Payment Terms | L/C, T/T |
Supply Ability | 50 Set/Sets per Month |
Delivery Time | 180days |
Packaging Details | Wood box |
Power | 300kw-2mw |
Voltage | 380v/400v/3.5kv/6.3kv/10kv/20kv/35kv |
Frequency | 50Hz/60Hz |
Generator type | 3 Phase AC |
Insulation class | F/F |
Governor | High Hydraulic Microcomputer Governor |
Processing method | CNC machining / constant temperature annealing |
Keyword | pelton turbine generator |
Valve | Butterfly valve / gate valve |
Brand Name | Forster |
Model Number | CJA237/475-115/1 x 9 |
Certification | CE/TUV/ISO9001 |
Place of Origin | Sichuan, China (Mainland) |
View Detail Information
Explore similar products
Automated Unit Small Pelton Turbine Generator ISO9001/CE/TUV Certificated
1mw Large Power Pelton Turbine Generator Used In Hydroelectric Power Plant
500 Kw Hydro Turbine Generator , Pelton Water Turbine Generator 140m Head
Automation Configuration 800kw Pelton Turbine Generator Compact Units
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 50 Set/Sets per Month |
Delivery Time | 180days | Packaging Details | Wood box |
Power | 300kw-2mw | Voltage | 380v/400v/3.5kv/6.3kv/10kv/20kv/35kv |
Frequency | 50Hz/60Hz | Generator type | 3 Phase AC |
Insulation class | F/F | Governor | High Hydraulic Microcomputer Governor |
Processing method | CNC machining / constant temperature annealing | Keyword | pelton turbine generator |
Valve | Butterfly valve / gate valve | Brand Name | Forster |
Model Number | CJA237/475-115/1 x 9 | Certification | CE/TUV/ISO9001 |
Place of Origin | Sichuan, China (Mainland) | ||
High Light | pelton wheel hydro generator ,pelton water turbine generator |
Commonly Used In High Altitude And High Water Head Mountain Areas Pelton Tune Generator For HPP
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Product features:
According to the working principle, the turbine can be divided into two major categories: impact turbine and counter-turbine. Impact type
It is rotated by the impact of the water flow. The pressure of the water flow during the working process is constant, mainly the conversion of kinetic energy; the runner of the counter-turbine turbine is rotated by the reaction force of the water flow in the water, and the pressure energy and kinetic energy of the water flow change during the working process. But mainly the conversion of pressure energy.
1. suitable for high head,small flow and flow changes in large runoff hydropower station.
2. With the power plant investment is small,compact units structure characteristics.
3. Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.
4. Suitable for high head,small flow station in mountainous area.
5. A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.
Pelton tubine generator unit | Generator | Unit output (kw) | Gevernor or Regulating work | Valve | |||||
Turbine | |||||||||
Type | Water head(m) | Discharge (m³/s) | Output(kw) | Speed (r/min) | Type | Capacity (kw) | |||
CJA237/475-115/1 x 9 | 400 | 0.54 | 1821 | 750 | SFW1600-12/1430 | 1600 | CJW-I BWT-6000 | DN400 | |
420 | 0.56 | 1973 | SFW1600-10/1430 | 1600 | |||||
440 | 0.57 | 2121 | SFW2000-10/1430 | 2000 | |||||
460 | 0.58 | 2267 | SFW2000-10/1430 | 2000 | |||||
480 | 0.59 | 2415 | SFW2000-10/1430 | 2000 | |||||
500 | 0.61 | 2564 | SFW2500-10/1430 | 2500 | |||||
CJA237/475- W-115/1 x 12.5 | 100 | 0.53 | 435 | 375 | SFW400-16/1180 | 400 | 162.9 | CJWT- I BWT-6000 | DN400 |
120 | 0.58 | 578 | SFW500-16/1180 | 500 | 185.8 | ||||
140 | 0.62 | 728 | 428.6 | SFW630-14/1430 | 630 | 209.3 | |||
160 | 0.66 | 888 | SFW800-14/1430 | 800 | 235.1 | ||||
180 | 0.7 | 1047 | SFW1000-14/1430 | 1000 | 260.2 | ||||
200 | 0.74 | 1242 | 500 | SFW1250-12/1730 | 1250 | 287.4 | |||
220 | 0.78 | 1430 | SFW1250-12/1730 | 1250 | 320.1 | ||||
240 | 0.81 | 1619 | SFW1600-12/1730 | 1600 | 345.5 | ||||
260 | 0.85 | 1828 | 600 | SFW1600-10/1730 | 1600 | 456 | |||
280 | 0.88 | 2057 | SFW2500-10/1730 | 2500 | 610 | ||||
300 | 0.91 | 2283 | SFW2500-10/1730 | 2500 | 770 | ||||
CJA237/475-W-125/1 x 9 | 310 | 0.481 | 1250 | 600 | SFW1250-10/1430 | 1250 | 1186.3 | CJWT- I BWT-6000 | DN400 |
340 | 0.504 | 1449 | SFW1250-10/1430 | 1250 | 1366.4 | ||||
370 | 0.526 | 1644 | SFW1600-10/1430 | 1600 | 1561.8 | ||||
400 | 0.547 | 1835 | SFW1600-10/1430 | 1600 | 1743.3 | ||||
430 | 0.567 | 2033 | SFW1600-10/1730 | 1600 | 1933.4 | ||||
460 | 0.586 | 2269 | 750 | SFW2000-8/1730 | 2000 | 2178.2 | |||
490 | 0.605 | 2501 | SFW2500-8/1730 | 2500 | 2401 | ||||
520 | 0.625 | 2748 | SFW2500-8/1730 | 2500 | 2638.1 | ||||
550 | 0.641 | 2981 | SFW2500-8/1730 | 2500 | 2861.8 | ||||
580 | 0.658 | 3219 | SFW3200-8/1730 | 3200 | 3090.2 | ||||
610 | 0.675 | 3413 | SFW3200-8/1730 | 3200 | 3276.2 | ||||
640 | 0.693 | 3652 | SFW3200-8/1730 | 3200 | 3505.9 | ||||
670 | 0.708 | 3918 | SFW4000-8/1730 | 4000 | 3769.1 | ||||
700 | 0.723 | 4170 | SFW4000-8/1730 | 4000 | 4017.6 |
Product pictures:
Installation picture:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, How many an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1956
Total Annual:
50000000-80000000
Employee Number:
100~120
Ecer Certification:
Active Member
Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu... Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu...
Get in touch with us
Leave a Message, we will call you back quickly!