Payment Terms | L/C, T/T, Western Union |
Supply Ability | 500Kpcs/month |
Delivery Time | 15 days |
Packaging Details | Export standard packing |
Material | ductile iron 450-10 |
Quality Control | ISO9001, TS16949 |
Inspection | IQC, IPQC,FQC,QA |
Mould | Depend on customer's require to make the mould. |
Brand Name | HUAYANG |
Model Number | CUSTOMIZE |
Place of Origin | DONGGUAN CHINA |
View Detail Information
Explore similar products
3 ply Nonwoven Blue white Medical Surgical Face Mask For Bacteria prevention
Valve 450-10 Precision Metal Casting Ductile Iron Casting Heat Treatment Metal
Heat Treatment Aluminum Pipe Connectors Iron 450-10 Ductile Iron Casting
03 Joint Iron 450-10 Precision Metal Casting Heat Treatment Metal Casting Parts
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 500Kpcs/month |
Delivery Time | 15 days | Packaging Details | Export standard packing |
Material | ductile iron 450-10 | Quality Control | ISO9001, TS16949 |
Inspection | IQC, IPQC,FQC,QA | Mould | Depend on customer's require to make the mould. |
Brand Name | HUAYANG | Model Number | CUSTOMIZE |
Place of Origin | DONGGUAN CHINA | ||
High Light | metal casting parts ,cast iron components |
clamp and plug part
Quenching heat treatment clamp and plug ductile iron casting iron 450-10
Description
The procedure of this part is wax mould, shell mold, pouring, after treatment and packaging, whose lead time will be 20-25 working days after PO received.
Item | Description |
Product Name | clamp and plug part |
Working Process | Tooling make, wax mould, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging |
Material | ductile iron 450-10 |
Surface Treatment | According to the requirement of customer |
Application(Products cope) | machine, clamp other parts and plug in the machine |
Quality Control | ISO9001, TS16949 |
Thickness | Only to raw casting, more than 4mm |
File Format | Solidworks,Pro/Engineer,Auto CAD,PDF,JPG |
Service | 24-hour reply to customer's enquiry |
Inspection | IQC, IPQC,FQC,QA |
Mould | Depend on customer's require to make the mould. |
Sample confirmation | Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied. |
Packing | Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements |
Payment & Shipping Terms:
Minimum Order Quantity: | 999 |
Price: | Quoted per see the drawing or sample |
Delivery Time: | 20-25 working days after received PO |
Payment Terms: | T/T, L/C |
Supply Ability: | 10,000pcs per month |
FAQ:
Q: What is the payment?
We prefer T/T, and also L/C if you want, the way of payment we can discuss.
Q: What is the lead time?
1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.
2. If do the mass production, the lead time will be with 20 working days after receiving the PO.
GOOD SERVICE:
We will respond to you within 24 hours. We can manufacture nonstandard parts according to your drawings. And we offer best after sale service.
LOWER PRICE:
The price of our products is reasonable and competitive, and we can discuss if you want.
Why should you choose us?
1. We can do the part according to your drawing.
2. Rich experience and good technology support ( with senior and professional engineers with more than 7 years experience).
3. 100% inspection before delivery.
4. Competitive price with high quality.
5. Convenient transportation ( port: Ningbo, Shanghai)
6. Better operators in the office doing the export, who have done export business for more than 10 years, have good relationship with custom and shipping companies.
Strict inspection we do during operation
1. We have specialized QC testers to check the products quality according to different customers.
2. We have IQC to check the dimensions and surface of the incoming material.
3. We have PQC to inspect full-course during the processing
4. We have FQC to inspect all the plating products from outsides and make the 100% inspection before the shipments
5. We are willing to provide with sample for quality and function testing. We are a certified firm with TS16949. Our products are excellent in quality and reasonable in price.
How to test the part?
1. When we do the wax mould, we will choose 5-10 parts to test the wax shrinkage, and also test the life of toolings.
2. Before pouring, we will test the material and do the material report.
3. After Pouring, we will choose 10-20 parts per furnace to do the measurement.
4. When doing the after treatment, we will measure some of the parts per day.
5. After after-treatment, we will use testing toolings to test every parts.
6. Before shippment, we will test 5 parts or the quantity customer want to do the report, and will send the material report and meausrement report together with productions to customer.
Products Images:
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2014
Total Annual:
5 million-7 million
Employee Number:
200~250
Ecer Certification:
Active Member
Dongguan YIHUI Hardwares Machine Accessaries Co., Ltd is located in Shijie Town, Dongguan City, a famous manufacturing city in China. There are more than 10,000 square meters of independent factory buildings with more than 250 employees. There are two companies under the company, which do preci... Dongguan YIHUI Hardwares Machine Accessaries Co., Ltd is located in Shijie Town, Dongguan City, a famous manufacturing city in China. There are more than 10,000 square meters of independent factory buildings with more than 250 employees. There are two companies under the company, which do preci...
Get in touch with us
Leave a Message, we will call you back quickly!