Payment Terms | T/T Paypal |
Supply Ability | 30-50sets per month |
Delivery Time | 25-35 work days |
Packaging Details | wooden case |
Material | S136, P20, 718H |
Process | quenching , nitriding , annealing , tempering |
Mold life | 200000-1000000 shots |
gate type | Sub , banana , side , direct , hot sprue , fan gates |
Shaping mode | Plastic Injection Mould,plastic injection molding |
Product material | Plastic |
Product | Electronics parts |
Mould base | LKM |
Mould life | 250000-300000shots |
Cavity | Single/Multi |
Design software | UG,CAD/CAM |
Runner | Hot/Cold as per your requirement |
Mould material | NAK80 |
Product name | Injection Plastic Mold |
Surface treatment | Polish. Etched. Texture |
Color | Can be discussed |
Package | Wooden Case/etc |
Mould cavity | Single Cavity/Multi Cavity |
Name | Plastic Injection Mold Parts |
Size | customized |
Brand Name | RJCMOLD |
Model Number | RJC19010AM |
Certification | ISO 9001:2015 IATF16949 |
Place of Origin | China |
View Detail Information
Explore similar products
Hot Runner Mold Export Complex Mold Structure Design And Manufacture
Precision Auto Parts Mold Size Customized Steel Material With Single / Multi
Steel Material Plastic Injection Molds In Automotive Industry Interior
High Volume Precise Auto Parts Mold RJC19011AM For Auto Structural PA66 Plastic
Product Specification
Payment Terms | T/T Paypal | Supply Ability | 30-50sets per month |
Delivery Time | 25-35 work days | Packaging Details | wooden case |
Material | S136, P20, 718H | Process | quenching , nitriding , annealing , tempering |
Mold life | 200000-1000000 shots | gate type | Sub , banana , side , direct , hot sprue , fan gates |
Shaping mode | Plastic Injection Mould,plastic injection molding | Product material | Plastic |
Product | Electronics parts | Mould base | LKM |
Mould life | 250000-300000shots | Cavity | Single/Multi |
Design software | UG,CAD/CAM | Runner | Hot/Cold as per your requirement |
Mould material | NAK80 | Product name | Injection Plastic Mold |
Surface treatment | Polish. Etched. Texture | Color | Can be discussed |
Package | Wooden Case/etc | Mould cavity | Single Cavity/Multi Cavity |
Name | Plastic Injection Mold Parts | Size | customized |
Brand Name | RJCMOLD | Model Number | RJC19010AM |
Certification | ISO 9001:2015 IATF16949 | Place of Origin | China |
High Light | automotive plastic injection ,molding auto parts mould |
Automotive Plastic Injection Molds Manufacturing Service For Auto Parts Injection Molding
Auto parts molds specification :
Mould standard | HASCO,DME,MEUSBURGER,JIS,CHINA LKM Standard, etc |
Mould base | LKM&Hasco&DME standard (A,B plate 1730,2311,2312,P20 ), etc |
Material main core and cavity insert | DIN2312,2738,2344,718,S136,8407,NAK80,SKD61,H13, etc |
Hardness of steel | 46~56HRC |
Material for Slider ,Lifter and all sub insert use | 1.2767 HRC |
Cavity | Single-cavity ,Multi-cavity |
A surface request: | EDM & High Polish |
Gate | Cold runner,Yudo/DME/HASCO/Synventive Hot runner |
Maximum mould size | 1500*1500 mm |
Mould life time | 500000~+1,000,000 shots |
Quality | ISO9001-2001, ISO/TS16949:2004 certification |
Product material | PA,PA6/6+GF,ABS,POM,PC,PP,PET,TPE,PVC,HDPE etc |
Lead time | 2~7 Weeks |
Package | Wooden/Plywood case for tool ,PE bags add export carton for parts |
Payment terms | T/T, L/C, Western Union, Paypal, etc |
Trade terms | FOB Shanghai, EXW ,CIF, etc |
Export country | Japan, Europe,USA,Mexico,Australia ,Middle-east ,Asia etc |
Value-added service | Polish,texture,painting,screen printing,turnkey project |
Our company introduction :
JC Rapid MFG Factory was established in 2002, after over 16 years development ,it has
grown up to beone of the highly reputable supplier in terms of the service of mold manufacturing ,
injection molding , CNCmachining ,CNC lathing and so on .
With considering new business strategy , JC Rapid decided to built up division of foreign
trading with cuttingdown domestic business in the meanwhile . To a great extent , JC Rapid
took advantage of businessopportunities to expanding business scope for enterprise further
development , and re-positioning companyobjective for the future .
Up to now , JC Rapid has dedicated team to support oversea business in terms of business
development ,engineering support and continuous improvement to guarantee better schedule
and quality delivered .
Q1:Where can I get product&price information?
A1:Send us inquiry e-mail , we will contact you as we receive your mail.
Q2:How long can i get the sample?
A2:Depends on your specific items , within 3-7 days is required generally.
Q3:What's kinds of information you need for quote?
A3:Kindly please provide the product drawing in PDF , and will be better you can provide in STEP or IGS
Q4: what's the payment terms?
A4: We accept 50% as payment deposit, when the goods is done, we take photoes for your check and you then pay the balance.
For small amount, we accept Paypal , Paypal commission will be added to the order. For big amount, T/T is preferred
Q5: How to delivery the goods?
A5:We deliver the products by courier company
Q6.Are you a trading company or factory?
A6:We are direct factory with 17 experienced engineers and more than 50 employees as well approximate 5,000 square meters workshop area.
Q7. What shall we do if we do not have drawings?
A7. Please send your sample to our factory , then we can copy or provide you better solutions. Please send us pictures or drafts with dimensions(Length , Hight , Width),CAD or 3D file will be made for you if placed order.
Q8. Can we get some samples before mass production?
A8:Absolutely
Q9. Will my drawings be safe after sending to you?
A9:Yes, we will keep them well and not release to third party without your permission.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
7000000-10000000
Employee Number:
100~120
Ecer Certification:
Active Member
JC Rapid Factory was established in 2002, after over 16 years development ,it has grown up to be one of the highly reputable supplier in termsof the service of mold manufacturing ,injection molding , CNC machining ,CNC lathing and so on .With considering new business strategy , JCRapid... JC Rapid Factory was established in 2002, after over 16 years development ,it has grown up to be one of the highly reputable supplier in termsof the service of mold manufacturing ,injection molding , CNC machining ,CNC lathing and so on .With considering new business strategy , JCRapid...
Get in touch with us
Leave a Message, we will call you back quickly!