Payment Terms | L/C, T/T |
Supply Ability | 30 Set/Sets per Month |
Delivery Time | 120days |
Packaging Details | wood box |
Frequency | 50Hz/60Hz |
Insulation class | F/F |
Governor: | High Hydraulic Microcomputer Governor |
Control system | Automation Control System |
Valve | Butterfly valve / gate valve |
Voltage | 380v,400v,6300v,11kv |
Design head | 15-40m |
Design flow | 1.43-12.34m3/s |
Pipe diameter | DN800-1750mm |
Generator | 3-phase alternator |
Brand Name | Forster |
Model Number | HL240C-WJ |
Certification | CE/TUV/ISO9001 |
Place of Origin | Sichuan, China (Mainland) |
View Detail Information
Explore similar products
200kw 300kw 500kw Hydro Turbine Generator Used In Hydroelectric Power Plant
1 Mw Francis Hydro Turbine Generator Equipped With Automated Control Panel
Horizontal Hydro Francis Turbine With Free Energy Excitation Generator And
Low Speed Francis Hydro Turbine Generator Of Hpp Microcomputer Control
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 30 Set/Sets per Month |
Delivery Time | 120days | Packaging Details | wood box |
Frequency | 50Hz/60Hz | Insulation class | F/F |
Governor: | High Hydraulic Microcomputer Governor | Control system | Automation Control System |
Valve | Butterfly valve / gate valve | Voltage | 380v,400v,6300v,11kv |
Design head | 15-40m | Design flow | 1.43-12.34m3/s |
Pipe diameter | DN800-1750mm | Generator | 3-phase alternator |
Brand Name | Forster | Model Number | HL240C-WJ |
Certification | CE/TUV/ISO9001 | Place of Origin | Sichuan, China (Mainland) |
High Light | water turbine electric generator ,water powered electric generator |
China Top 3 Hydro Turbine Manufacturers Supplier Provide The Best Solution Hydro Turbine For Your Hydropower Plant
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Product features :
The Francis turbine was invented by American engineer Francis in 1849. The water flowed radially from the periphery into the runner and then exited the runner approximately axially. The runner consisted of the upper crown, the lower ring and the blades, and the volute. The current development trend is high head, large capacity, high specific speed and high efficiency. The Francis turbine is simple in structure. The main components include the volute, seat ring, water guiding mechanism, top cover, runner, main shaft, guide bearing (see turbine guide bearing), bottom ring and draft tube. The main features are as follows:
