Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 1 - 20000 |
Delivery Time | 10 days |
Packaging Details | Bundle packing:10pcs/bundle or 20pcs/bundle |
Warranty | 3 years |
Weight | 0.85 |
Application | Apartment, Construction |
Raw material | Hot Dipped Galvanized Steel Q195 |
Packing | Pallet |
Length | Customers' Demand |
Design Style | Modern |
Surface treatment | Zinc Coated |
Thickness | 0.12 ----1.50mm |
Feature | Easily Assembled |
Function | Waterproof Fireproof |
Brand Name | DXL |
Certification | IS09001:2015 |
Place of Origin | Hebei,China |
View Detail Information
Explore similar products
Channel Vertical Keel Ceiling Channel Vertical Side Height 45cm
Customized Light Gauge Metal Framing Eco Friendly Material High Load Capacity
Structural Light Gauge Steel Studs Good Flexibility High Strength Framework For
Customizable 0.3mm 1.5mm Thickness Drywall Steel Stud Zinc Coated
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 1 - 20000 |
Delivery Time | 10 days | Packaging Details | Bundle packing:10pcs/bundle or 20pcs/bundle |
Warranty | 3 years | Weight | 0.85 |
Application | Apartment, Construction | Raw material | Hot Dipped Galvanized Steel Q195 |
Packing | Pallet | Length | Customers' Demand |
Design Style | Modern | Surface treatment | Zinc Coated |
Thickness | 0.12 ----1.50mm | Feature | Easily Assembled |
Function | Waterproof Fireproof | Brand Name | DXL |
Certification | IS09001:2015 | Place of Origin | Hebei,China |
eiling System Proportion | |
Gypsum Board 1200×2400×9mm | 1 m2 |
Main Runner | 1 m |
Cross Runner | 3~3.6 m |
Hanger | 2~3 pcs |
Main Runner Connector | 0.5 pcs |
Cross Runner Connector | 1 pcs |
Leveling | 4~6 pcs |
Sleeve Anchor | 1 set |
Cross Screw | 1 set |
Drywall Self Tapping Screw | 25~30 pcs |
Paper Joint Tape / Mesh Joint Tape | 1.5~2 m |
Partition System Proportion | |
Gypsum Board 1200×2400×12mm | 2 m2 |
Metal Stud | 2.2~3.6 m |
Metal Track | 0.7~1.4 m |
Intermediate Channel | 0.8~1.4 m |
Support Card | 4 pcs |
Drywall Self Tapping Screw | 25~30 pcs |
Paper Joint Tape / Mesh Joint Tape | 1.5~2 m |
Partition Installing Method
1. Galvanized Metal Frame
a.The top and bottom keels are fixed respectively top floor and on floor with expansion bolts.
b.The vertical keel should be aligned well according to the requirement (generally being 612 mm) with
laterally supporting keel installed.
2. Board Material Package Fixed
a.Cutting the board material to the dimensions needed (about 10mm lower than wall height)
b.Board material is fixed on keel in anchoring seam way with tapping screw: the interval of tapping screw is generally
about 200~250mm with screws sinking 0.5mm under the board face.
c.The expansion seam of about 4mm between boards should be kept.
d.The shrouding should be fixed from the middle to the four sides and cannot be operated at multipoint simultaneously
to avoid generating inner stress to make board material bucking.
e.Before board being packaged and fixed, depending the needs, glass cotton or rock cotton can be filled.
Ceiling Installing Method
1.Carry out ceiling line-measuring to determine the ceiling’s fixed position, the boom’s central range is generally 1200.
2.Connect and fix the boom and main keel with hanging piece to make the main keel keep level position.
3.Vertically fix the sub-keel to the main keel with hanging piece; the sub-keel axis’central range is 612mm.
4.Install the laterally supporting keel properly, its central ranges is 1224mm.
5.Fix the board on sub-keels with tapping screws, and to well the seam-connecting treatment.
Notice:
The hanging system of TITAN board combined with light steel keel is divided into two kinds of person-standing type
and non person-standing type; for the non person-standing type,only consider the self-weight of ceiling and light.Lamp
without loading other loads; for the person-standing type. Consider about 80~100kg load when someone repaired
Q1.What is your advantage?
A:We are manufacturer,our company has realized 70% mechanical automation, greatly reduce
labors cost. We signed long term contract with several raw materials factory, guarantee lower price & good quality.
Q2.What is your terms of delivery?
A:EXW/FOB/CFR/CIF/DP/LC/OA
Q3.How about your delivery time?
A:For stocks,we can loading goods within 7 days after receiving downpayment.
For production period, it usually needs about 15 days-25days after receiving the deposit.
Q4.Can you product according to the sample?
A:Yes,we can produce according to customers samples or technical drawings. Products can be customized.
Q6.Do you provide samples for free?
A:We can provide samples for free, but you need to pay for DHL express cost.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2011
Total Annual:
2,500,000-5,000,000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
China Dingneng provides comprehensive products and services for cold-formed steel frames and drywall systems. Dingneng is located in the center of Beijing, Tianjin and Shijiazhuang. It is a lime slab frame structure as its main product. Our factory has an advantageous geographical location, adjacent... China Dingneng provides comprehensive products and services for cold-formed steel frames and drywall systems. Dingneng is located in the center of Beijing, Tianjin and Shijiazhuang. It is a lime slab frame structure as its main product. Our factory has an advantageous geographical location, adjacent...
Get in touch with us
Leave a Message, we will call you back quickly!