Payment Terms | T/T |
Supply Ability | 100000 tons per near |
Delivery Time | 2-10 weeks |
Packaging Details | Plywood cases or pallets |
Material | carbon steel |
Shape | Round |
Technics | Forged |
Type | Cap |
Color | black |
Packing | Plywood cases or pallets |
Brand Name | HEBEIPENGXIN |
Model Number | Steel Pipe Cap 168.3*7.11 |
Certification | ASME |
Place of Origin | CHINA |
View Detail Information
Explore similar products
88.9x7.62 Steel Pipe Cap Asme Butt Weld A234 Wpb Carbon
Wrought A234 WPB 6inch Large Diameter Steel Pipe End Caps SCH80
Seamless Round A234 WP5 Steel Pipe Cap , Stainless Steel Buttweld Caps DN100
A403 INOX 304L 8inch SCH 10S Stainless Steel Weld Caps Forged
Product Specification
Payment Terms | T/T | Supply Ability | 100000 tons per near |
Delivery Time | 2-10 weeks | Packaging Details | Plywood cases or pallets |
Material | carbon steel | Shape | Round |
Technics | Forged | Type | Cap |
Color | black | Packing | Plywood cases or pallets |
Brand Name | HEBEIPENGXIN | Model Number | Steel Pipe Cap 168.3*7.11 |
Certification | ASME | Place of Origin | CHINA |
High Light | 168.3*7.11 steel tube cap ,168.3*7.11 carbon steel pipe cap ,ASME carbon steel pipe cap |
Steel Pipe Cap 168.3*7.11 Thermal insulation and energy saving
Avoid splicing at the r of the disc cap for thinning and high stress.
The weld direction requirements are only radial and circular. This may be removed by large pipe caps. Splsplicing shall be greater than 3 δ, and not less than 100mm (the weld heat impact area is a high stress area with chemical burns in the area. So avoid the high stress area, which is related to the thickness. From practical experience, the stress attenuation length is greater than 3 δ, and not less than 100mm). But the refrigeration equipment is difficult to meet this requirement, which has its particularity.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Trading Company,Seller
Year Established:
2002
Total Annual:
21000000-45000000
Employee Number:
100~200
Ecer Certification:
Active Member
HEBEI PENGXIN PIPELINE EQUIPMENT GROUP CO.,LTD.. was established in the early 1990s, is located in China elbow pipe capital "mengcun" golden hinterland New hope. Here north of Beijing and Tianjin, south of Jinan, east Huanghua port, excellent location, ease of access and the uniq... HEBEI PENGXIN PIPELINE EQUIPMENT GROUP CO.,LTD.. was established in the early 1990s, is located in China elbow pipe capital "mengcun" golden hinterland New hope. Here north of Beijing and Tianjin, south of Jinan, east Huanghua port, excellent location, ease of access and the uniq...
Get in touch with us
Leave a Message, we will call you back quickly!