Payment Terms | L/C, T/T, Western Union |
Supply Ability | 1-1000 set |
Delivery Time | 20 work days |
Packaging Details | nude packing/wooden packing |
Product name | Coal/biomass hot boiler |
Fuel | Coal-fired |
Output | Hot Water |
Pressure | Low Pressure |
Usage | Industrial |
Structure | Water Tube |
Warranty | 1 Year |
Material | Stainless-steel duplex |
Color | Customer's Requirement |
Application | school,Greenhouse/poultry farm,hot water supply,hospital,hotel |
Class | A |
Weight | upon requirement |
After-sales service provided | Engineers available to service machinery overseas |
Brand Name | YONGXING |
Model Number | HOT WATER BOILER |
Certification | ISO,ASME,ISO9001,CE |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Automatic Operation and High Efficiency industrial hot water boiler for
Economical Coal Fired Hot Water Boiler System and Mature Solution Coal Boiler
Biomass Hot Water Boiler Fast Heating And Low Fuel Consumption
Industrial Mill Coal Fired Hot Water Boiler / Fire Tube Hot Water Boiler System
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 1-1000 set |
Delivery Time | 20 work days | Packaging Details | nude packing/wooden packing |
Product name | Coal/biomass hot boiler | Fuel | Coal-fired |
Output | Hot Water | Pressure | Low Pressure |
Usage | Industrial | Structure | Water Tube |
Warranty | 1 Year | Material | Stainless-steel duplex |
Color | Customer's Requirement | Application | school,Greenhouse/poultry farm,hot water supply,hospital,hotel |
Class | A | Weight | upon requirement |
After-sales service provided | Engineers available to service machinery overseas | Brand Name | YONGXING |
Model Number | HOT WATER BOILER | Certification | ISO,ASME,ISO9001,CE |
Place of Origin | CHINA | ||
High Light | coal hot water boiler ,coal fired hot water furnace |
Coal/Biomas Fired Hot Water Boiler For Hospital School Heating 0.7/1.4/2.1/2.8/4.2 MW
The coal/biomass hot water boiler is composed of a furnace shell, a furnace, a flue, and a water interlayer. The fire tube hot water boiler assembly layout is as follows: the furnace is located at the lower part of the furnace shell; the lower end of the flue is connected to the upper end of the furnace; the water interlayer is located inside the furnace shell and between the furnace shell and the furnace and the fire tunnel. In addition, a water outlet and a water return are respectively arranged at the upper end and the lower end of the furnace shell, and a furnace mouth is installed beside the furnace shell in the middle of the furnace, and a smoke exhaust port is arranged at the top of the furnace shell. The flue consists of multiple and vertical spaces. The inner side of the water interlayer is coated with a layer of enamel.
Features
1.Horizontal coal/biomass hot boiler adopts three-return water-fire tube structure with longitudinal arrangement of single-drum tube. The industrial hot water boiler has high thermal efficiency and can effectively reduce the running cost.
2.The water-cooled wall tube is densely packed on both sides of the furnace. The design structure is reasonable and compact, with large heating area and long flow of flue gas. Good thermal effect and low exhaust gas temperature.
3.The horizontal coal/biomass hot boiler adopts special design, which can not only effectively prevent the bottom of the shell from being irradiated by the high temperature of the furnace, but also reduce the temperature of the smoke at the inlet of the tube sheet.
4.In the high efficiency hot water boiler, there is no dead water area at the bottom of the drum. This structure can prevent the fouling of the tube sheet due to excessive cooling. In addition, the flue gas that is burned is discharged from the smoke chamber, which can reduce the emission of pollutants.
5. Horizontal wall pipes are installed on the left and right sides of the horizontal coal fired hot water boiler, and a wing-shaped flue is formed. A threaded tobacco pipe is arranged in the drum. The use of movable grate can effectively reduce the loss of coal.
6. The horizontal coal fired hot water boiler is equipped with a large enough inspection hole at the upper part. The personnel can enter the inside of the furnace body from the inspection hole, which is very convenient for the operator to carry out quality inspection and maintenance work.
7. The coal/biomass hot boiler body is compactly arranged, with small floor space and convenient transportation. The quick assembly mode is adopted, the installation period is short, the installation cost is low, and the user inputs less capital.
8. The hot water boiler furnace are widely used in factories, hotels, hospitals, office buildings, schools, bathing centers, and other places to meet the needs of bathing, domestic water and heating.
Technical data sheet of high efficiency hot water boiler
Model | Rated Power(MW) | Heating Area(m2) | Supply/Bac Water Temperature℃ | Efficiency | Pressure | Weight Kg | Consumption kg/h | Size(m) |
CDZH0.7-90/70-AII | 0.7 | 6000 | 95/70 | 82 % | 0 Mpa | 9500 | 154 | 2.6×1.7×2.45 |
CDZH1.4-90/70-AII | 1.4 | 12000 | 11200 | 308 | 3.4×2.2×2.6 | |||
CDZH2.1-90/70-AII | 1.4 | 18000 | 15500 | 463 | 3.6×2.4×2.9 | |||
CDZH2.8-90/70-AII | 1.8 | 24000 | 16500 | 617 | 4.3×2.5×3.1 | |||
CDZL0.7-90/70-AII | 2.1 | 6000 | 12500 | 154 | 4.0×1.7×2.6 | |||
CDZL1.4-90/70-AII | 1.4 | 12000 | 17800 | 308 | 5.0×2.2×2.8 | |||
CDZL2.8-90/70-AII | 2.8 | 24000 | 27800 | 617 | 6.0×2.5×3.4 | |||
CDZL4.2-90/70-AII | 4.2 | 36000 | 32000 | 926 | 7.2×2.6×3.8 |
Auxiliary list sheet
Auxiliary components | |
Auxiliary System | Parts details |
Water supply system | soft water, demineralized water system, deaerator, feed water pump, water tank, ammonia adding device, dosing device |
Steam (hot water) system | Steam separator (water) cylinder, desuperheater |
Fuel supply system | Coal machine, belt coal conveyor, crusher, vibrating screen electronic belt scale, electromagnetic iron remover, double pear type unloader, pre-furnace coal feeder, etc |
Smoke system | Blower, induced draft fan, chimney, etc. Sewage (steam) system, row, row, sampler, silencer |
Electronic control system | General control, PLC control, DCS control |
Other equipment in the boiler room | Heat exchange station, circulation pump, decontamination unit, etc. |
Flue gas purification system | Dust collector, desulfurization device, denitration device, etc. |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Trading Company,Seller
Year Established:
2000
Total Annual:
100-500
Employee Number:
500~1000
Ecer Certification:
Active Member
Yongxing Boiler Group Co., Ltd. is a group company specializing in research, development, manufacturing, sales and installation services for various boilers and various thermal energy machinery and equipment. Yongxing Boiler occupies an area of 60,000m2, with fixed assets of 15 mil... Yongxing Boiler Group Co., Ltd. is a group company specializing in research, development, manufacturing, sales and installation services for various boilers and various thermal energy machinery and equipment. Yongxing Boiler occupies an area of 60,000m2, with fixed assets of 15 mil...
Get in touch with us
Leave a Message, we will call you back quickly!