Payment Terms | T/T, Western Union, D/P |
Supply Ability | 100,000,000PCS |
Delivery Time | 5-8 days |
Packaging Details | carton package, Blister tray or according to your requests |
material | stainless steel,iron,brass, etc |
color | sliver or do plating according to your request |
process | MIM process(Metal Injection Molding),PM(Powder Metallurgy) |
OEM OR NOT | OEM |
surface treatment | zinc plating,black, polishing, PVD and ETC |
precision | high-precision |
quotoed conidtion | 2D and 3D drawings or samples |
tolerance | ±0.05mm |
application | Homework lock |
heat treatment | no |
Brand Name | no |
Model Number | customized |
Certification | ISO 9001/ TS16949/IECAQC080000 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Electronic Door Lock Cylinder Parts Customizied Smart Door Lock Cylinder
High Precision Lock Parts Combination Bolt Lock 0.05mm Tolerance
Zinc Plating Door Lock Spare Parts Spindle With ISO 9001 TS 16949
MIM Process Lock Parts 304 Stainless Steel Door Lock Spindle
Product Specification
Payment Terms | T/T, Western Union, D/P | Supply Ability | 100,000,000PCS |
Delivery Time | 5-8 days | Packaging Details | carton package, Blister tray or according to your requests |
material | stainless steel,iron,brass, etc | color | sliver or do plating according to your request |
process | MIM process(Metal Injection Molding),PM(Powder Metallurgy) | OEM OR NOT | OEM |
surface treatment | zinc plating,black, polishing, PVD and ETC | precision | high-precision |
quotoed conidtion | 2D and 3D drawings or samples | tolerance | ±0.05mm |
application | Homework lock | heat treatment | no |
Brand Name | no | Model Number | customized |
Certification | ISO 9001/ TS16949/IECAQC080000 | Place of Origin | CHINA |
High Light | OEM door lock spindle ,OEM Spindle Door Knob Set ,Mim Injection Molding Lock Knob |
Customizied Mim Injection Molding Spindle Door Knob Set Components
Customizied Lock Knob And Lock Spindle Components Used in Door Lock by MIM Process
process | metal injection molding, powder metallurgy |
applied software | pro-e, CAD, PDF |
material | iron alloy , stainless steel, copper. ceramic, tungsten alloy |
surface finish | black, plating, PVD, polishing, sandblasting |
tolerance precision | ±0.02~0.05mm |
quality system | 100% inspection before shipment |
dimensions | as per customer's requests |
samples qty | 5-10 pcs(for free) |
certification | ISO 9001, TS 16949, IECQQC080000 |
packgae | plastic bag and carton or as customer's requests |
lead time | base on the qty of order(usually 40-45 days) |
FAQ
1. What is MIM technology ?
MIM (Metal Injection Molding) is a manufacturing technology that combines the shape making complexity of Plastic Injection Molding with the material flexibility of Powder Metallurgy.
2, What's the PM technology?
Powder metallurgy (PM), sometimes referred to as powdered metal sintering, is a process for manufacturing metal parts by heating compacted metal powders just below their melting points. In other words, PM is a metal shaping process that creates near-net parts from powdered metal. Sometimes, the products, manufactured by PM, are known as sintered products.
3.How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.
Customer Inquiry →Engineering Meeting →Cost Analysis →Sales Analysis →Quote to Customer
? 1-3 Work Days Only
? Submit RFQ with complete commercial terms
4. What if we do not have drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
5. How to pay?
For small quantity, we could provide T/T, T/T commission will be added to the order.
For the big one, T/T is preferred.
6. How to ship?
For small quantity, we have cooperation with DHL, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.
Service:
1, 100% checking before shipment.
2, Satisfied packing, carton, pallet,or according to your requests.
3, Samples are within 30-45 days after the receipt of the deposit and the mold manufacture need 30-35 days. production will be finished about 25-30 days after samples confirma
MIM WORKSHOP
Company Details
Business Type:
Manufacturer
Year Established:
1995
Total Annual:
13,000,000-16,900,000
Employee Number:
250~280
Ecer Certification:
Active Member
Sints Precision Technology Co., Ltd was established in 1995, which is a manufacturer of Metal Injection Molding Products, Powder Metallurgy Parts and precision metal parts that other conventional processing produce. Sints has achieved a leadership position in the field of precision parts, provi... Sints Precision Technology Co., Ltd was established in 1995, which is a manufacturer of Metal Injection Molding Products, Powder Metallurgy Parts and precision metal parts that other conventional processing produce. Sints has achieved a leadership position in the field of precision parts, provi...
Get in touch with us
Leave a Message, we will call you back quickly!