Payment Terms | L/C, T/T, D/P |
Supply Ability | 100/Year |
Model NO. | YC1893D-6 Three Phase Meter Test System |
Display | Digital |
Installation | Direct Connected |
Usage | Multi-Functional Energy Meter, Watt-Hour Meter, Meter for Industry and Home Use, Standard Electric Energy Meter, Prepayment Meter, Reactive Energy Meter, Multi-rate Watt-hour Meters, Maximum Demand Meter |
Electric Equipment | Three-phase Three-wire |
Theory | Electronic Meter |
Power Meter Connection | Terminal |
Measured Signal | Pulse Peak |
Type | Energy Meter |
Customized | Customized |
Trademark | GENY |
Transport Package | Plywood Case |
Specification | 12.4CBM |
Origin | China |
HS Code | 9030849000 |
Port | Guangzhou, China |
Brand Name | GENY |
Model Number | YC-1893D |
Certification | ISO, CE |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Terminal Connection Meter Tester Yc1891d-6 Meter Test System Accurate Measuremen
0.02% Accuracy Electricity Meter Test Equipment Precise Single Phase
Three Phase Energy Meter Test Equipment Lab Electric Meter Testing Equipment
One Phase Energy Meter Testing Equipment Semi Automatic Or Manual Operation
Product Specification
Payment Terms | L/C, T/T, D/P | Supply Ability | 100/Year |
Model NO. | YC1893D-6 Three Phase Meter Test System | Display | Digital |
Installation | Direct Connected | Usage | Multi-Functional Energy Meter, Watt-Hour Meter, Meter for Industry and Home Use, Standard Electric Energy Meter, Prepayment Meter, Reactive Energy Meter, Multi-rate Watt-hour Meters, Maximum Demand Meter |
Electric Equipment | Three-phase Three-wire | Theory | Electronic Meter |
Power Meter Connection | Terminal | Measured Signal | Pulse Peak |
Type | Energy Meter | Customized | Customized |
Trademark | GENY | Transport Package | Plywood Case |
Specification | 12.4CBM | Origin | China |
HS Code | 9030849000 | Port | Guangzhou, China |
Brand Name | GENY | Model Number | YC-1893D |
Certification | ISO, CE | Place of Origin | CHINA |
High Light | Powerful Stationary Meter Test Equipment ,Accurate Stationary Meter Test Equipment ,Smart Meter Stationary Meter Test Equipment |
The three-phase meter test system with ICTs features multiple positions up to 40 meters and an accuracy class of 0.02%. It includes a multiple serial port communication system for parallel communication, ideal for testing smart meters.
Power Supply
Voltage | 3x230 / 400 V ±10%, 50 / 60 Hz ±2 Hz |
Frequency | 50 Hz ±15% |
Power capacity | > 6 kVA |
Power efficient(at full load) | ≥85% |
Ambient temperature | -10 °C -- +40 °C |
Relative humidity | 35% - 85% |
Power Source
Voltage | |
Test voltage output (Phase-Neutral) | 3x(24 – 300 V) |
Power of the voltage output | 3×1500VA |
Resolution | Better than 0.01% of full scale value of range |
Setting accuracy | Better than 0.05% at the final range value |
Stability | Better than 0.005%/h (integration time 150 s) |
Load regulation from 0-max. load | < 0.01% |
Distortion factor | < 0.3% for linear resistance load |
Harmonics | 2nd – 41st free programmable |
Current | |
Test current output | 1 mA – 120 A |
Power of the current output | 3×2000VA |
Resolution | Better than 0.01% of full scale value of range |
Setting accuracy | Better than 0.05% at the final range value |
Stability | Better than 0.005%/h (integration time 150 s) |
Load regulation from 0-max. load | < 0.01% |
Distortion factor | < 0.3% for linear resistance load |
Harmonics | 2nd – 41st free programmable |
Phase angle | |
Range | 0 -- 360° |
Resolution | 0.01° |
Setting accuracy | 0.1° |
Frequency | |
Range | 45 Hz – 65 Hz |
Resolution | 0.01 Hz |
GENY's meter test systems adopt the most advanced electronic measurement technology and modular concept combine the differential reference standards and power amplifiers to meet the requirements of customers in electric energy meter manufacturers, electric power utilities, metrology laboratory, measurement and quality inspection departments and factories or enterprises.
The YC1893D Meter Test System is a fully automatic system for testing and calibrating single phase and three phase electrical energy meters, consisting of the following components
The YC1893D meter test system is fully compliant with the IEC 60736 standard and is suitable for testing meters according to the following standards:
Users of testing equipment from GENY have the ultimate responsibility to ensure that anyone working on or near the equipment follows all relevant safety precautions. Safety measures must comply with the requirements specific to this type of testing equipment. In addition to the standard regulations that apply to the workplace, follow the below recommendations. Trained personnel with extensive testing equipment operation knowledge must conduct all work. To prevent injury or fire hazards, do not power on the machine if it is damaged or suspected to be faulty. Avoid operating the machine in damp, wet, condensing, dusty, or explosive gas environments. Incorrect equipment operation can result in hazardous situations, causing harm to the operator and damage to the machine.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1987
Total Annual:
2,000,000-10,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Guangzhou GENY Electric Co. Ltd. is a leading manufacturer of energy meter test systems, whose predecessor is Guangzhou Yangcheng Science & Technology Enterprises Co., Ltd. which was established in 1987. We have been dedicated to the energy meter testing industry for over 30 years, and continuou... Guangzhou GENY Electric Co. Ltd. is a leading manufacturer of energy meter test systems, whose predecessor is Guangzhou Yangcheng Science & Technology Enterprises Co., Ltd. which was established in 1987. We have been dedicated to the energy meter testing industry for over 30 years, and continuou...
Get in touch with us
Leave a Message, we will call you back quickly!