China factories

China factory - Shenzhen JiDing Technology Co., Ltd

Shenzhen JiDing Technology Co., Ltd

  • China,Shenzhen ,Guangdong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China S136 Steel Hardness 1.2324 HASCO Auto Parts Mould Polish Finishing
China S136 Steel Hardness 1.2324 HASCO Auto Parts Mould Polish Finishing

  1. China S136 Steel Hardness 1.2324 HASCO Auto Parts Mould Polish Finishing
  2. China S136 Steel Hardness 1.2324 HASCO Auto Parts Mould Polish Finishing

S136 Steel Hardness 1.2324 HASCO Auto Parts Mould Polish Finishing

  1. MOQ: 1 set
  2. Price: Negotiate
  3. Get Latest Price
Payment Terms T/T, L/C, D/A, D/P
Supply Ability 30 sets Per Month
Delivery Time 30 Working Days 1 T1
Packaging Details Mold : packed by wood carton
Mould Material S136 1.2324
Cavity 1*1
Shaping Mode Plastic Injection Mould
Surface Finishing Polish
Size Customized Size
Standard HASCO
Brand Name OEM
Model Number Cusomized
Certification ISO 9001 : 2015 , CE
Place of Origin Shenzhen , China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, L/C, D/A, D/P Supply Ability 30 sets Per Month
Delivery Time 30 Working Days 1 T1 Packaging Details Mold : packed by wood carton
Mould Material S136 1.2324 Cavity 1*1
Shaping Mode Plastic Injection Mould Surface Finishing Polish
Size Customized Size Standard HASCO
Brand Name OEM Model Number Cusomized
Certification ISO 9001 : 2015 , CE Place of Origin Shenzhen , China
High Light HASCO Auto Parts Mould1.2324 Auto Parts MouldS136 Auto Parts Molding

S136 Steel Hardness 1.2324 HASCO Auto Parts Mould Polish Finishing

 

S136 Steel hardness 1.2324 Hasco Polish Finishing Canister mould

 

ShenZhen Jdmoulding Injection Parameter Datasheet
Mould Name Canister mould Part Name Auto parts No.of cavities 1 cavity
Part Material PBT+35%GF Color Black Sample request 15 pcs
Injection Machine 200 Tons Test Time 3nd Time Date Mar 12th,2003
ST 1 2 3 4 5 Cooling Time(sec) 0 Fill Time(sec)  
Barrel&Nozzle Temp 240 235 225 210 180 Recovery Time(sec)   Cycle Time 30
Clamp Open End Position       Mould Temperature   Clamp Force  
Injection 1st 2nd 3rd 4th   Hold 1st 2nd 3rd
Injection Pressure(bar) 112 55     Hold Pressure(bar) 76 96  
Injection Speed(mm/s) 56 10     Hold Speed(mm/s) 26 27  
Injection Position(mm) 32       Time(sec) 6 9  
Ejector Ejector
Forwarder
Ejector
Retract
Storage 1st 2nd Suck-Back
1st 2nd
Pressure(bar) 66 56 46 Pressure(bar) 86 86 46
Speed(mm/s) 26 21 62 Speed(mm/s) 76 76 36
Delay(sec)       Delay(sec)      
Position(mm) 52 62   Position(mm) 36 46 64
Ejector Method Hold setting times Back Pressure  
Ejector Count Times
 
FAQ
Q1 How long do you evaluate the price after you receive the RFQ?
Normal we provide the quotation to the customer in three working days; if the project is very urgently, then we will try our best to provide it within one day.
Q2 What kind of requirements do you need when making a quotation?
For mould manufacturing
1)2D/3D Part Drawing, Mold Drawing;
2)Cav. No., Type of Hot runner and No., Type of mould steel, standard(ie.DME, Hasco etc),
3)Plastic material in uses, any special design enquired from customer For production (in house mould) Annual production amount,
4)Plastic material details; Part and runner weight (if available); Inspection requirements.
For production (mould transfer from customer)
2D part drawing with detail dimension shown, Mould drawing, Plastic material details, Part and runner weight, Mould age, Cycle time, Samples, Inspection requirement, and other special requirements.
Q3 Do you have on-site English-speaking engineers and Marketing person?
Yes, we do. Our project engineers and marketing person all can speak English well. They use English to send the e-mail to our customer for daily engineering communication.
Q4 What the min precision (tolerance) can you make?
The precision can be 0.05mm.
Q5 What type of formats do your mold drawings use often?
We often use .dwg, .step, .prt and .igs catia also.
Q6 What kind of hot-runner do you use?
Usually we use Mold-Master, Incoe, Yudo, Hasco, D.M.E., Husky and Synventive so on.
Q7 What kind of steel do you use? What’s the type?
We can use all types of steel appointed by customer. Usually we use LKM, Swiss Assab steel. The major types: P-20, HHP-20,S420,H-13, S136, NAK80,1.1730,1.2738,1.2312,1.2344
Q8 What's the payment term?
Generally payment term accepted by chinese mold factories are 40 with PO,30 with T1 sample submit,30% before mold shipping, For prototype mold/moulding, pay 50% when place P.O. and another 50% before mold/parts delivery.
Q9 How long it will take to make the mold?
Depends on the mold size complexity,small size/easy structure molds take.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Seller

  • Year Established:

    2017

  • Total Annual:

    5000000-10000000

  • Employee Number:

    >100

  • Ecer Certification:

    Active Member

Shenzhen Jiding Technology Co., Ltd(JiDing) is a high tech company with independent R&D Capability. Its engineering team has many years and much experience on high precision molds design and manufacturing, rapid heating and cooling central temperature control system. Its research ranges cover ra... Shenzhen Jiding Technology Co., Ltd(JiDing) is a high tech company with independent R&D Capability. Its engineering team has many years and much experience on high precision molds design and manufacturing, rapid heating and cooling central temperature control system. Its research ranges cover ra...

+ Read More

Get in touch with us

  • Reach Us
  • Shenzhen JiDing Technology Co., Ltd
  • Building 22#, the 7th Floor, Chuangye Industrial Area, Shapuwei Community, Songgang Sub-district, Bao'an, Shenzhen, China
  • https://highprecision-mold.ecer.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement