Supply Ability | 30 Set/Sets per Month |
Packaging Details | wood box |
Delivery Time | 120days |
Certificate | IS09001/CE/TUV |
Water Head | 50-240m |
Flow Rate | 0.134-0.294m3/s |
Design speed | 410-900r/min |
Power | 55-500kw |
fly away | 1500r/min |
Rated Voltage | 220V/380V/400V |
Frequency | 50Hz/60Hz |
Design life | 30-60years |
Keyword | small hydro power generator |
Port | shanghai/shenzhen |
Place of Origin | Sichuan, China (Mainland) |
Brand Name | Forster |
Model Number | CJ237-W-65/1*7.5 |
Certification | CE/TUV/ISO9001/From-E |
View Detail Information
Explore similar products
200kw 300kw 500kw Hydro Turbine Generator Used In Hydroelectric Power Plant
1 Mw Francis Hydro Turbine Generator Equipped With Automated Control Panel
Horizontal Hydro Francis Turbine With Free Energy Excitation Generator And
Low Speed Francis Hydro Turbine Generator Of Hpp Microcomputer Control
Product Specification
Supply Ability | 30 Set/Sets per Month | Packaging Details | wood box |
Delivery Time | 120days | Certificate | IS09001/CE/TUV |
Water Head | 50-240m | Flow Rate | 0.134-0.294m3/s |
Design speed | 410-900r/min | Power | 55-500kw |
fly away | 1500r/min | Rated Voltage | 220V/380V/400V |
Frequency | 50Hz/60Hz | Design life | 30-60years |
Keyword | small hydro power generator | Port | shanghai/shenzhen |
Place of Origin | Sichuan, China (Mainland) | Brand Name | Forster |
Model Number | CJ237-W-65/1*7.5 | Certification | CE/TUV/ISO9001/From-E |
High Light | water turbine electric generator ,water powered electric generator |
Customized Automatic Control System Brushless Excitation 100m Water Head Pelton Turbine Micro Hydro Power Generator
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Product features:
Hydraulic turbines are power machines that convert the energy of water flow into rotating mechanical energy. They belong to turbomachinery in fluid machinery. As early as 100 BC or so, the prototype of water turbine appeared in China water wheel, used for irrigation and driving grain processing equipment. Most modern turbines are installed in hydroelectric power stations, which are used to drive generators to generate electricity. In hydropower stations, the water in the upstream reservoir is directed to the turbine through the diversion pipe, driving the turbine runner to rotate and driving the generator to generate electricity. The water after work is drained downstream through the tail water pipe. The higher the head and the larger the flow, the greater the output power of the turbine.
The Pelton turbine is a special hydraulic propulsion mechanism that draws a free jet with kinetic energy, rushes to the runner bucket, and rotates the runner to do work, thereby completing a hydraulic prime mover that converts water energy into mechanical energy. In the impact turbine, the difference between the working jet and the relative position of the runner and the number of work can be divided into a tapping turbine, a slanting turbine and a double-click turbine.
1. suitable for high head,small flow and flow changes in large runoff hydropower station.
2. With the power plant investment is small,compact units structure characteristics.
3. Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.
4. Suitable for high head,small flow station in mountainous area.
5. A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.
t cavitation condition,the advantages of stable operation,less investment,construction area.
CJ237-W-65/1x7.5 Hydro Tubine Performance Data And Supporting Table | |||||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | Speed Way | Water Intake | ||||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | Rated speed(r/min) | Runaway speed(r/min) | Vavel control | Guide vane control | Diameter (mm) | |||
Flow rate (m3/s) | The output(kw) | ||||||||||
CJ237-W-65/1x7.5 | 50 | 0.134 | 53 | 410 | 55 | 750 | 1500 | Direct connection or Belt connection | automatic/Manual | Z41H-2.5 | 300 |
60 | 0.148 | 69.7 | 150 | 55 | 750 | 1500 | automatic/Manual | “ | |||
70 | 0.159 | 89.8 | 486 | 75 | 750 | 1650 | “ | ||||
80 | 0.17 | 108 | 520 | 100 | 500 | 900 | automatic/Manual | “ | |||
90 | 0.181 | 129 | 550 | 125 | 600 | 1080 | “ | ||||
100 | 0.19 | 152 | 580 | 125 | 600 | 1080 | automatic/Manual | “ | |||
110 | 0.199 | 174 | 610 | 160 | 600 | 1080 | “ | ||||
120 | 0.208 | 197 | 636 | 200 | 600 | 1080 | automatic/Manual | “ | |||
130 | 0.214 | 220 | 662 | 200 | 600 | 1350 | “ | ||||
140 | 0.225 | 250 | 688 | 250 | 750 | 1350 | automatic/Manual | “ | |||
150 | 0.233 | 279 | 713 | 250 | 750 | 1350 | “ | ||||
160 | 0.241 | 308 | 736 | 320 | 750 | 1350 | automatic/Manual | “ | |||
170 | 0.248 | 355 | 758 | 320 | 750 | 1350 | “ | ||||
180 | 0.254 | 362 | 779 | 320 | 750 | 1350 | automatic/Manual | “ | |||
190 | 0.262 | 390 | 800 | 400 | 750 | 1350 | “ | ||||
200 | 0.269 | 422 | 820 | 400 | 750 | 1350 | automatic/Manual | “ | |||
210 | 0.275 | 448 | 840 | 400 | 750 | 1350 | “ | ||||
220 | 0.282 | 448 | 860 | 400 | 750 | 1350 | automatic/Manual | “ | |||
230 | 0.288 | 518 | 880 | 500 | 1000 | 1800 | “ | ||||
240 | 0.294 | 557 | 900 | 500 | 1000 | 1800 | automatic/Manual | “ |
Product pictures:
Installation picture:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1956
Total Annual:
50000000-80000000
Employee Number:
100~120
Ecer Certification:
Active Member
Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu... Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu...
Get in touch with us
Leave a Message, we will call you back quickly!