1. Suitable for low head and large flow;
2. Pressure inlet, pressure outlet; pipeline water, pipeline water.
3. The turbine is separated from the generator for easy maintenance and replacement of wearing parts.
4. The turbine has 3 separate bearings and 2 generators for more reliable structure.
5. The turbine bearing has an independent oil lubrication system, and the bearing life is longer.
6. Brushless excitation generator, no need to replace the carbon brush, maintenance is more convenient.
Product parameters:
HL-WJ-Francis tubine generator unit | Generator | Gevernor or Regulating work | Valve | ||||||
Turbine | |||||||||
Type | Water head(m) | Discharge (m³/s) | Speed (r/min) | Power(kw) | Efficiency(%) | ||||
HL240C-WJ-50 | 15 | 1.43 | 600 | 183 | 86.9 | SFW160-10/740 | YT-3000 | Z941H-6Dg800 | |
17 | 1.53 | 600 | 219.6 | 86.2 | SFW200-10/740 | ||||
20 | 1.64 | 750 | 280.9 | 87.1 | SFW250-8/740 | ||||
23 | 1.77 | 750 | 348.3 | 87 | SFW320-8/850 | ||||
27 | 1.92 | 750 | 438.4 | 86.1 | SFW400-8/850 | ||||
30 | 2.03 | 750 | 509.9 | 85.5 | SFW500-8/850 | ||||
36 | 2.21 | 1000 | 680.6 | 87.2 | SFW630-8/990 | ||||
40 | 2.34 | 1000 | 799.8 | 87.1 | SFW800-6/1180 | ||||
HL240C-WJ-60 | 13 | 1.91 | 500 | 213.4 | 87.7 | SFW200-12/850 | YT-3000 | PDF6-WDDg1000 | |
15 | 2.06 | 500 | 265.7 | 87.5 | SFW250-12/850 | ||||
18 | 2.25 | 600 | 349 | 87.5 | SFW320-10/990 | ||||
21 | 2.43 | 600 | 438.6 | 87.8 | SFW400-10/990 | ||||
24 | 2.61 | 600 | 534 | 86.9 | SFW500-10/990 | ||||
28 | 2.8 | 750 | 673 | 87.5 | SFW630-8/990 | YT-6000 | |||
32 | 2.99 | 750 | 816.6 | 86.9 | SFW800-8/990 | ||||
37 | 3.24 | 750 | 1023.4 | 87 | SFW1000-8/990 | ||||
40 | 3.37 | 750 | 1143.8 | 86.5 | SFW1000-8/990 | ||||
HL240C-WJ-71 | 18 | 3.14 | 500 | 489.6 | 88.2 | SFW500-12/990 | YT-3000 | PDF6-WDDg1200 | |
22 | 3.5 | 500 | 658.6 | 87.2 | SFW630-12/1180 | ||||
26 | 3.78 | 600 | 850 | 88.2 | SFW800-10/1180 | ||||
30 | 4.06 | 600 | 1051.1 | 88 | SFW1000-10/1430 | ||||
34 | 4.35 | 600 | 1268.1 | 87.3 | SFW1250-10/1430 | ||||
38 | 4.6 | 600 | 1498.4 | 87.4 | SFW1600-10/1430 | ||||
HL240C-WJ-84 | 17 | 4.3 | 375 | 634 | 88.3 | SFW630-16/1430 | YT-6000 | PDF6-WDDg1250 | |
20 | 4.67 | 375 | 799.9 | 87.3 | SFW800-16/1430 | ||||
24 | 5.12 | 428.6 | 1058.8 | 87.9 | SFW1000-14/143 | YT-10000 | |||
28 | 5.49 | 500 | 1338.7 | 88.8 | SFW1250-12/1430 | ||||
32 | 5.91 | 500 | 1631.9 | 88 | SFW1600-12/1730 | YT-18000 | |||
37 | 6.35 | 500 | 2005.9 | 87 | SFW2000-12/1730 | ||||
HL240C-L(W)J-100 | 20 | 6.48 | 300 | 1106.9 | 87 | SF1000-20/2150 | YT-10000 Or YWT-10000 YWT18000 | PDF6-WYDg1250 | |
25 | 7.4 | 375 | 1608 | 88.6 | SF1600-16/2600 | ||||
30 | 8.1 | 375 | 2070.7 | 86.8 | SF2000-16/2600 | ||||
34 | 8.63 | 428.6 | 2544 | 88.4 | SF2500-14/2600 | ||||
38 | 9.06 | 500 | 3016.6 | 89.3 | SF3200-12/2600 | ||||
HL240C-LJ-120 | 18 | 9.04 | 250 | 1389 | 87 | SF1250-24/2600 | YT18000 YWT18000 | PDF60-WYDg175 | |
22 | 9.93 | 300 | 1907.1 | 89 | SF2000-20/2600 | ||||
25.5 | 10.76 | 300 | 2369.1 | 88 | SF2000-20/2600 | ||||
29.5 | 11.58 | 333.3 | 2961.3 | 88.4 | SF2500-18/2600 | YT30000 YWT-30000 | |||
33.5 | 12.34 | 375 | 3607.9 | 89 | SF3200-16/2600 |
Product pictuers:
Installation design drawings:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website:www.fstgenerator.com
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1956
Total Annual:
50000000-80000000
Employee Number:
100~120
Ecer Certification:
Active Member
Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu... Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu...
Get in touch with us
Leave a Message, we will call you back quickly!