China factories

China factory - Chengdu Forster Technology Co., Ltd.

Chengdu Forster Technology Co., Ltd.

  • China,Chengdu ,Sichuan
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China 50Hz/60Hz Pelton Water Wheel Generator High Pressure Long Pipe Installation
China 50Hz/60Hz Pelton Water Wheel Generator High Pressure Long Pipe Installation

  1. China 50Hz/60Hz Pelton Water Wheel Generator High Pressure Long Pipe Installation
  2. China 50Hz/60Hz Pelton Water Wheel Generator High Pressure Long Pipe Installation

50Hz/60Hz Pelton Water Wheel Generator High Pressure Long Pipe Installation

  1. MOQ: 1 Set/Sets
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 50 Set/Sets per Month
Delivery Time 180days
Packaging Details Wood box
Power 300kw-2mw
Voltage 380v/400v/3.5kv/6.3kv/10kv/20kv/35kv
Frequency 50Hz/60Hz
Generator type 3 Phase AC
Insulation class F/F
Governor High Hydraulic Microcomputer Governor
Processing method CNC machining / constant temperature annealing
Keyword pelton turbine generator
Valve Butterfly valve / gate valve
Brand Name Forster
Model Number CJA237/475-115/1 x 9
Certification CE/TUV/ISO9001
Place of Origin Sichuan, China (Mainland)

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 50 Set/Sets per Month
Delivery Time 180days Packaging Details Wood box
Power 300kw-2mw Voltage 380v/400v/3.5kv/6.3kv/10kv/20kv/35kv
Frequency 50Hz/60Hz Generator type 3 Phase AC
Insulation class F/F Governor High Hydraulic Microcomputer Governor
Processing method CNC machining / constant temperature annealing Keyword pelton turbine generator
Valve Butterfly valve / gate valve Brand Name Forster
Model Number CJA237/475-115/1 x 9 Certification CE/TUV/ISO9001
Place of Origin Sichuan, China (Mainland)
High Light pelton water wheel generatorpelton water turbine generator

High Head High Pressure Long Pipe Installation Pelton Tune Generator For Hydro Power Plant

 

Our main products included:

 

1. Kaplan turbine generators series.

 

2. Turgo turbine generators series.

 

3. Tubular turbine generators series.

 

4. Francis turbine generators series.

 

5. Pelton turbine generators series.

 

Product features:

 

According to the working principle, the turbine can be divided into two major categories: impact turbine and counter-turbine. Impact type
It is rotated by the impact of the water flow. The pressure of the water flow during the working process is constant, mainly the conversion of kinetic energy; the runner of the counter-turbine turbine is rotated by the reaction force of the water flow in the water, and the pressure energy and kinetic energy of the water flow change during the working process. But mainly the conversion of pressure energy.

 

1. suitable for high head,small flow and flow changes in large runoff hydropower station.

 

2. With the power plant investment is small,compact units structure characteristics.

 

3. Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.

 

4. Suitable for high head,small flow station in mountainous area.

 

5. A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.

 

Product parameters:
 
Pelton tubine generator unit Generator Gevernor or Regulating work Valve
Turbine
Type Water head(m) Discharge (m³/s) Output(kw) Speed (r/min) Type Capacity (kw)
CJA237/475-W-90/2x7 245 0.51 1084 750 SFW1000-8/1180 1000 BWT-10000 DN400
283 0.55 1346 SFW1250-8/1180 1250
333 0.6 1718 SFW1600-8/1430 1600
393 0.65 2152 SFW2000-8/1430 2000
449 0.69 2689 1000 SFW2500-6/1430 2500
529 0.75 3439 SFW3200-6/1730 3200
CJA237/475-W-100/2x7 452 0.7 2686 750 SFW2500-8/1730 2500 BWT-10000 CJWT- II DN400
532 0.76 3441 1000 SFW3200-6/1730 3200
614 0.81 4301 SFW4000-6/1730 4000
710 0.87 5348 SFW5000-6/1730 5000
CJA237/475-W-110/2x9 203 0.77 1352 500 SFW1250-12/1430 1250 BWT-10000 CJWT- II DN500
238 0.84 1716 600 SFW1600-10/1430 1600
277 0.9 2154 SFW2000-10/1730 2000
322 0.97 2691 SFW2500-10/1730 2500
378 1.05 3434 750 SFW3200-8/1730 3200
439 1.13 4298 SFW4000-8/1730 4000

 

Product pictures:

 

 

 

Installation picture:

 

             

 
Company Information

 

Our workshop

 

Advantages

 

Packaging & Shipping

 

FAQ

 

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

 

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

 

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

 

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

 

Q5, How many an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

 

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

 

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.   

website address: www.fstgenerator.com

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1956

  • Total Annual:

    50000000-80000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Active Member

Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu... Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu...

+ Read More

Get in touch with us

  • Reach Us
  • Chengdu Forster Technology Co., Ltd.
  • Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA
  • https://www.hydro-turbinegenerator.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement