Payment Terms | L/C, T/T |
Supply Ability | 3000t/Month |
Delivery Time | 7-30 days |
Packaging Details | standard export packing or customers' request. |
Standard | DIN,ASTM,AISI,GB,JIS |
Surface treatment | Black / Milling / Machined |
Hardness | HRC28-34 |
Test | SGS / Ut 100% / Element Testing |
Technology | Forged or Hot Rolled |
sharp | round plate flat |
thickness | 8-700mm |
width | 155-2400mm |
Length | 6000-10000mm |
dia | 10-300mm |
HS CODE | 722540 & 722830 |
Sample | Free sample |
Brand Name | CF STEEL |
Model Number | P20 1.2311 1.2312 1.2738 P20+Ni PDS-3 |
Certification | ISO/Mill Certificate |
Place of Origin | China |
View Detail Information
Explore similar products
210HB Hardness Plastic Mold Steel / Alloy Steel Round Bar 1.2083 / 420 / 4Cr13 /
Prehardened Special Alloy Steel Plate 718 / P20 + Ni / 1.2738 / 3Cr2NiMnMo
S136 Standard Corrosion - Resistant Plastic Mold Steel / Round Metal Bar
/ P21 / B40 Plastic Mold Steel Plate Pre - Hardened HRC37-43 ISO SGS
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 3000t/Month |
Delivery Time | 7-30 days | Packaging Details | standard export packing or customers' request. |
Standard | DIN,ASTM,AISI,GB,JIS | Surface treatment | Black / Milling / Machined |
Hardness | HRC28-34 | Test | SGS / Ut 100% / Element Testing |
Technology | Forged or Hot Rolled | sharp | round plate flat |
thickness | 8-700mm | width | 155-2400mm |
Length | 6000-10000mm | dia | 10-300mm |
HS CODE | 722540 & 722830 | Sample | Free sample |
Brand Name | CF STEEL | Model Number | P20 1.2311 1.2312 1.2738 P20+Ni PDS-3 |
Certification | ISO/Mill Certificate | Place of Origin | China |
High Light | mould steel material ,p20 mold steel |
Chinese | American | German | Japanese | Swedish |
GB | AISI | DIN | JIS | ASSAB |
3Cr2Mo | P20 | 1.2311 | PDS-3 | 618 |
Chemical Composition (%)
1.2311 | C% | Si% | Mn% | Cr% | Mo% | S% | P% |
0.35-0.45 | 0.20-0.40 | 1.30-1.60 | 1.80-2.10 | 0.15-0.25 | ≤0.030 | ≤0.030 |
Available Size (mm)
Shape | Thickness/ Diameter | Width | Length |
Plate | 8-460 | 1600-2200 | 4000-10000 |
Round | 12-120 | / | 4000-6000 |
Block | 250-800 | 800-1600 | 2000-6000 |
Heat Treatment
Annealing | 710-730ºC | |||
Hardness after annealing | Max 230HB | |||
Stress relieving | Approx 650ºC | |||
Hot forming | 850-1050ºC | |||
Hardening | 870-890ºC | |||
Quenching media | Oil,salt bath,vacuum | |||
Hardness after quenching | 50-54HRC | |||
Hardness after tempering | 100ºC | 200ºC | 300ºC | 400ºC |
54HRC | 54HRC | 53HRC | 50HRC |
Characteristics
1, Good hardenability;
2, Good integral machanical performance under high temperature;
3, Good heat-resistance and fatigue-resistance;
4, Good performance against liquid metal erosion;
5, High putity and homogeneous structure of China's biggest ESR production base for its strict requirement in the whole process of exploitation, smelting, vacuum degassing, ESR, forging, annealing, inspection.
Delivery Details
1) For abundant stock, 7-15 days.
2) For customized products, 15-30 days.
Pre-hardened Mould Steel / Black Surface Alloy Plastic Die Steel P20/ 1.2311/ 3Cr2Mo
About GUANGZHOU CHANGFENG STEEL CO.,LTD
Q: Are you a manufacturer or merely a trader?
A: We are group of companies and owned manufacturer bases and trading company. We specialized in plastic mould steel,hot work mould steel,cold work mould steel,alloy steel for mechanical,high speed steel, etc. All material are with high quality and competitive price.
Q: How do you guarantee the quality of your product?
A: Firstly, we can provide the certificates from the third party, such as SGS, CE,ISO if you need. Secondly, we have a complete set of inspection system and every process is checked by QC. Quality is the lifeline of enterprise survival.
Q: Delivery time?
A: We have ready stock for most of material grades in our warehouse. If the material don't have stock, the delivery lead time is about 30-50days (depend on the quantity)after receiving your prepayment or firm order.
Q: What is the payment term?
A: T/T or L/C or Trade Assurance.
Q: Can we visit your company and factory?
A: Yes, warmly welcome! We can book the hotel for you before you come to China and arrange our driver to our airport to pick you up when you come.
Why Choose Us
1. Competitive price and quality from our own factory;
2. Approved by ISO9001, CE, SGS every year;
3. Best service with 24 hours reply;
4. Flexible payment with T/T,L/C , Trade Assurance;
5. Smooth production ability(1000tons/month);
6. Quick delivery and standard exporting package;
7. OEM/ODM.
Company Details
Business Type:
Distributor/Wholesaler,Exporter,Trading Company
Year Established:
2012
Total Annual:
5000000-10000000
Employee Number:
100~120
Ecer Certification:
Active Member
Guangzhou ChangFeng Steel Co., Ltd. is a professional special steel company, which specialized in exporting mould steel products based in China.With twenty years experience in special steel industry, our main products are Plastic Mould Steel, Hot Work Mould Steel, Cold Work Mould Steel, Alloy Struct... Guangzhou ChangFeng Steel Co., Ltd. is a professional special steel company, which specialized in exporting mould steel products based in China.With twenty years experience in special steel industry, our main products are Plastic Mould Steel, Hot Work Mould Steel, Cold Work Mould Steel, Alloy Struct...
Get in touch with us
Leave a Message, we will call you back quickly!