Payment Terms | L/C, T/T, Western Union |
Supply Ability | 600 sets/year |
Delivery Time | 30-40 days after receive your prepayment |
Packaging Details | The whole Material Handling Transfer Cart will be packed by the tarp, the parts will be packed by polywood case. |
Product name | 5T pipe factory interbay rail electrical load transfer trailer |
Power supply | Electric Power or Custom |
Key Words | electrical load transfer trailer |
Load capacity | 1-300T |
Running speed | 0-20m/min |
Application | Factory ,warehouse and working line |
Warranty | 1 year |
Color | customized |
OEM | Accepted |
Brand Name | Topleader |
Model Number | Rail Transfer Cart |
Certification | CE,ISO9000 |
Place of Origin | China |
View Detail Information
Explore similar products
Fully automatic control 36v low voltage mould rail handling cart
Low Bed 30t Heavy Load Battery Powered Rail Flat Transfer Platform Trolley
Freight yard custom high load battery mold handling rail cart
60MT Slab Deck Automotive Self-Propelled Rail Power Transport Cart System With
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 600 sets/year |
Delivery Time | 30-40 days after receive your prepayment | Packaging Details | The whole Material Handling Transfer Cart will be packed by the tarp, the parts will be packed by polywood case. |
Product name | 5T pipe factory interbay rail electrical load transfer trailer | Power supply | Electric Power or Custom |
Key Words | electrical load transfer trailer | Load capacity | 1-300T |
Running speed | 0-20m/min | Application | Factory ,warehouse and working line |
Warranty | 1 year | Color | customized |
OEM | Accepted | Brand Name | Topleader |
Model Number | Rail Transfer Cart | Certification | CE,ISO9000 |
Place of Origin | China |
5T pipe factory interbay rail electrical load transfer trailer is powered by cable reel. This series of cart is mainly composed of frame, wheel, reel and electrical box. The cable reel is an essential component of the cart.The AC 380V cable is directly introduced into the transfer cart's AC control system to control the motor, in order to the car start, stop, forward, backward and so on. Ac 380V cable which is placed at the bottom of transfer cart supply power to cart through the device of cable reel.
1. It can drive straight, turn, L-shaped, U-shaped and S-shaped.
2. The operation is simple and can be controlled by one button (ordinary steering transfer vehicles need to press two buttons to continuously adjust the direction).
3. Compared with other designs, the turning radius is small, and 360-degree turning can be achieved in a small space.
4. Cost saving, modular design reduces costs and is more convenient.
5. Complete (indoor and outdoor can be used flexibly).
6. Extend the life of the vehicle (replacing the motor is very simple and cheap).
7. Noise pollution is greatly reduced.
8. High intelligent automation can be realized.
Detail
Rated load (T) | 2 | 10 | 20 | 30 | 50 | 63 | 150 | |
Table size | length(L) | 2000 | 3600 | 4000 | 4500 | 5500 | 5600 | 10000 |
Width(W) | 1500 | 2000 | 2200 | 2200 | 2500 | 2500 | 3000 | |
Height(H) | 450 | 500 | 550 | 600 | 650 | 700 | 1200 | |
Wheel Base (mm) | 1200 | 2600 | 2800 | 3200 | 4200 | 4300 | 7000 | |
Rail Inner Gauge (mm) | 1200 | 1435 | 1435 | 1435 | 1435 | 1435 | 2000 | |
Wheel Diameter(mm) | Φ270 | Φ300 | Φ350 | Φ400 | Φ500 | Φ600 | Φ600 | |
Wheel Quantity | 4 | 4 | 4 | 4 | 4 | 4 | 8 | |
Ground Clearance (mm) | 50 | 50 | 50 | 50 | 50 | 75 | 75 | |
Running speed (min) | 0-25 | 0-25 | 0-20 | 0-20 | 0-20 | 0-20 | 0-18 | |
Max Wheel Load (KN) | 14.4 | 42.6 | 77.7 | 110.4 | 174 | 221.4 | 265.2 | |
Reference Weight (t) | 2.8 | 4.2 | 5.9 | 6.8 | 8 | 10.8 | 26.8 | |
Recommended Rail Model | P15 | P18 | P24 | P38 | P43 | P50 | QU100 |
Transfer trailer is suitable for a variety of occasions, can be used in harsh environment, high temperature environment, explosion-proof occasions, but also can be installed on the transfer cart automatic stop, limit device and hydraulic lifting system. Transfer cart start smoothly, long service life, with safety and mobility.
Q: What is the leading time, delivery term, and payment term?
A: Usually our leading time is 30 days.
tags:steel plant steerable transfer vehicle,steel plant rail vehicle
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
2015
Employee Number:
>200
Ecer Certification:
Site Member
Xinxiang New Leader Machinery Manufacturing Co., Ltd is devoted to manufacture and sell lifting and material handling equipment with 15 years experience. NEWLD is a professional and international handling equipment company integrating R&D, design, production and sales. It has a modern manag... Xinxiang New Leader Machinery Manufacturing Co., Ltd is devoted to manufacture and sell lifting and material handling equipment with 15 years experience. NEWLD is a professional and international handling equipment company integrating R&D, design, production and sales. It has a modern manag...
Get in touch with us
Leave a Message, we will call you back quickly!