Payment Terms | L/C, T/T, D/A, D/P, Western Union, MoneyGram |
Supply Ability | 300 Sets per Month |
Delivery Time | 20 days after order confirmed |
Packaging Details | each set protected with resin fiber and PP film, then put into Strong wooden case with operation man |
Wiring method | Three-phase five-wire system |
Power Supply Frequency | 50±5% Hz |
Power Supply Voltage | 380±10% VAC |
Power Factor | > 0.99 |
Max. Power Feedback Efficiency | ≥ 75% |
THD | <5% |
Output Current | 30A, 60A, 100A, 150A, 300A |
Total Output Power | 15KW-60KW |
Voltage Accuracy | ± 0.05% F.S |
Current Resolution: | 1mA |
Data Recording Interval | 10ms |
Current Response Time | 5ms(10%~90% F.S) |
Current Switching Time | 10ms(-90%~90% F.S) |
Cabinet Size(W*D*H Mm) | 600*850*1030 / 600*800*1980 |
Brand Name | Haida |
Model Number | HD-H213-5V |
Certification | CE,,ISO |
Place of Origin | China |
View Detail Information
Explore similar products
Battery Pack Module Charge And Discharge EV Battery Life Cycle Testing Equipment
High Voltage And High Current Lithium Battery Test System For New Energy Battery
High Voltage Battery Pack Testing System 750V/2000V
PCB Battery Protection Board Testing System Power Battery Pack Protection Board
Product Specification
Payment Terms | L/C, T/T, D/A, D/P, Western Union, MoneyGram | Supply Ability | 300 Sets per Month |
Delivery Time | 20 days after order confirmed | Packaging Details | each set protected with resin fiber and PP film, then put into Strong wooden case with operation man |
Wiring method | Three-phase five-wire system | Power Supply Frequency | 50±5% Hz |
Power Supply Voltage | 380±10% VAC | Power Factor | > 0.99 |
Max. Power Feedback Efficiency | ≥ 75% | THD | <5% |
Output Current | 30A, 60A, 100A, 150A, 300A | Total Output Power | 15KW-60KW |
Voltage Accuracy | ± 0.05% F.S | Current Resolution: | 1mA |
Data Recording Interval | 10ms | Current Response Time | 5ms(10%~90% F.S) |
Current Switching Time | 10ms(-90%~90% F.S) | Cabinet Size(W*D*H Mm) | 600*850*1030 / 600*800*1980 |
Brand Name | Haida | Model Number | HD-H213-5V |
Certification | CE,,ISO | Place of Origin | China |
High Light | Acid Battery Cell Testing System ,Li-ion Battery Cell Testing System ,Capacity Test Machine |
Power Battery Cell Testing System 5V
Description:
Power battery cell testing system applied in Li-ion battery, lead acid battery, nickel-cadmium battery testing and quality control, can realize the integration of charge and discharge data monitoring.
Product Function Test
1. Cycle Life Test
2. Charging/Discharging Test
3. Battery Capacity Test
4. Temperature Characteristic Test
5. Charge Retention Test
6. High-Speed Working Condition Pulse Test
7. Static/Dynamic SOC Test
8. DCIR Test
Product Advantages
1. Support single battery voltage consistence test;
2. Support multi-channel charge-discharge curve comparison;
3. Support multi-channel parallel;
4. Power factor value up to 0.99;
5. Anti-reverse connection and data protection;
6. Battery discharge and energy feedback efficiency ≥90%; 7. Modular design, easy for maintenance;
8. Support RS485/CAN communication, baud rate is changeable;
9. Support DBC import at one-click;
10. Support user-defined BMS values as control/protection parameters;
11. BMS voltage and current following test;
12. User-defined login management rights are supported.
Technical Parameters
Models | HD-H213-5V | |||||
AC parameters | Wiring method | Three-phase five-wire system | ||||
Power supply voltage | 380±10% VAC | |||||
Power supply frequency | 50±5% Hz | |||||
Power factor | > 0.99 | |||||
Max. power feedback efficiency | ≥ 75% | |||||
THD | <5% | |||||
DC parameters | Output current | 30A, 60A, 100A, 150A, 300A | ||||
Single channel voltage range | 0.8V~5V | |||||
Voltage accuracy | ± 0.02% F.S | |||||
Voltage resolution | 0.1mV | |||||
Current accuracy | ± 0.02% F.S | |||||
Current resolution | 0.1mA | |||||
Current response time | 5ms(10%~90% F.S) | |||||
Current switching time | 10ms(-90%~90% F.S) | |||||
Min. Working Condition Simulation interval | 10ms | |||||
Upper computer software function | Charging mode | CC, CV, CCCV, CP etc. | ||||
Discharge mode | CC, CV, CP, CR etc. | |||||
Other working mode | Still,Pause,Working condition test,Pulse test,DCIR | |||||
Test cut-of condition | Battey voltage, current, time, capacity, temperature | |||||
Data export Format | Excel, TXT etc. | |||||
Data recording interval | 10ms | |||||
Editable step | Max.10000 | |||||
Programmable step | Max.10000 | |||||
Nested loop | Max.10 layers | |||||
Software protection | OCP/OVP/UVP/Reverse or wrong connection protection/ Protection for abnormal communication | |||||
Third-party Device Integration | Support linkage of temp. chamber, MTV/MTS, and pressure sensor | |||||
Other parameters | IP grade | IP20 | ||||
Working temperature | 0ºC~40ºC | |||||
Cooling method | Forced Fan-cooled | |||||
Noise | <75dB | |||||
Cabinet size(W*D*H mm) | 600*850*1030 / 600*800*1980 |
Details
Why choose us?
1.Design & Production : Solution Consultation for each order
Recommend the most cost -performance machine
Research & Develop the suitable one for Special- designed Model.
2.Shipping & Delivery: One-Stop Service
Production- Deliver to your door - Installation & Training- Technical Support
3.Warranty
1 year warranty with lifetime technology support
4.After-Sale Service
React within 2 Hours
Video inspection & on-site service combined
FAQ
Q: How about your warranty?
Q: What is the order process?
Q: Can we visit your factory before order?
Q: Do you accept customization service?
Description:
BMS battery management testing system is used for parameter calibration, verification, and testing during the developm
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2004
Total Annual:
$ 5 Million-US$ 10 Million
Employee Number:
200~300
Ecer Certification:
Verified Supplier
Haida International Equipment Co., Ltd Company Profile Haida established in 2004 in Dongguan City, where is the “silicon valley” of world manufacturing industry. It is a certified national high-tech enterprise engaged in design, research and development, production, sales, calibr... Haida International Equipment Co., Ltd Company Profile Haida established in 2004 in Dongguan City, where is the “silicon valley” of world manufacturing industry. It is a certified national high-tech enterprise engaged in design, research and development, production, sales, calibr...
Get in touch with us
Leave a Message, we will call you back quickly!