China factories

China factory - Hongya Power Generating Equipment To Utilities Limited

Hongya Power Generating Equipment To Utilities Limited

  • China
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator
China 0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator

  1. China 0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator
  2. China 0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator

0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator

  1. MOQ: 1
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 1+unit+4 months
Delivery Time 120 wordking days
Packaging Details plywood
runner material stainless steel
diameter 0.8 m
machine type Kaplan
blade No 18 PCS
weight 400 kg
brand Wawushan
Brand Name Wawushan
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 1+unit+4 months
Delivery Time 120 wordking days Packaging Details plywood
runner material stainless steel diameter 0.8 m
machine type Kaplan blade No 18 PCS
weight 400 kg brand Wawushan
Brand Name Wawushan Place of Origin China
High Light 0.8m Water Turbine PartsWater Turbine Parts Turgo Wheel0.8m turgo water wheel

Stainless Steel Water Turbine Parts Turgo Wheel For Generator

 

The Turgo wheel is basically an improved version of the Pelton.The maximum efficiency of animpulse wheel is achieved when the velocity of the runners at the centerline of the nozzle is half the velocity of the incoming water. To achieve the highest velocities the ratio of the diameter of the wheel and thediameter to the center of the nozzle should be as small as possible..The wheel has a minimum ratio of 9:1, the Turgo has a minimum ratio of 4:1. The Turgo is half the size of the Pelton and operates at twice thespeed. This makes the unit cheaper and reduces the amount of gearingnecessary. The Turgo has an efficiency of over 80% and runs on head of 40 feet or more.

 

specification

 

runner material stainless steel
runner type Kaplan
diameter 0.8 m
capacity 200kw
blade No 18PCS
weight 400KG
 

The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2003

  • Total Annual:

    800-1000

  • Employee Number:

    70~110

  • Ecer Certification:

    Verified Supplier

  Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe...   Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe...

+ Read More

Get in touch with us

  • Reach Us
  • Hongya Power Generating Equipment To Utilities Limited
  • Anxi village, Yuping town,Hongya county, China
  • https://www.hydraulic-turbine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement