Payment Terms | T/T |
Supply Ability | 20 set/ month |
Delivery Time | 45-60 days |
Packaging Details | Plywood box |
Material | Steel with refractory matter inside |
Size | Customized |
Voltage | 380V |
Power | Depend on the furnace |
Brand Name | Susen |
Place of Origin | China |
View Detail Information
Explore similar products
Experimental Box Type Electric Muffle Furnace With Intelligent Program Temp
FSF4018-1207 Catalyst Roaster Anti Corrosive With 12 Control Temp Zones
Laboratory Tube Industrial Electric Furnace Open / Non Open Style Safety
Multi Layer Insulation Industrial Muffle Furnace , Box Type Furnace 5L Volume
Product Specification
Payment Terms | T/T | Supply Ability | 20 set/ month |
Delivery Time | 45-60 days | Packaging Details | Plywood box |
Material | Steel with refractory matter inside | Size | Customized |
Voltage | 380V | Power | Depend on the furnace |
Brand Name | Susen | Place of Origin | China |
High Light | heat treatment furnace ,lab tube furnace |
Customized well type annealing furnace for bright annealing treatment of copper bars, aluminum alloys, copper alloys
Ⅰ.Application
With the help of the gas of CO2 or N2, The periodic vacuum annealing furnaces makes the non-ferrous metals and black metals heated without oxidizing, thereby to enhance the temperature uniformity and fast the speed of temperature increase. There furnaces are suitable for bright annealing treatment of high required tensile strength, uniform elongation materials such as copper bars, aluminum alloys, copper alloys, multi-element alloys etc.
Ⅱ.Main Technical Parameters
(a)Inner dimension of the furnace:Ф1000*1900mm (140kw)
(b)Wire coin dimension:Ф800*600mm
(c)Occupied dimension: See the drawing
(d)Rated power:140kw/set
(e)Rated voltage & frequency:380V/50HZ
(f)Operating temperature: 600℃
(g)Rated highest temperature:650℃
Ⅲ. Introduction of the structure
The furnace body is made of thermal-protective furnace shell(thermal insulation materials) with heating elements in the wall of furnace.
It is made of stainless steel sheet(S=10mm), and the bottom is pot bottom style. The furnace cover and flange is made of steel processing(S=30mmQ235) by Lathe, and sealed with nitrile - butadiene rubber.
Three - zone temperature control,
PID intelligent temperature controller,
A set of control mode,
Power regulator output.
Ⅳ. Installation
(b) After the electric furnace is in place, connect the outside line with the electric control cabinet, then connect the electric control cabinet with the furnace, and test the circuit and the instruments finally.
Ⅴ. Furnace drying
200℃ constant temperature 6 hours
400℃ constant temperature 6 hours
600℃ constant temperature 6 hours
800℃ constant temperature 6 hours
Ⅵ. Operation
(d) After the heat preservation is over, cut off the heating power of the furnace, the fan will continue to operate, and the meter will still be energized. When the furnace temperature < 250 ℃, hoisting the furnace inner tank out of the furnace wall, the fan continue to work, when the temperature of the furnace inner tank< 100 ℃, the fan and the water supply can be stopped.
Warning: Never stop the fan and water supply during the heating process.
Put the inner tank into the furnace(put the parts into the inner tank firstly)——screw up the nuts (screw the nuts relatively)——pumping vacuum to make the air pressure is 0.1Mpa(about 20 min)——screw up the nuts again(check whether they were tightened),inflate the protective gas(CO2 or N2)(make sure the purity of the CO2 or N2 ,otherwise, the impure gas will affect the brightness of the parts surface.)as much as the scale level(generally 0.05-0.1Mpa)——Put the inner tank into the furnace(check all the joints of the instruments and valves to make sure there’s no gas leakage)——Connect the cooling water of the Fan and inner tank(check if the cooling systems is normally worked),then start on the electric power, the furnace will begin to heat, the operators should never leave the furnace, operate the furnace according to the orders strictly and record the temperature rising time, heat preservation time, cooling time, and watch whether the cooling water and the pressure instrument is normally worked. If there’s any abnormality, the operator should take relative remedial action(Right remedial action is a must, otherwise, may cause some accident)-- after the holding time finished, the instruments, the fan and the cooling water should not be stopped -- the inner tank is hoisted from the furnace wall, it should be cooled naturally or cooled by an air-cooler, at the same time, the cooling water still should not be stopped because the temperature of the inner furnace is still higher than the heat-resistance of the rubber sealing ring -- the parts are taken out of the inner tank(the temperature of the inner furnace <40℃) ,then the parts will be bright and meet the requirement.
Ⅶ. Maintenance and Repair
Company Details
Business Type:
Manufacturer
Year Established:
1998
Total Annual:
4000000-5000000
Employee Number:
100~120
Ecer Certification:
Active Member
Suzhou Sushen Furnaces Co., Ltd. located in Building B6, No. 655, Jinfeng Road, High-tech District, Suzhou City, Jiangsu Province, China. With modern industrial plants, the company has the R & D Center, the Technical Department, the Production Department, the Quality Inspection Department, Sales... Suzhou Sushen Furnaces Co., Ltd. located in Building B6, No. 655, Jinfeng Road, High-tech District, Suzhou City, Jiangsu Province, China. With modern industrial plants, the company has the R & D Center, the Technical Department, the Production Department, the Quality Inspection Department, Sales...
Get in touch with us
Leave a Message, we will call you back quickly!