Packaging Details | safety box |
Delivery Time | 25~30 working days |
Payment Terms | 100% TT in advance |
Supply Ability | 3~5 units per month |
station | 3 |
Capacitive load | 70uf,140uf,7.3uf |
volume of load power supply | 3*10KVA |
Atmospheric pressure | 80~106kpa |
Environmental temperature | 5~40°C |
size | 1200*760*1830mm |
Brand Name | KingPo |
Place of Origin | China |
Certification | ISO 17025 Calibration certificate |
View Detail Information
Explore similar products
Glove Box For Lab Research
Electrical Contact Indicator For Probe
Insulating Sleeves Abnormal Heat Tester
IEC 60065:2014 B Torque Screwdriver
Product Specification
Packaging Details | safety box | Delivery Time | 25~30 working days |
Payment Terms | 100% TT in advance | Supply Ability | 3~5 units per month |
station | 3 | Capacitive load | 70uf,140uf,7.3uf |
volume of load power supply | 3*10KVA | Atmospheric pressure | 80~106kpa |
Environmental temperature | 5~40°C | size | 1200*760*1830mm |
Brand Name | KingPo | Place of Origin | China |
Certification | ISO 17025 Calibration certificate | ||
High Light | IEC60884 Battery Load Tester ,IEC61058 Battery Load Testing Equipment ,IEC606691 Battery Load Tester |
3 Station Battery Load Tester IEC60884 IEC61058 IEC606691 Standards
Load Box-Power Load Cabinet
Product overview:
This load box is designed and manufactured according to IEC60884,IEC61058,IEC606691 standards and etc. It is used for the on-off ability test and the normal operation lifespan test of the Switches for household and similar fixed-electrical installations. Besides, it is also applied in the test of breaking volume of plug and socket, and mechanical action of normal operation lifespan.
This device is with blue framework and gray cover. The top of this apparatus is the operation control panel on which there are switches for controlling power supply, for the electric capacity conversion and for the load type conversion. There are also the displaying meters of connecting current and voltage as well as power, the buttons of start and stop, alarm, the status indicator light and so on. Below are the according knobs for output voltage adjustment, for current adjustment and for inductance adjustment. There are three load lines. Each of them has the function of resistive, inductive and capacitive Load test. The kind of load test can be chosen by the transferring switch. The load box inside is cooled by the strong wind convection. There are terminals below the load box through which the load box can be connected with the switch and plug-socket endurance tester using the wire. During the process of test, the equipment outputs the current and voltage as well as power.
Technical parameters:
item | parameters | remark | |
1 | Meter Power | single phrase with ground wire AC220V/50Hz | |
Load Power | Three-phrase and four-wire AC380/50Hz(single phrase AC220V,in total three pairs) | ||
2 | Working station | Three stations (It can be customized) | |
3 | Digital display voltage meter | 0~300V,acurancy:±0.5% | |
4 | Digital display current meter | 0~40A,accurancy:±0.5% | |
5 | Digital display power meter | 0~12KW,accurancy:±0.5% | |
6 | Digital display power factor meter | 0.3~0.999,accurancy:±0.5% | |
7 | Load method | Resistive, inductive and capacitive load (three in one) it can be transformed. | |
8 | Capacitive load | 70uf,140uf,7.3uf can be chosen. | |
9 | Load output | Each power and interval power can be chosen. | |
10 | Counter | 0~999999,it can be preset. | |
11 | The volume of load power supply | 3*10KVA | |
12 | The maximum of the output current | 30A,when it exceeds 32A, it stopped automatically. | |
13 | The maximum of the output voltage | 300V, when it exceeds 305V, the load is stopped automatically. | |
14 | Atmospheric pressure | 80~106kpa | |
15 | Environmental temperature | 5~40°C | |
16 | Relative humidity | (20~90)%RH | |
17 | Using place | No violent shaking
Without electromagnetic interference and dust. No explosive or corrosive gas. Good heat dissipation |
|
18 | Size and weight | L*W*H=1200*760*1830mm,800kg |
Company Details
Business Type:
Manufacturer
Year Established:
2012
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Kingpo Technology Development Limited is a pioneer and leader of global safety testing equipment manufacturer.We offer one-stop service for worldwide labs from R&D,testing,production to after-sales service.We dedicate ourselves in achieving optimal production quality for our customers,... Kingpo Technology Development Limited is a pioneer and leader of global safety testing equipment manufacturer.We offer one-stop service for worldwide labs from R&D,testing,production to after-sales service.We dedicate ourselves in achieving optimal production quality for our customers,...
Get in touch with us
Leave a Message, we will call you back quickly!