Payment Terms | t/t, L/C |
Supply Ability | 10000pcs each month |
Delivery Time | 7-10 DAYS |
Packaging Details | Standard package for sea transportion |
Application | csl |
Shape | ROUND PIPE |
Surface Treatment | black annealed |
Length | 5.8m |
Material | Carbon steel |
Certificate | SGS |
Brand Name | KWAYT-Sonic |
Certification | SGS |
Place of Origin | Shandong |
View Detail Information
Explore similar products
SONIC STEEL PIPE FACTORY,TUBOS SONICOS,hot sales sonic pipe
Popular push fit type sonic pipe,50mm sonic pipe,Sonic Logging Tubes in Pile
sonic log pipe for Foundation Testing,2" OD sonic pipe with 1mm WT
sonic tubes for concrete
Product Specification
Payment Terms | t/t, L/C | Supply Ability | 10000pcs each month |
Delivery Time | 7-10 DAYS | Packaging Details | Standard package for sea transportion |
Application | csl | Shape | ROUND PIPE |
Surface Treatment | black annealed | Length | 5.8m |
Material | Carbon steel | Certificate | SGS |
Brand Name | KWAYT-Sonic | Certification | SGS |
Place of Origin | Shandong |
KWAYT Sonic tubes are Push-fit type CSL tubes are made by thin black annealed steel tube, with an enlarge end in a bell mouth shape .Specially designed rubber gasket for the bell mouth ensure quick installation and perfect sealing to keep the tube integrity and avoid the entry of other material.
Product Type: | Push Fit type sonic logging pipe |
Material: | Q195 etc |
OD: | 50mm,53mm,57mm,114mm,163mm |
Wall Thickness: | 1-2mm |
Length: | 5.8m or 6m ,etc |
Surface Treatment: | Black annealed |
End finish: | Plain End |
Certification: | Testing report,ISO |
1.Fast and easy installation by worker.
2.Push-fit assembly.
3.No welding required at jobsite.
4.No equipment required.
5.Easy fixing to rebar cage.
6.Push-fit mark to ensure full engagement.
Drilled shafts are prepared for integrity testing by CSL during their construction by installation of at least three sonic tubes. These tubes are usually attached to the reinforcement cage along the full length of the shafts. After concrete has been poured, the tubes are filled with water. In CSL, a transmitter emits an ultrasonic signal in one tube and the signal is sensed some time later by the receiver in another sonic tube. Poor concrete between the sonic tubes will delay or disrupt the signal. The engineer lowers the probes to the bottom of the shaft and moves the transmitter and receiver upward, until the entire shaft length is scanned. The engineer repeats the test for each pair of tubes. The engineer interprets data in the field and later reprocesses it in the office.
1.Install a bottom cap onto the first sonic tube.
2.Fix the sonic tube to the rebar cage by tying the steel wire around the fixing ears and tube.
3.Fix the next tube to the rebar cage as the step 2.
4.Push the two tubes together.(Push-fit mark to ensure full engagement).
5.Ensure that both ears are aligned.Then connect tightly the ears of both tubes with a steel wire.
6.Repeat the process above till all tubes are installed.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2008
Employee Number:
100~200
Ecer Certification:
Site Member
Kwayt Group was founded in 2008,which is engaged in the manufacture and export of many kinds of steel pipes and fittings. Kwayt is a group company, branch companies are shandong chenning steel pipe co.,ltd, Qingdao kwayt co., ltd., shandong kwayt metal products co., ltd., shandong kwayt techno... Kwayt Group was founded in 2008,which is engaged in the manufacture and export of many kinds of steel pipes and fittings. Kwayt is a group company, branch companies are shandong chenning steel pipe co.,ltd, Qingdao kwayt co., ltd., shandong kwayt metal products co., ltd., shandong kwayt techno...
Get in touch with us
Leave a Message, we will call you back quickly!