China 1450kw Francis Turbine Generator For Hydro Power 70m Station Water Head
China 1450kw Francis Turbine Generator For Hydro Power 70m Station Water Head

  1. China 1450kw Francis Turbine Generator For Hydro Power 70m Station Water Head
  2. China 1450kw Francis Turbine Generator For Hydro Power 70m Station Water Head
  3. China 1450kw Francis Turbine Generator For Hydro Power 70m Station Water Head

1450kw Francis Turbine Generator For Hydro Power 70m Station Water Head

  1. MOQ: 1
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 1 set 4-5 month
Delivery Time 150 work days
Packaging Details plywood
water head 70 m
water flow 2.64 m³/s
Runner Material stainless steel
efficiency 92.6 %
capacity 1450 kw
frequency 50HZ/60Hz
Power factor 0.80
Rated efficiency 92.6 %
Brand Name Wawushan
Model Number HLA-069
Certification ISO9000
Place of Origin Sichuan

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 1 set 4-5 month
Delivery Time 150 work days Packaging Details plywood
water head 70 m water flow 2.64 m³/s
Runner Material stainless steel efficiency 92.6 %
capacity 1450 kw frequency 50HZ/60Hz
Power factor 0.80 Rated efficiency 92.6 %
Brand Name Wawushan Model Number HLA-069
Certification ISO9000 Place of Origin Sichuan
High Light 1450kw Francis Turbine GeneratorFrancis Turbine Generator 70m Head70m Head turbine kaplan francis pelton

1450kw Francis Turbina Generator For Hydro Power Station Water Head 70m

 

rief introduction of turbine structure and main component

1.Water inlet part

Water inlet part consists of valve. The valve is used to close the unit in static water when need stop, it is also used to close the unit and cut the water flow in dynamic water when the unit is in emergency and turbine distributor break down.

2.Spiral case

Spiral case is welding part, equipped with fixed guide vane in it. Spiral case shall make the water become number of swirl of water flow and guide water to flow regularly into guide vane apparatus and runner along circumference. It is equipped with an air relieve valve on the top of spiral case to exhaust air when filling water initially.

3.Turbine distributor

It consists of guide vane, guide vane lever, shaft sleeve, front cover, back cover, etc. It can form or change number of swirls of water flow to adjust turbine discharge according to variation of load. It is also used to normal and emergency shut down. The guide vane shaft sleeve has O ring for sealing. The control ring is welded by steel plate as a whole. Circular guiding rail and wiring plate with lubricating performance are located on the bottom surface of the control ring. The control ring has enough strength and rigidity, won’t occur excessive bending due to unbalance stress of servomotor. Counterweight is located on counterweight support. In case the servomotor is in fault, counterweight will close the guide vane by action of gravity.

4.Runner

Runner is the heart of turbine to change the water energy to mechanical energy. It is casted and welded as a whole, crown, band and blade is made of stainless steel ZG06Cr13Ni4Mo which has perfect performance of anti-cavitation, anti- corrosion and weldable. The runner is subject to static balance testing after machining. Holes on runner crown can reduce the pressure applied on runner by the water.

5.Draft tube assembly

Draft tube assembly consists of draft tube elbow and draft tube cone, guide the water flow into lower stream, make use of the potential energy of water flow at suction height, recycle major kinetic energy of the flow at runner outlet by its diffusion. All connecting flange shall be sealed, immersed depth of draft tube shall not be less than 30cm to prevent air into draft tube.

6.Pressure gauge and vacuum gauge

Pressure gauge is located on spiral case for observing the pressure in spiral case.

Vacuum gauge is located on draft tube elbow for observing the degree of vacuum. Valves shall be equipped on pressure gauge and vacuum gauge piping for close and open the piping.

 

Place of Origin: Sichuan, China
Brand Name: Customized
Warranty: 1 year
Application: Hydropower Plant
Certificate: ISO9001
Lifetime 35 years


 

 

 

 

 

 

 

 

 

 

 

 

 


 


 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2003

  • Total Annual:

    800-1000

  • Employee Number:

    70~110

  • Ecer Certification:

    Verified Supplier

  Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe...   Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe...

+ Read More

Get in touch with us

  • Reach Us
  • Hongya Power Generating Equipment To Utilities Limited
  • Anxi village, Yuping town,Hongya county, China
  • https://www.hydraulic-turbine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement