Payment Terms | L/C, T/T |
Supply Ability | 20 sets per month |
Delivery Time | 30days after deposit received |
Packaging Details | Nude packing for main body, plastic package for main parts |
Product name | Hydraulic Jack In Piling Machine |
Efficiency | 98% |
Suitable pile | Concrete precast pile,sheet pile,steel tube,H-pile |
New piling machine | Adopt hydraulic to jacking in pile to avoid the noise and pollution |
Suitable pile size | Max 350mm for round, 350m for squre |
Piling Speed(m/min) | 6.3 |
Brand Name | T-WORKS |
Model Number | ZYC100B-B1 |
Certification | ISO9001/SGS / GOST/CE |
Place of Origin | Hunan, China |
View Detail Information
Explore similar products
Mini Hydraulic Pile Driving Machine , Pile Foundation Equipment OEM Service
No Noise Hydraulic Piling Rig Machine Energy Saving ISO9001 Certification
Rotary Hydraulic Pile Driving Machine / Sheet Pile Driving Machine
Custom Hydraulic Pile Driving Machine , Precast Concrete Pile Driving
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 20 sets per month |
Delivery Time | 30days after deposit received | Packaging Details | Nude packing for main body, plastic package for main parts |
Product name | Hydraulic Jack In Piling Machine | Efficiency | 98% |
Suitable pile | Concrete precast pile,sheet pile,steel tube,H-pile | New piling machine | Adopt hydraulic to jacking in pile to avoid the noise and pollution |
Suitable pile size | Max 350mm for round, 350m for squre | Piling Speed(m/min) | 6.3 |
Brand Name | T-WORKS | Model Number | ZYC100B-B1 |
Certification | ISO9001/SGS / GOST/CE | Place of Origin | Hunan, China |
High Light | pile foundation equipment , mini pile driving equipment |
T-WORKS Mini Hydraulic Pile Driving Machine For Precast Pile
1. Description:
Hydraulic Static Pile Drivers are featured with no noise, no vibration, no pollution and no rubbish left in construction site.It can work with H-piles, precast concrete and steel piles with different shapes,like round,square and tapered shape. There are series models range from 60T to 1200T
It is adopted the hydraulic system design of large power and high flow,the precast pile entirely depends on the hydraulic static pressure so that the pile can be pressed into the ground steadily and quietly.
The pressing-pile speed amounting to 300-800 meters within 8hours, which its quite more efficient than other conventional pile drivers.
This unique construction method with non-pollution has gradually taken place of the pile hammer.
2. Applications:
3. Specifications:
Paramete / Type/Model | ZYC100 | |
Rated piling pressure(KN) | 1000 | |
Piling speed(m/min) | Fast | 6.3 |
Low | 3.0 | |
Piling Stroke(m) | 1.6 | |
Pace(m) | Longitudinal | 1.5 |
Horizontal | 0.4 | |
Angle range(°) | 15 | |
Rise stroke (m) | 1.45 | |
Max square pile(mm) | max | □350 |
Max cirle pile(mm) | max | Φ350 |
Side piling space(mm) | 400 | |
Cirle piling space(mm) | 800 | |
Lifting weight(t) | 5 | |
Lifting pile's lengh(m) | 9 | |
Power(KW) | Piling | 37 |
Lifting | 11 | |
Main dimension(m) | Lenth of work | 6.7 |
Width of work | 4.2 | |
Transprorting height | 2.7 | |
Total weight(T)≥ | 100 |
4. Feature Advantage:
1). Civilized construction; Clean; No noise; No vibrations; No construction wastes.
2). Reliable Construction Quality; Piling process is similar to static load testing, where pile bearing force can be displayed. 100% pile success rate is guaranteed.
3). Fast piling and High efficiency; One Hydraulic Static Pile Driver (shortened as HSPD )can drive piles in total of 600~800m per 8 hours, much faster than other modes. Especially suitable for large-scale or time-constraint projects.
4). Walking and steering freely. Easy to align piles.
5). Compact conformation. Easy to disassemble & assemble.
5. After sale service and quality gurantee
1) To train operating,maintenance and construction people for our customers.
2) Always be ready to answer technical questions concerned from our customers.
3) Be responsible for the quality of our products and provide technical service of installing,making ajustment,testing and maintenance on the site in time.
4) To dispatch technicans to the worksite at short notice to solve problems or fix breakdowns.
5) Keep a record of our customers and be informed of the working performance of our products,feedback and suggestions of our customers so as to make a good cooperation with customers.
6) We guarantee to keep our Main Machine in good repair for 1 year after sale and 6 months for accessories. In the guarantee time, any quality problem caused by manufacturing after confirmation of us shall be repaired for free; Exceed the guarantee time, we can also supply repair services to our products charged for repair cost only.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2005
Total Annual:
20000000-30000000
Employee Number:
270~300
Ecer Certification:
Active Member
Changsha Tianwei Engineering Machinery Manufacturing Co.,Ltd is a modern joint -stock private enterprise found in 2005, it is specialized in R & D and manufacturing series of Hydraulic Static Pile Driver and other piling machinery such as bored pile drilling rig, hydrau... Changsha Tianwei Engineering Machinery Manufacturing Co.,Ltd is a modern joint -stock private enterprise found in 2005, it is specialized in R & D and manufacturing series of Hydraulic Static Pile Driver and other piling machinery such as bored pile drilling rig, hydrau...
Get in touch with us
Leave a Message, we will call you back quickly!