Payment Terms | L/C, T/T |
Supply Ability | 50 Piece/Pieces per Month |
Delivery Time | 120days |
Packaging Details | wood box |
design head | 9-16m |
traffic | 2.16-2.88m3/s |
the output | 158-375kw |
design speed | 750-1000r/min |
the power of generator | 135-300KW |
rated speed | 750-1000r/min |
diameter | 800mm |
Port | shanghai/shenzhen |
Processing method | CNC machining / constant temperature annealing |
Generator phase number | 3 phase |
Brand Name | Forster |
Model Number | GL-P-502-55 |
Certification | CE/TUV/ISO9001/From-E |
Place of Origin | Sichuan, China (Mainland) |
View Detail Information
Explore similar products
Low Head Hydro Power Generator Efficiency 500KW With Stainless for Sell
Low Head Pipe Installation Tubular Hydro Turbine 20kw To160kw For Hydro Power
200KW Tubular Turbine Generator / Floating Water Turbine Generator Unit
100 - 240kw Small Hydroelectric Power Generator Tubular Type Long Lifespan
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 50 Piece/Pieces per Month |
Delivery Time | 120days | Packaging Details | wood box |
design head | 9-16m | traffic | 2.16-2.88m3/s |
the output | 158-375kw | design speed | 750-1000r/min |
the power of generator | 135-300KW | rated speed | 750-1000r/min |
diameter | 800mm | Port | shanghai/shenzhen |
Processing method | CNC machining / constant temperature annealing | Generator phase number | 3 phase |
Brand Name | Forster | Model Number | GL-P-502-55 |
Certification | CE/TUV/ISO9001/From-E | Place of Origin | Sichuan, China (Mainland) |
High Light | micro hydroelectric turbine ,water powered cross flow turbine generator |
Design Complex High Efficiency Low Loss Easy Installation Tubular Turbine Generators For Hydro Power Plant
Our main products included:
1, Kaplan turbine generators series
2, Turgo turbine generators series
3, Tubular turbine generators series
4, Francis turbine generators series
5, Pelton turbine generators series
Product features:
Tubular turbine is a new type of generating unit which develops low head hydraulic resources and is suitable for the head under 25m. This type of flow path is straight, is a horizontal shaft turbine, the shape of the runner is similar to the axial flow, there are fixed paddle and rotating paddle, because the flow in the flow channel basically along the axial movement of no turning, so greatly improve the water capacity and hydraulic efficiency of the unit.
1. the axial connection from the direction of inlet to outlet is simple in shape, the hydraulic loss through the flow channel is reduced, the construction is convenient, and the recovery function of draft pipe can account for more than 40% of the total water head.
2. tubular units have higher filtration capacity and specific rotation speed, so under the condition of the same head and power, the diameter of tubular units is about 10% smaller than that of rotor type.
3. the tubular turbine is suitable for the operation of the reverse pump turbine. Because there is no sharp turn in and out of the water channel, better hydraulic performance can be obtained in both pump and turbine working conditions. If applied to tidal power station, it can have six functions, such as bi-directional power generation, bi-directional pumping and bi-directional discharging, which is very suitable for comprehensive development and utilization of low-head hydraulic resources. In addition, it can be used as a reversible pump turbine in general plain drainage station, which has a wide range of applications.
4. tubular hydropower stations generally have shorter construction period, smaller investment, faster effect and less inundation migration than vertical axial hydropower stations. The station is close to towns, which is conducive to giving full play to the enthusiasm of the region to build power stations.
Product parameters:
T03-60 Tubular turbine performance data and supporting table | ||||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | Speed Way | Water Intake | |||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | Rated speed(r/min) | Vavel control | Guide vane control | Diameter (mm) | |||
Flow rate (m3/s) | The output(kw) | |||||||||
T03-60 | 9 | 2.16 | 158 | 750 | 155 | 750 | Direct connection | 800 | ||
9.5 | 2.22 | 172 | 771 | 170 | 750 | |||||
10 | 2.28 | 185 | 791 | 180 | 750 | |||||
10.5 | 2.33 | 199 | 810 | 200 | 750 | |||||
11 | 2.39 | 214 | 829 | 210 | 750 | |||||
11.5 | 2.44 | 229 | 848 | 230 | 750 | |||||
12 | 2.49 | 244 | 866 | 240 | 750 | |||||
12.5 | 2.55 | 259 | 884 | 255 | 750 | Direct connection | ||||
13 | 2.6 | 275 | 901 | 275 | 1000 | |||||
13.5 | 2.65 | 291 | 919 | 290 | 1000 | |||||
14 | 2.69 | 307 | 935 | 300 | 1000 | |||||
14.5 | 2.74 | 324 | 952 | 320 | 1000 | |||||
15 | 2.79 | 341 | 968 | 340 | 1000 | |||||
15.5 | 2.83 | 358 | 984 | 350 | 1000 | |||||
16 | 2.88 | 375 | 1000 | 375 | 1000 |
Product pictures:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1956
Total Annual:
50000000-80000000
Employee Number:
100~120
Ecer Certification:
Active Member
Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu... Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu...