Payment Terms | T/T, L/C, D/P, T/T |
Supply Ability | 5 sets / 1 months |
Delivery Time | 6~8weeks |
Packaging Details | Plywood cases |
Accuracy | 0.05 / 0.02 |
Number of meter positions | 24 |
Power Source | YCS-103-1200 |
Scanning Head | YCG-S Series |
Test voltage Output | 3x(24V~288V)(or customized)3x(24V~288V)(or customized) |
Power of the voltage output | Max 3x500VA |
Stability | Better than 0.005% /h |
Structure | All-in-one |
Usage | Energy Meter Calibration, Lab Research |
Brand Name | GENY |
Model Number | YC1893D |
Certification | ISO, CE |
Place of Origin | China |
View Detail Information
Explore similar products
Stationary Meter Test System With 0.01 Class Accuracy And Optional Standard
YC-1893R High-grade Three-phase Energy Meter Calibration Device
6/12/24/48 MTUs Electric Meter Test Bench Three Phase Energy Meter Test Bench
YC1891D-12 Meter Test Bench Single Phase Terminal Power Meter Connection
Product Specification
Payment Terms | T/T, L/C, D/P, T/T | Supply Ability | 5 sets / 1 months |
Delivery Time | 6~8weeks | Packaging Details | Plywood cases |
Accuracy | 0.05 / 0.02 | Number of meter positions | 24 |
Power Source | YCS-103-1200 | Scanning Head | YCG-S Series |
Test voltage Output | 3x(24V~288V)(or customized)3x(24V~288V)(or customized) | Power of the voltage output | Max 3x500VA |
Stability | Better than 0.005% /h | Structure | All-in-one |
Usage | Energy Meter Calibration, Lab Research | Brand Name | GENY |
Model Number | YC1893D | Certification | ISO, CE |
Place of Origin | China | ||
High Light | 24 positions energy meter tester ,stationary meter test system 24 positions ,stationary energy meter tester |
Stationary Meter Test System for Three Phase Electric Energy Meters 24 Meter Positions
Technical spec. | |
Number of meter positions | 24 |
Accuracy | 0.05 / 0.02 |
Power Source | YCS-103-1200 |
Standard Meter | SZ03A-K6 / SZ03A-K8 |
Scanning Head | YCG-S Series |
Voltage | |
Test voltage output(Phase-Neutral) | 3x(24V~288V)(or customized) |
Power of the voltage output | Max. 3x500VA |
Resolution | Better than 0.01% of full scale value of range |
Setting accuracy | Better than 0.05% at the final range value |
Stability | Better than 0.005% /h (integration time 150s) |
Load regulation from 0~max. load | Better than 0.01% |
Distortion factor | Better than 0.3% for linear resistance load |
Harmonic | 2nd~21st free programmable |
Current | |
Test current output | 3x(1mA~100A) |
Power of the current output | Max. 3x750VA |
Resolution | Better than 0.01% of full scale value of range |
Setting accuracy | Better than 0.05% at the final range value |
Stability | Better than 0.005% /h (integration time 150s) |
Load regulation from 0~max. load | Better than 0.01% |
Distortion factor | Better than 0.3% for linear resistance load |
Harmonic | 2nd~21st free programmable |
Phase angle | |
Range | 0~360⁰ |
Resolution | 0.01⁰ |
Setting accuracy | 0.1⁰ |
Frequency | |
Range | 45Hz~65Hz |
Resolution | 0.01Hz |
Error display | |
Type of error display | Red LED |
Resolution of error displays | 8 digitals |
Other | |
Voltage supply | 3x220/380V±10%(or customized) 50/60Hz ±2Hz |
Ambient temperature | -10°C~+40°C |
Relative humidity | 35%~85% |
1. The meter test system can measure mechanical meter, electronic mechanical meters and electronic meter by ways of automatic, semi-automatic or manual operation.
2. Meters under testing: 3P4W, 3P3W, 1P2W
3. Testing mode: active power, reactive power, cross connected reactive power
4. Simultaneously measure meters with same specifications but different meter constants
5. Automatic positioning rotor mark of disc of mechanical meter, with more efficiency.
6. Starting test and creeping test
7. Neutral current test (optional)
8. Installing the ICT in each meter position to test three-phase meters with closed links between the current and voltage measuring circuits(I-P links)(optional)
9. With the protection function of overload, short voltage circuit and open current circuit.
10. The swing together of the scanning heads simplifies the control.
11. Aluminum alloy material, light and strong and corrosion resistant
12. The testing software with friendly Windows 2000 /XP /7 /8 /10 operation system, includes functional module of all kinds of modern energy meter needed, to reality error test, harmonic test, demand test, influence test etc,.
1. Nation-level utility companies
2. Governmental bureaus of metrology
3. Big energy meter manufacturers
1. High quality product
2. Over 18 months long warranty
3. High accuracy class: 0.05/0.02
4. Can be customized of Three Phase Electric Energy Meter Test bench
5. Extremely high power stability
6. Neutral current test(optional)
7. Timing error test
8. Influence test of voltage, frequency, and harmonic
9. Installing RS232, Ethernet communication port in each meter position.
10. Tilt impact test (optional)
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1987
Total Annual:
2,000,000-10,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Guangzhou GENY Electric Co. Ltd. is a leading manufacturer of energy meter test systems, whose predecessor is Guangzhou Yangcheng Science & Technology Enterprises Co., Ltd. which was established in 1987. We have been dedicated to the energy meter testing industry for over 30 years, and continuou... Guangzhou GENY Electric Co. Ltd. is a leading manufacturer of energy meter test systems, whose predecessor is Guangzhou Yangcheng Science & Technology Enterprises Co., Ltd. which was established in 1987. We have been dedicated to the energy meter testing industry for over 30 years, and continuou...
Get in touch with us
Leave a Message, we will call you back quickly!