Payment Terms | T/T 30% advance payment |
Supply Ability | 1 Unit 8 months |
Delivery Time | 8-10 months |
Brand Name | kamach |
Model Number | BBYD 1.0/40/60 |
Certification | CE,EAC |
Place of Origin | China |
View Detail Information
Explore similar products
150m Drilling Depth Mine Raise Boring Equipment AFY1200/ 30/ 150
AFY900-90 Raise Boring Machine 90m Depth Raisebore Driller For Coal Mine
AFY3500/400 Rasing Boring Machine 400m - 700m depth For coal mine shafts winze
AFY1800/40/250 Raise Boring Machine 200m drilling depth RBR Raise Boring Rig
Product Specification
Payment Terms | T/T 30% advance payment | Supply Ability | 1 Unit 8 months |
Delivery Time | 8-10 months | Brand Name | kamach |
Model Number | BBYD 1.0/40/60 | Certification | CE,EAC |
Place of Origin | China | ||
High Light | EAC Raise Boring Equipment ,Electric Raise Boring Equipment ,Hydraulic Box Boring Machine |
The box boring machine is combined with main boring machine, drilling toos, hydraulic system, electric control
system and water supply system, please check below draft drawings.
(1 Main boring machine is combined with boring frame, power unit, mechanic handle, travelling system, etc ;
Main function is: travelling, boring, support, auxiliary movements.
(2 Drilling tools, include standard drilling step, stabilizing drilling stem, stabilizer, pilot drilling bit, reamer, etc.
The main functions are pilot, torque transfer, and mechanic stone crushing.
(3 Hydraulic system, include hydraulic pump station, hydraulic cylinder, hydraulic motor, valve set,instrument
panel and gauges, hoses and fittings, etc. The main functions are: hydraulic power supply, cylinder movement,
motor rotating, etc.
(4 Electric system, include operation station, stroke switch, etc. It is the control system for the raise boring machine,
it controls all movements of the raise boring machine.
(5 Water supply, include water pump, valve set, water hoses, etc. The main function of water supply syste,
is drilling tools cooling, slag discharge, and oi l pump station cooling.
WORKING PROCESS
(1) Preparation.
Check if there is edequate water and electricity supply.Then move the boring machine underneath the project surface;
Connect the main electric cable to the boring machine. Check the hydraulic hosing and electric wiring, and test running.
(2) Pilot drilling
Drive the drilling machine to move up slowly to achieve one pilot hole at planned depth.
Pump water thru the drilling step to cool the drilling bits and hobber, the crushed slag will drop thru th e chute to mining
truck, loader or other earth moving equipment.
(3) Reaming.
When pilot drilling finishes, offload the drilling stem and the pilot drilling bit, mount the reamer, and start reaming.
Then the φ1100mm bore is achieved. Pump water thru the drilling step to cool the drilling bits and hobber, the crushed
slag will drop thru the chute to mining truck, loader or other earth moving equipment.
(4) Finishing.
When the reaming has achieved the required depth, offload all drilling step and drilling tools, clean the well and the
working site, etc. Finish the job.
Company Details
Business Type:
Manufacturer
Year Established:
2016
Total Annual:
20 million-100 million
Employee Number:
60~80
Ecer Certification:
Verified Supplier
KAMACH specializes in mining equipment of various specifications, including underground rock drilling, mining, raise boring, transportation, service, and special needs. We can develop and customize our products according to the actual needs of our customers. After years of painstaking research and d... KAMACH specializes in mining equipment of various specifications, including underground rock drilling, mining, raise boring, transportation, service, and special needs. We can develop and customize our products according to the actual needs of our customers. After years of painstaking research and d...
Get in touch with us
Leave a Message, we will call you back quickly!