China factories

China factory - Dongguan Kingpo Technology Limited

Dongguan Kingpo Technology Limited

  • China
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China UL746A CTI IEC Test Equipment Tracking Index Flammability Test Chamber
China UL746A CTI IEC Test Equipment Tracking Index Flammability Test Chamber

  1. China UL746A CTI IEC Test Equipment Tracking Index Flammability Test Chamber
  2. China UL746A CTI IEC Test Equipment Tracking Index Flammability Test Chamber

UL746A CTI IEC Test Equipment Tracking Index Flammability Test Chamber

  1. MOQ: 1
  2. Price:
  3. Get Latest Price
standard UL746A
Application evaluate the tracking resistance performance of solid insulating material surface
platinum electrodes 2mm × 5mm
Dropping liquid size 45~50 drip/cm3
Time-delay circuit 2±0.1S
Short-circuit pressure drop 8% MAX
Brand Name KINGPO
Certification calibration certificate
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

standard UL746A Application evaluate the tracking resistance performance of solid insulating material surface
platinum electrodes 2mm × 5mm Dropping liquid size 45~50 drip/cm3
Time-delay circuit 2±0.1S Short-circuit pressure drop 8% MAX
Brand Name KINGPO Certification calibration certificate
Place of Origin China
High Light CTI IEC Test EquipmentUL746A CTI TesterUL746A Flammability Test Chamber

UL746A CTI IEC Test Equipment Tracking Index Flammability Test Chamber

 

UL746A Tracking Index Flammability Test Chamber CTI Tester

 

Electric Leakage Tracking IEC Test Equipment IEC60695 EC60112 Standard of PLC Control

 

Product information:

 

KingPo has designed a series of PLC control with 7 inch touch screen display system test equipment, they are more humanized than the old version ones, and the new version PLC ones have won high reputation from the markets.

 

The automatic tracking leakage tester is designed and manufactured according to the standard requirements of IEC60112,IEC60335-1,IEC60598-1,UL746A and ASTM D3638-92 and etc..

 

Working principle :

The leakage tracking test(tracking index testing) is that the conducting liquid (0.1%NH 4 CL) of required volume in the required height (35mm ) and required time (30s) drops with the voltage between the platinum electrodes(2mm × 5mm )on the surface of solid insulating material. Thus the users evaluate the tracking resistance performance of solid insulating material surface under the combined influence of electric field and humid or contaminate medium. In a word, this device is used to measure the compare tracking index (CTI) and electrical resistance index (PTI).

 

Features:

The test device has a PLC control system and 7 inch color touch screen display system. A gauge block is supplied with the instrument to ensure the electrodes have the proper distance between them. The table height is easily adjustable to ensure the proper angle of the electrodes and height of drops. The rest of the test is controlled from outside the test chamber with the door closed. The voltage, limiting current, drip rate and number of drips are all set on the control panel. An operator should observe the test to see if a flame ignites. The instrument sounds an alarm if there is a tracking failure of at least two seconds.

 

Model specification and technical parameters (Optional for touch screen LT-3):

Parameter model

LT-1(0.1m³)

LT-2(0.5m³)

Control

PLC

PLC

Display

7" color touch screen

7" color touch screen

Working voltage

220V/50Hz or 110V/60HZ

220V/50Hz or 110V/60HZ

Testing voltage

0~600V adjustable,precision 1.5%

0~600V adjustable,precision 1.5%

Timing device

9999X0.1S

9999X0.1S

Electrode

Platinum electrode and brass electrode each for a pair

Platinum electrode and brass electrode each for a pair

Electrode dimension

(5±0.1)×(2±0.1)×(≥12)㎜,

30°slant

(5±0.1)×(2±0.1)×(≥12),

30°slant

Electrode included angle and distance

60°±5°,distance is (4±0.1㎜)

60°±5°, distance is (4±0.1㎜)

Electrode pressure

1.00N±0.05N(digital display is optional)

1.00N±0.05N(digital display is optional)

The interval of dropping liquid

30±5S,adjustable

30±5S,adjustable

Dropping liquid height

35±5mm

35±5mm

Dropping liquid delay

0.2S(solenoid valve opening time)

0.2S(solenoid valve opening time)

Dropping liquid size

45~50 drip/cm3

45~50 drip/cm3

Time-delay circuit

2±0.1S(in 0.5A or larger current)

2±0.1S(in 0.5A or larger current)

Short-circuit pressure drop

8% MAX

8% MAX

Short-circuit current

1±0.1A 1%

1±0.1A 1%

Wind speed

0.2m/s

0.2m/s

Environmental requirement

0~40℃,relative humidity≤80%,in the place of no obvious vibration and corrosive gas

conforms to standard

IEC60695, IEC60112,IEC60335-1,IEC60598-1,UL746A and ASTM D3638-92

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2012

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

  Kingpo Technology Development Limited is a pioneer and leader of global safety testing equipment manufacturer.We offer one-stop service for worldwide labs from R&D,testing,production to after-sales service.We dedicate ourselves in achieving optimal production quality for our customers,...   Kingpo Technology Development Limited is a pioneer and leader of global safety testing equipment manufacturer.We offer one-stop service for worldwide labs from R&D,testing,production to after-sales service.We dedicate ourselves in achieving optimal production quality for our customers,...

+ Read More

Get in touch with us

  • Reach Us
  • Dongguan Kingpo Technology Limited
  • RM C, 13/F, HARVARD COMMERCIAL BUILDING, 105-111 THOMSON ROAD, WAN CHAI, HK
  • https://www.iectest-equipment.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement