Payment Terms | L/C, D/A, T/T, D/P, Western Union, MoneyGram |
Supply Ability | 50 Set/Sets per Month |
Delivery Time | 90days |
Packaging Details | Wooden box |
Design Head | 50m to 240m |
Design Flow | 0.134 m³/s to 0.294m³/s |
Power | 55KW to 550KW |
Connection method | Straight league |
Color | According to customer choice |
Volute Material | Carbon steel |
Runner Material | Stainless steel |
Rated speed | 750-1000 |
Brand Name | Forster |
Model Number | CJ237-W-65 |
Certification | ISO9001/CE/TUV/From-E |
Place of Origin | Sichuan, China (Mainland) |
View Detail Information
Explore similar products
380v/400v Hydroelectric Power Plant Generator , Low Flow Water Turbine
50Hz/60Hz Pelton Water Wheel Generator High Pressure Long Pipe Installation
Green Pelton Hydro Generator Used In High Altitude And High Water Head Mountain
3 Phase AC Hydroelectric Pelton Turbine Generator Compact Structure
Product Specification
Payment Terms | L/C, D/A, T/T, D/P, Western Union, MoneyGram | Supply Ability | 50 Set/Sets per Month |
Delivery Time | 90days | Packaging Details | Wooden box |
Design Head | 50m to 240m | Design Flow | 0.134 m³/s to 0.294m³/s |
Power | 55KW to 550KW | Connection method | Straight league |
Color | According to customer choice | Volute Material | Carbon steel |
Runner Material | Stainless steel | Rated speed | 750-1000 |
Brand Name | Forster | Model Number | CJ237-W-65 |
Certification | ISO9001/CE/TUV/From-E | Place of Origin | Sichuan, China (Mainland) |
High Light | 5MW pelton generator ,50m pelton generator |
Power generation using Pelton turbines, the output range can be from 50kW to 500MW, can be applied to a larger head range of 30 meters to 3000 meters, especially in the high head range other types of turbines are not applicable, and there is no need to build a dam, no need to build downstream draft pipes, The construction cost is only a fraction of other types of hydro-generator set 2 and has very little impact on the natural environment
Advantages
1. Adapt to the situation where the ratio of flow and head is relatively small.
2. The weighted average efficiency is very high, and there is a high efficiency in the entire operating range. In particular, the water bucket turbine is now advanced and can average an efficiency of more than 91% in the 30% to 110% load range.
3. Strong adaptability to changes in head
4. It is also adaptable to those with a large ratio of pipe to head.
5. Small amount of excavation.
Product Specifications
Pelton tubine generator unit | Generator | Gevernor or Regulating work | Valve | |||||
Turbine | ||||||||
Type | Water head(m) | Discharge (m³/s) | Output(kw) | Speed (r/min) | Type | Capacity (kw) | ||
CJA237/475-W-90/2x7 | 245 | 0.51 | 1084 | 750 | SFW1000-8/1180 | 1000 | BWT-10000 | DN400 |
283 | 0.55 | 1346 | SFW1250-8/1180 | 1250 | ||||
333 | 0.6 | 1718 | SFW1600-8/1430 | 1600 | ||||
393 | 0.65 | 2152 | SFW2000-8/1430 | 2000 | ||||
449 | 0.69 | 2689 | 1000 | SFW2500-6/1430 | 2500 | |||
529 | 0.75 | 3439 | SFW3200-6/1730 | 3200 | ||||
CJA237/475-W-100/2x7 | 452 | 0.7 | 2686 | 750 | SFW2500-8/1730 | 2500 | BWT-10000 CJWT- II | DN400 |
532 | 0.76 | 3441 | 1000 | SFW3200-6/1730 | 3200 | |||
614 | 0.81 | 4301 | SFW4000-6/1730 | 4000 | ||||
710 | 0.87 | 5348 | SFW5000-6/1730 | 5000 | ||||
CJA237/475-W-110/2x9 | 203 | 0.77 | 1352 | 500 | SFW1250-12/1430 | 1250 | BWT-10000 CJWT- II | DN500 |
238 | 0.84 | 1716 | 600 | SFW1600-10/1430 | 1600 | |||
277 | 0.9 | 2154 | SFW2000-10/1730 | 2000 | ||||
322 | 0.97 | 2691 | SFW2500-10/1730 | 2500 | ||||
378 | 1.05 | 3434 | 750 | SFW3200-8/1730 | 3200 | |||
439 | 1.13 | 4298 | SFW4000-8/1730 | 4000 | ||||
CJA237/475-W- 110/2x11 | 155 | 1.01 | 1359 | 428.6 | SFW1250-14/1730 | 1250 | BWT-10000 CJWT- II | DN600 |
181 | 1.09 | 1719 | 500 | SFW1600-12/2150 | 1600 | |||
210 | 1.17 | 2144 | SFW2000-12/2150 | 2000 | ||||
244 | 1.26 | 2691 | 600 | SFW2500-10/2150 | 2500 | |||
288 | 1.37 | 3450 | SFW3200-10/1730 | 3200 | ||||
300 | 1.4 | 3535 | SFW3200-10/1730 | 3200 | ||||
320 | 1.45 | 3926 | SFW4000-10/2150 | 4000 | ||||
340 | 1.49 | 4317 | SFW4000-8/2150 | 4000 | ||||
360 | 1.54 | 4702 | 750 | SFW4000-8/2150 | 4000 | |||
380 | 1.58 | 5082 | SFW5000-8/2150 | 5000 | ||||
400 | 1.62 | 5469 | SFW5000-8/2150 | 5000 | ||||
CJA237/475- W-125/2x9 | 378 | 1.05 | 3434 | 600 | SFW3200-10/1730 SFW4000-10/1730 | 3200 | BWT-10000 CJWT- II | DN500 |
443 | 1.14 | 4307 | 4000 | |||||
CJA237/475- W-125/2x11 | 334 | 1.48 | 4309 | 600 | SFW4000-10/2150 SFW5000-10/2150 | 4000 | BWT-10000 CJWT- II | DN500 |
384 | 1.59 | 5312 | 5000 | |||||
CJA237/475-W-125/2x12.5 | 153 | 1.29 | 1718 | 428.6 | SFW1600-14/1730 | 1600 | BWT-10000 CJWT- II | DN800 |
177 | 1.39 | 2147 | SFW2000-14/1730 | 2000 | ||||
206 | 1.5 | 2680 | SFW2500-14/2150 | 2500 | ||||
242 | 1.62 | 3432 | 500 | SFW3200-12/2150 | 3200 | |||
282 | 1.75 | 4293 | SFW4000-12/2150 | 4000 | ||||
324 | 1.88 | 5317 | 600 | SFW5000-12/2150 | 5000 | |||
CJA237/475- W-140/2x12.5 | 281 | 1.75 | 4294 | 500 | SFW4000-12/2150 | 4000 | WT-10000 CJWT- II | DN800 |
324 | 1.88 | 5316 | SFW5000-12/2600 | 5000 | ||||
378 | 2.03 | 6700 | 600 | SFW6300-10/2600 | 6300 |
Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Europe, Asia, South America, North America, etc., and as partners, we are qualified as long-term suppliers in many regions.
The capacity of hydro turbines is up to 5KW-300MW for a unit. The main hydro turbines are Turgo turbine ,pelton turbines, francis turbines, kaplan turbines ,bulb tubular turbines and other typesFAQ
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4, Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, How many an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6, How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7, Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1956
Total Annual:
50000000-80000000
Employee Number:
100~120
Ecer Certification:
Active Member
Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu... Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu...
Get in touch with us
Leave a Message, we will call you back quickly!