Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 21000pcs per Month |
Delivery Time | 15-25 days |
Packaging Details | ITEM: VS-TYB-C, CQTY/CTN: 12pcs/CTN, G.W: 14.00kg, CTN SIZE: 53.2*40.2*29cm |
G.W | 14.00kg/ctn |
LEDs | SMD3030 LEDs |
Driver | No-Electrolytic Capacitor Driver |
Lumen | 100lm/w+ |
CRI (Ra>) | 80 |
Warranty(Year) | 5 |
Brand Name | VS |
Model Number | VS-TYB-C |
Certification | CE, CB, ROHS, AS Required |
Place of Origin | Guangdong, China |
View Detail Information
Explore similar products
150W High Power Light Bulb Waterproof 135lm / W High Lumen LED Lamp
6000K High Power LED Bulb 60 / 90 / 120 Degree Different Beam Angle For Gym /
100W High Power LED Bulb No Electrolytic Capacitor Driver Waterproof Lighting
IP65 Waterproof High Power Light Bulb 112 LEDs For Sport Field Lighting
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 21000pcs per Month |
Delivery Time | 15-25 days | Packaging Details | ITEM: VS-TYB-C, CQTY/CTN: 12pcs/CTN, G.W: 14.00kg, CTN SIZE: 53.2*40.2*29cm |
G.W | 14.00kg/ctn | LEDs | SMD3030 LEDs |
Driver | No-Electrolytic Capacitor Driver | Lumen | 100lm/w+ |
CRI (Ra>) | 80 | Warranty(Year) | 5 |
Brand Name | VS | Model Number | VS-TYB-C |
Certification | CE, CB, ROHS, AS Required | Place of Origin | Guangdong, China |
High Light | SMD3030 100W LED Bulb ,100W LED Bulb 100 lm/w+ ,100 lm/w+ daylight led bulbs 100w |
Product Name | High power LED bulb | |||
Model No | VS-TYB-C10 | |||
Power | 100W | |||
LED Qty | 112 LEDs | |||
Lumens | 10000lm+ | |||
Size | Ф125.5*253mm | |||
Package | 53.2*40.2*29cm | |||
NW | 0.95kg | |||
Voltage | 85-277VAC | |||
LED Type | SMD3030 LEDs | |||
Housing color | Dark Grey | |||
Efficiency | 100lm/w or higher | |||
C.R.I | ≥70Ra or ≥80Ra | |||
Color Temp | 6000K | |||
Working Temp | -20℃ - 50℃ | |||
Beam Angle | 120° | |||
Lifespan | >35000 hrs | |||
Warranty | 5years | |||
Application | warehouse lingting / factory lingting / gym lingting / supermarket lingting | |||
Base | E39/E40 |
Q1. Can I have a sample order for High Power LED Bulb?
A: Yes, VS welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. What about the VS lead time ?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than.
Q3. Does VS have any MOQ limit for High Power LED Bulb order ?
A: Low MOQ, 1pc for sample checking is available.
Q4. How do you ship the goods and how long does it take to arrive ?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Company Details
Year Established:
2013
Total Annual:
25 Million-50 Million
Employee Number:
200~300
Ecer Certification:
Site Member
VIKSTARS CO.,LIMITED, founded in 2013, Overseas Marketing Center set in Shenzhen city, manufacturing base located in Zhongshan city. Our company specializing in production and export of Solar LED lighting, LED industrial lighting, LED smart lighting and ernergy storage system. Our main products inc... VIKSTARS CO.,LIMITED, founded in 2013, Overseas Marketing Center set in Shenzhen city, manufacturing base located in Zhongshan city. Our company specializing in production and export of Solar LED lighting, LED industrial lighting, LED smart lighting and ernergy storage system. Our main products inc...
Get in touch with us
Leave a Message, we will call you back quickly!