Payment Terms | L/C, T/T, Western Union |
Supply Ability | 1,000 tons per months |
Delivery Time | Within 60 days after receiving the DP or L/C at sight |
Packaging Details | Iron Frame Packing for exporting |
Application | Industry,oil and gas |
Grade | Nickel Base Alloy,Inconel 625 |
Type | Nickel Pipe,Nickel tube/pipe |
Shape | Inconel tube / pipe |
Material | Inconel,Monel/Inconel/Incoloy/ hastelloy/PH Stainless steel,Inconel 600/UNS N06600 |
Standard | Inconel600,EN,ASTM |
Brand Name | CHEONNY |
Model Number | CBT20210427 |
Certification | ISO, ASME, EN, Grade A |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 1,000 tons per months |
Delivery Time | Within 60 days after receiving the DP or L/C at sight | Packaging Details | Iron Frame Packing for exporting |
Application | Industry,oil and gas | Grade | Nickel Base Alloy,Inconel 625 |
Type | Nickel Pipe,Nickel tube/pipe | Shape | Inconel tube / pipe |
Material | Inconel,Monel/Inconel/Incoloy/ hastelloy/PH Stainless steel,Inconel 600/UNS N06600 | Standard | Inconel600,EN,ASTM |
Brand Name | CHEONNY | Model Number | CBT20210427 |
Certification | ISO, ASME, EN, Grade A | Place of Origin | CHINA |
High Light | ISO N06601 Seamless Boiler Tubes ,CHEONNY Seamless Boiler Tubes Nickel Alloy ,ISO N06600 boiler seamless steel pipe |
UNS N06600 N06601 Nickel Alloy Cladding Boiler Tube For Power Station Long Lifetime
Production Information of Cladding Boiler Tube
Surfacing welding is a welding process in which a layer of wear-resistant, corrosion-resistant and heat-resistant metal layer is deposited on the surface or edge of the workpiece, and the metal is melted by electric welding or gas welding and stacked on the tool or machine parts
Material | Nickel alloy steel / Cladding Boiler Tube |
Grade | N02200, N02201, N08020, N08330, N08800, N08810, N08811, N08825, N06600, N06601, N06625, N06686, N06690, N04400, N10276, N06059 |
Spec. | B161/163, B165, B167, B407, B423, B444, B462, B514, B515, B516, B517, B535, B619, B622, B626, B704, B705, B729 |
O.D. | 6~219MM |
W.T. | 0.50~25MM |
Length | 6 Meters or customized |
Finish | Annealed & Picked or OD Mechanical Polish(up to 600#) or Bright Annealed & OD Polish |
Tolerance | As per spec. |
Application | Petroleum, chemical industry, chemical fiber, smelt, medical machinery, paper making, heat preservation and refrigeration, mechanical equipment, food, electricity, water conservancy, architecture, aerospace, navigation shipbuilding, environmental protection and boiler heat exchanger. |
Package | Standard seaworthy package: 1.plywood case 2.wooden pallet package 3.bundle packageand other package or as customer request. |
MOQ | 500 kilograms |
Supply Ability | 500 tons/month |
Port | Shanghai |
Payment Term | T/T with 30% deposit, balance before shipment |
Delivery Time | Usually within 30-60 days after payment |
The most common problem in surfacing is cracking. The main methods to prevent cracking are as follows
1. Preheat before welding, control interlayer temperature and slow cooling after welding
2. Stress relief heat treatment after welding
3. Avoid multi-layer surfacing and use low hydrogen surfacing electrode
4. If necessary, build up the transition layer between the surfacing layer and the base metal (use the electrode with low carbon equivalent and high toughness)
Attention must be paid to butt welding:
1. According to the use requirements, reasonable selection of surfacing alloy
2. Reduce the dilution ratio of base metal as much as possible
3. Improve productivity
4. It is expected that the hardfacing metal and base metal have similar expansion coefficient and phase transformation temperature
Purpose of surfacing welding of Cladding Boielr Tube :
1. Reduce costs
2. Extend service life
3. Reduce maintenance
4. Reduce spare parts
Our Service
High-quality products supplier
Customized products
Flexible requirements for order size
Diverse products
Competitive price
Professional technical and quality team
Professional sales team
A: We are manufacturer
A: Generally it is 5-10 days if the goods are in stock. or it is 25-35days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample extra
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Seller
Year Established:
2016
Total Annual:
10million-20million
Employee Number:
120~200
Ecer Certification:
Verified Supplier
We are increasing thescale of trade and customers through out the world. With our good reputation we have won the trust of our customers. It’s helps the modernisation of our country and promote the economic and technical exchanges with the rest of the world. We also look forward to enhance the... We are increasing thescale of trade and customers through out the world. With our good reputation we have won the trust of our customers. It’s helps the modernisation of our country and promote the economic and technical exchanges with the rest of the world. We also look forward to enhance the...
Get in touch with us
Leave a Message, we will call you back quickly!