Payment Terms | T/T, L/C, Western Union |
Supply Ability | 500 pcs / month |
Delivery Time | 3-4 working days |
Packaging Details | Carton box, wood case |
Model | T- NA57 |
Product Name | Turbo rotor complete, Turbocharger Rotor Assembly |
Type | Diesel Engine Turbocharger |
Fuel | Heavy Fuel Oil, Marine Diesel Oil, biofuel and gas operation |
Engine power range | 1650 kW -24,500kW |
Bearing design | Inboard plain bearing design |
Quality | High Perforce, Top and High Level, Guaranteed |
Application | Marine engine, Power engine and Industrial engine |
Brand Name | Marine Turbo |
Model Number | T- NA57 |
Certification | ISO |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
Turbocharger Rotor Shaft / T- TPL65 Bladed Shaft For Marine Turbocharger Parts
T- Turbocharger / T- RU110 Turbine Shaft For Marine Engine And Generator Repair
T- Turbocharger / T- NA series turbine shaft For Axial-Flow Turbine Marine Turbo
T- T-VTR251 Turbocharger Rotor Complete
Product Specification
Payment Terms | T/T, L/C, Western Union | Supply Ability | 500 pcs / month |
Delivery Time | 3-4 working days | Packaging Details | Carton box, wood case |
Model | T- NA57 | Product Name | Turbo rotor complete, Turbocharger Rotor Assembly |
Type | Diesel Engine Turbocharger | Fuel | Heavy Fuel Oil, Marine Diesel Oil, biofuel and gas operation |
Engine power range | 1650 kW -24,500kW | Bearing design | Inboard plain bearing design |
Quality | High Perforce, Top and High Level, Guaranteed | Application | Marine engine, Power engine and Industrial engine |
Brand Name | Marine Turbo | Model Number | T- NA57 |
Certification | ISO | Place of Origin | Jiangsu, China |
High Light | turbocharger rotor complete ,turbocharger spare parts ,T- Turbocharger Rotor Complete |
T- NA57 turbocharger rotor complete (also called rotor assembly) were developed comparatively simply with a cast axial turbine, which is suitable for heavy fuel oil engines, marine diesel oil engines, biofuel and gas operation enginess. T- NA series turbochargers are available for an engine power range from 1,650 kW to 24,500kW per turbocharger and with easy maintenace or overhaul.
T- NA series turbocharger is widely used in Marine engine, Power engine and Industrial engine.
T- TURBOCHARGER | T- NA Series |
T- NA34/T | |
T- NA34/S | |
T- NA40/T | |
T- NA40/S | |
T- NA48/T | |
T- NA48/S | |
T- NA57/N | |
T- NA57/M | |
T- NA57/T7 | |
T- NA57/T8 | |
T- NA57/T9 | |
T- NA70/T7 | |
T- NA70/T9 |
The turbocharger rotor assembly / rotor complete consists of compressor impeller, blade shaf/turbine shaft/rotor shaft and partition wall complete.
The compressor impeller is of aluminium alloy or the more expensive titanium. ufactured from a single casting it is located on the rotor shaft by splines. Aluminium impellers have a limited life, due to creep, which is dictated by the final air temperature. Often the temperature of air leaving the impeller can be as high as 200°C. The life of the impeller under these circumstances may be limited to about 70000 hours. The turbocharger rotor shaft is equipped with components such as a compressor and a turbine impeller, and has a complicated structure and a large weight. If the ship is parked for a long time, the turbocharger rotor will be bent and deformed due to the long-term non-operating self-weight, which will break the matching gap between the rotor and the casing, the gas seal and the casing, and the rotor will be lost.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
1999
Total Annual:
10 million-15 million
Employee Number:
100~150
Ecer Certification:
Verified Supplier
Marine Turbo factory, founded in 1999, is a professional ufacturer for marine turbocharger replacement spare parts and components. The Marine Turbo workshop, occupying more than 18,000 square meters, is located in Yangtze river delta region which is close to the international metropolis, Shangha... Marine Turbo factory, founded in 1999, is a professional ufacturer for marine turbocharger replacement spare parts and components. The Marine Turbo workshop, occupying more than 18,000 square meters, is located in Yangtze river delta region which is close to the international metropolis, Shangha...
Get in touch with us
Leave a Message, we will call you back quickly!