employee Number:
50~100
Ecer Certification:
Active Member
ZhangJiaGang City BOTTLING Machinery Co.,Ltd. which was originally set up as an factory in 2011,the company is growing up time by time in research and design, quality and production, sales and after sale service. Our machineries are sold to more than 50 countries in the world and over cross domestic... ZhangJiaGang City BOTTLING Machinery Co.,Ltd. which was originally set up as an factory in 2011,the company is growing up time by time in research and design, quality and production, sales and after sale service. Our machineries are sold to more than 50 countries in the world and over cross domestic...
Get in touch with us
Leave a Message, we will call you back quickly!