Payment Terms | T/T, Western Union, MoneyGram |
Supply Ability | 500sets/month |
Delivery Time | 10-15 working days after down payment |
Packaging Details | strong plywood case for export |
Name | Ashing industrial muffle furnace |
Max temperature | 1200℃ |
operation temperature | 1100℃ |
insulation material | light alumina ceramic fiber board |
heating element | Resistance wire |
heating rate | 0-15℃/min |
temperature accuracy | +/-1℃ |
Temp control | 30 segments programmable controller |
Brand Name | Super |
Model Number | SP-1200B |
Certification | CE |
Place of Origin | China |
View Detail Information
Explore similar products
Atmosphere Heat Treatment 1200C Industrial Muffle Furnace
SiC Heating Benchtop Oven 1400C Digital Muffle Furnace
Large 216L Industrial Muffle Furnace New Material Development
High Temp Gold Silver Melting 12L Industrial Muffle Furnace
Product Specification
Payment Terms | T/T, Western Union, MoneyGram | Supply Ability | 500sets/month |
Delivery Time | 10-15 working days after down payment | Packaging Details | strong plywood case for export |
Name | Ashing industrial muffle furnace | Max temperature | 1200℃ |
operation temperature | 1100℃ | insulation material | light alumina ceramic fiber board |
heating element | Resistance wire | heating rate | 0-15℃/min |
temperature accuracy | +/-1℃ | Temp control | 30 segments programmable controller |
Brand Name | Super | Model Number | SP-1200B |
Certification | CE | Place of Origin | China |
High Light | 1200 Degree Industrial Muffle Furnace ,Box Ashing Industrial Muffle Furnace ,Box Ashing Oven |
Electric Industry muffle furnace application:
This Industry Muffle Furnaceis designed specifically to provide optimum ashing conditions to ensure complete combustion of the sample.
One of the most common applications for SUPER Ashing Furnace lab muffle furnace is to heat combustible samples in order to analyze the resulting ash residue. SUPER ashing furnace with characteristics is tailored to ashing and burn-off applications.
The max. temperature is 1200°C with working volumes of up to 36 liters. If you require an integrated afterburner to remove noxious fumes from materials such as biomass then SUPER Furnace Afterburner Ashing Furnace could be perfect for your needs.
Fast heating Industry muffle furnace technical data :
Model | SP-1200B fast heating ashing lab muffle furnace |
Power supply | AC 220V 50/60HZ |
Furnace chamber | 300*300*400mm(W x H x D Customizable) |
Rated power | 6KW |
Furnace chamber | 1200 type alumina polycrystalline fibers furnace chamber, scientific design and with durable, good insulation properties. |
Heating elements | High quality resistance wire |
Thermocouple | k-type double platinum rhodium thermocouple |
Temperature control mode | The temperature control system uses artificial intelligence technology, with PID control, self - tuning function, 50 segment heating and cooling program |
Continuous working temperature | ≤1100℃ |
Maximum temperature | 1200℃ |
Max. Heating rate | 20℃/min |
Recommended heating rate | 15℃/min |
Temperature control accuracy | ±1℃ |
Standard accessories | Door brick 1 piece ;Crucible tongs 1 piece |
Optional accessories | Furnace hobs , a variety of corundum crucible, oven glove,computer control software and paperless recorder, etc. |
Standard model of fast heating lab muffle furnace :
Model | Max. temp | Chamber Size | Working voltage &power |
SP-1200B-1L | 1200℃ | 100x100x100mm(4”x4”x4”) | AC,1-phase,220V/1KW |
SP-1200B-3.4L | 1200℃ | 150x150x150mm(6”x6”x6”) | AC,1-phase,220V,1.6KW |
SP-1200B-4.5L | 1200℃ | 150x150x200mm(6”x6”x8”) | AC,1-phase,220V.2KW |
SP-1200B-8L | 1200℃ | 200x200x200mm(8”x8”x8”) | AC,1-phase,220V,4KW |
SP-1200B-12L | 1200℃ | 200x200x300mm(8”x8”x12”) | AC,1-phase,220V,5KW |
SP-1200B-18.8L | 1200℃ | 250x250x300mm(10”x10”x12”) | AC,1-phase,220V,6KW |
SP-1200B-36L | 1200℃ | 300x300x400mm(12”x12”x16”) | AC,1-phase,220V,7.5KW |
SP-1200B-49L | 1200℃ | 350x350x400mm(14”x14”x16”) | AC,1-phase,220V,9KW |
SP-1200B-64L | 1200℃ | 400x400x400mm(16”x16”x16”) | AC,3-phase,380V,11KW |
SP-1200B-125L | 1200℃ | 500x500x500mm(20”x20”x20”) | AC,3-phase,380V,15KW |
SP-1200B-216L | 1200℃ | 600x600x600mm(24”x24”x24”) | AC,3-phase,380V,18KW |
Other size is avaiable .
Warranty: One year limited warranty with lifetime support, excluding heating element and ceramic tube damaged by user.
Attention: Any damages caused by the use of corrosive and acidic gases, and any damage from wrong operate and use are not under this coverage
Packing and shipping of electric muffle furnace :
Lab muffle furnaces are covered with polyfoam/sponge before put them into the plywood carton,which not only has good shock absorption, impact resistance and nontoxic, odorless, moisture corrosion etc.
Shipment by sea, by air or by express as per customer's requirement.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Trading Company,Seller
Year Established:
2011
Total Annual:
500000-2000000
Employee Number:
20~50
Ecer Certification:
Active Member
Company Introduction: Henan Super Machinery Equipment Co., Ltd. is located in the central part of China-Zhengzhou City, Henan Province, with an advantageous geographical location and convenient transportation network. It is a comprehensive enterprise integrating scientific research, pro... Company Introduction: Henan Super Machinery Equipment Co., Ltd. is located in the central part of China-Zhengzhou City, Henan Province, with an advantageous geographical location and convenient transportation network. It is a comprehensive enterprise integrating scientific research, pro...
Get in touch with us
Leave a Message, we will call you back quickly!