Payment Terms | L/C, D/A, D/P, D/P, T/T, Western Union, MoneyGram |
Delivery Time | 90 days |
Packaging Details | standard export packing |
Name: | Zinc Smoke Collection And Treatment System |
Certificates:: | ISO CE SGS WSF CQC |
Place Of Origin:: | Jiangsu, China (Mainland) |
Brand Name:: | XLY |
Feature:: | Reasonable Structure |
After-sales Service Provided:: | Engineers Available To Service Machinery Overseas |
Brand Name | xly |
Certification | ce |
Place of Origin | Jiangsu, China (Mainland) |
View Detail Information
Explore similar products
Dust Removal Equipment Zinc Smoke Collection And Treatment System Durable
Durable Zinc Smoke Collection And Treatment System Environment Friendly.
Hot Dip Galvanizing Line Zinc Smoke Collection And Treatment System.
High Precision Zinc Smoke Collection System With Reasonable Structure
Product Specification
Payment Terms | L/C, D/A, D/P, D/P, T/T, Western Union, MoneyGram | Delivery Time | 90 days |
Packaging Details | standard export packing | Name: | Zinc Smoke Collection And Treatment System |
Certificates:: | ISO CE SGS WSF CQC | Place Of Origin:: | Jiangsu, China (Mainland) |
Brand Name:: | XLY | Feature:: | Reasonable Structure |
After-sales Service Provided:: | Engineers Available To Service Machinery Overseas | Brand Name | xly |
Certification | ce | Place of Origin | Jiangsu, China (Mainland) |
High Light | fume extraction system ,smoke collector |
Zinc Smoke Collection And Treatment System xly type high precision zinc smoke collection system
Packaging Details
Packing in box or bags, then in pallet.
Delivery Time
Within 90 days
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 25-40 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=3000USD, 100% in advance. Payment>=3000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
Specifications
1, factory directly
2, better after-sale services
3, ISO,CE
4, on-time delivery
Steel plates are used on both sides of the zinc pot, the suction duct is left to absorb the air draft, centralized recycling process, the zinc pot width is larger than 1.8 m, which should not be used in this way. (applicable to hanging plating)
we are a powerful supplier who have joined the Trade Assurance to protect your payment to make sure that we deliver on time and manufacture quanlity products as required.
We will offer basic layout and electrical system diagram of production line within 30 days after signing the contact.
We will supply all information when delivery ,including line electrical drawing,original manual of equipment and instrument table,equipment conformity certificates,list of spare parts,equipement maintanance procedures,drawing and suppliers of quick-wear pats.
We will send engineer and high level technician when installing the production line.
We will test the whole line for one month and train the operater.
We will send engineers to service machinery overseas if necessary.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Jiangsu XinLingYu Intelligent Technology Co., Ltd. is a professional company which is engaged in intelligent hot dip galvanizing technology research and output of services. We provide consultings including project research, planning, energy saving evaluation, EIA; provide technical services includin... Jiangsu XinLingYu Intelligent Technology Co., Ltd. is a professional company which is engaged in intelligent hot dip galvanizing technology research and output of services. We provide consultings including project research, planning, energy saving evaluation, EIA; provide technical services includin...
Get in touch with us
Leave a Message, we will call you back quickly!