China factories

China factory - Chengdu Forster Technology Co., Ltd.

Chengdu Forster Technology Co., Ltd.

  • China,Chengdu ,Sichuan
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Fully Automatic Microcomputer Hydraulic Governor For Hydro Turbine Gennerator
China Fully Automatic Microcomputer Hydraulic Governor For Hydro Turbine Gennerator

  1. China Fully Automatic Microcomputer Hydraulic Governor For Hydro Turbine Gennerator
  2. China Fully Automatic Microcomputer Hydraulic Governor For Hydro Turbine Gennerator

Fully Automatic Microcomputer Hydraulic Governor For Hydro Turbine Gennerator

  1. MOQ: 1set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 30set/month
Delivery Time 90days
Packaging Details wood box
Function 1 Active power regulation
Function 2 Fast automatic synchronization
Function 3 Detection of electrical fault
Function 4 Increase or decrease load and load operation
Function 5 Guide vane opening
Function 6 Adopt PID intelligent control
Keyword Hydro Turbnine Governor
Function 7 Rated oil pressure 2.5-4.0mpa
Brand Name Forster
Model Number GSZWT
Certification CE/TUV/ISO9001/From-E
Place of Origin Sichuan, China (Mainland)

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 30set/month
Delivery Time 90days Packaging Details wood box
Function 1 Active power regulation Function 2 Fast automatic synchronization
Function 3 Detection of electrical fault Function 4 Increase or decrease load and load operation
Function 5 Guide vane opening Function 6 Adopt PID intelligent control
Keyword Hydro Turbnine Governor Function 7 Rated oil pressure 2.5-4.0mpa
Brand Name Forster Model Number GSZWT
Certification CE/TUV/ISO9001/From-E Place of Origin Sichuan, China (Mainland)
High Light hydraulic governorwater generator parts

Fully automatic GSZWT Microcomputer Hydraulic Governor For Hydro Turbine Gennerator
 
Main Products:
 
1. Kaplan turbine generators series.
 
2. Turgo turbine generators series.
 
3. Tubular turbine generators series.
 
4. Francis turbine generators series.
 
5. Pelton turbine generators series.
 
Product features:
           

As an important part of the turbine, the turbine governor is extremely complex and directly affects the operation of the turbine. Hydropower
Turbine governor.


In the operation of the station, in order to ensure the normal operation of the turbine, it is necessary to ensure that the functions of the turbine governor can function normally. Based on this, when using the turbine, the turbine governor should be commissioned to support the normal and stable operation of the turbine. In order to ensure the commissioning effect of the turbine governor, the relevant staff should have a certain understanding of the working principle of the turbine governor, and must master the corresponding debugging techniques, methods and processes, preferably with certain turbine governor debugging experience. In order to better carry out the commissioning of the turbine governor.
Commissioning of the turbine governor can be done in two steps, namely experimentation and testing. When commissioning the turbine governor, the relevant personnel should first perform static and dynamic experiments on the turbine to detect all aspects of the turbine governor during use, thereby regulating the turbine. The normal use of the device provides protection.

 

Hydraulic machine speed as an important equipment of power plant, played a key role for the normal operation of the hydropower station, and hydropower station can normal power work are inseparable, once the governor fails, will directly related to the turbine units, and the safe and stable operation of power system, so the hydropower station workers attach great importance to the debugging and maintenance of turbine speed, timely commissioning, maintenance, maintenance of turbine speed, to the greatest degree of avoid turbine speed problems, to guarantee the normal work of the hydropower station.


1. measure the frequency of the unit and the power grid, and realize the frequency regulation of the unit when it is running without load or in isolation;
 
2. when no load is on, the unit frequency automatically tracks the power grid frequency, which is convenient for rapid automatic synchronization;
 
3. manually start and stop, increase and decrease load, and operate with load;
 
4. automatically start and stop the machine, and automatically adjust unit output according to permanent slip (bp) after grid connection;
 
5. switch automatically and manually unconditionally and without disturbance;
 
6. main parameters and operation status of speed regulators such as machine frequency, network frequency, guide blade opening, manual and automatic are displayed on the display screen;
 
7. able to set the operating parameters of the governor through the display screen;
 
8. when an electrical fault is detected, it can be automatically cut to manual and the load can be fixed in the state before the fault.
 
9. high reliability programmable controller (PLC), small size, strong anti-interference ability, and an average trouble-free time of more than 300,000 hours;
 
10. software frequency measurement can meet the requirements of timing and accuracy of frequency measurement;
 
11. PID intelligent control, with good stability and adjustment quality
 
Product pictures:
 
             

 
Company Information:
 

 

Our workshop

 

 
Advantages:
 

 

Packaging & Shipping

 

FAQ

 

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

 

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

 

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

 

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

 

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

 

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

 

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.   

website address: www.fstgenerator.com

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1956

  • Total Annual:

    50000000-80000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Active Member

Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu... Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu...

+ Read More

Get in touch with us

  • Reach Us
  • Chengdu Forster Technology Co., Ltd.
  • Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA
  • https://www.hydro-turbinegenerator.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement