Delivery Time | 8 ~ 12 months |
Packaging Details | Seaworthy Package |
Application | On-site Hydrogen Generation |
Performance | High Reliabilityy |
Footprint | Modularization |
Technology | Mature and Advanced |
Automation | High degree |
Efficiency | High |
Module | Pre-fabricated skid |
Brand Name | Ally Hi-Tech |
Place of Origin | China |
View Detail Information
Explore similar products
Pre Fabricated Skid On Site Hydrogen Generator Plant Anti Abrasive
On Site Hydrogen Generation Hydrogen Purification System Easy Maintain
Pre Fabricated Skid On Site Hydrogen Generator High Degree Automation
Small Scale On Site Hydrogen Generator , Natural Gas Hydrogen Generator
Product Specification
Delivery Time | 8 ~ 12 months | Packaging Details | Seaworthy Package |
Application | On-site Hydrogen Generation | Performance | High Reliabilityy |
Footprint | Modularization | Technology | Mature and Advanced |
Automation | High degree | Efficiency | High |
Module | Pre-fabricated skid | Brand Name | Ally Hi-Tech |
Place of Origin | China | ||
High Light | hydrogen purification system ,smr steam methane reformer |
Durable On Site Hydrogen Generator, Hydrogen Generation Plant For Hydrogen Distribution
General
Ally Hi-Tech optimized the process of SMR, incluidng the reformer, heat exchange network (HEN) and purification system, to reduce both capital investmetn and natural gas consumption, on the basis of the gas preparation system of ammonia synthesis process. Typically, Ally Hi-Tech has been engaged in the optimization of the reformer and granted more than 6 patents in this field. Ally Hi-Tech provided the hydrogen solution with a capacity of 50 NCMH for Beijing Olympics based on the SMR process associated with PSA in 2008.
Features
Mature production technology, safe and reliable operation.
Safe and practical operation control with high degree of automation.
Low operating costs and short payback period.
Off-gas of PSA recovered as fuel reduces both fuel consumption and exhaust emissions.
Pre-fabrication skid
Pre-fabricated top-fired cylinder reformer saving huge on-site installation work
Process Schematic
Process Description
Desulphurization gas is mixed with steam as per a certain ratio. The mixutre flows through the Reformer Tubes, where it converts into syngas consisting of hydrogen and carbon monoxide and carbon dioxide and unreacted methane and steam in the presence of catalyst. A heat exchange system is used as economizer, while a shift convertor is introducted to convert carbon monoixed into extra hydrogen and carbon dioxide. The resulting gas enters into a PSA unit, where the hydrogen is separated from the other gases. The off-gas of PSA is recovered as fuel.
Reaction
CH4+H2O →3H2+CO - Q
CO+H2O → H2+CO2+Q
Performance
Hydrogen Capacity: 1,200 kg/d ~ 6,000 kg/d
Hydrogen Purity: 99.99% (v/v)
Hydrogen Pressure: 1.5 MPaG
Temperature: ambient
Company Details
Business Type:
Manufacturer
Year Established:
2000
Total Annual:
27,000,000-30,000,000
Employee Number:
100~300
Ecer Certification:
Verified Supplier
Founded in 2000, Ally Hi-Tech is an engineering company dedicated to providing engineering service of industrial gas, especially hydrogen. From design, construction to on-site guidance, after-sale maintenance, Ally has professional teams and provide our clients with customized service. ... Founded in 2000, Ally Hi-Tech is an engineering company dedicated to providing engineering service of industrial gas, especially hydrogen. From design, construction to on-site guidance, after-sale maintenance, Ally has professional teams and provide our clients with customized service. ...
Get in touch with us
Leave a Message, we will call you back quickly!