Payment Terms | T/T, L/C, D/P |
Supply Ability | 30000 pcs per Month |
Delivery Time | 4-6 weeks |
Packaging Details | Plywood Box/According to customer's requirement |
Use | Heavy Machinery |
Material | Alloy Steel |
Product Name | Heavy Machinery Parts Excavator Ripper Tip rock teeth rock bucket teeth ripper tooth |
Color | Yellow |
Application | Excavator /Loader |
Surface treatment | Painting |
Process | Water Glass Investment Casting |
Warranty | 12Months |
Brand Name | OEM service available |
Model Number | OEM service available |
Certification | ISO9001 |
Place of Origin | Ningbo |
View Detail Information
Explore similar products
Shaft Lever 300mm Water Glass Investment Casting
ASTM Oil Tube Flange 200mm Heavy Machinery Parts
ISO Cylinder Base Mount 80mm Heavy Machinery Parts
1U3302 Heavy Machinery Parts
Product Specification
Payment Terms | T/T, L/C, D/P | Supply Ability | 30000 pcs per Month |
Delivery Time | 4-6 weeks | Packaging Details | Plywood Box/According to customer's requirement |
Use | Heavy Machinery | Material | Alloy Steel |
Product Name | Heavy Machinery Parts Excavator Ripper Tip rock teeth rock bucket teeth ripper tooth | Color | Yellow |
Application | Excavator /Loader | Surface treatment | Painting |
Process | Water Glass Investment Casting | Warranty | 12Months |
Brand Name | OEM service available | Model Number | OEM service available |
Certification | ISO9001 | Place of Origin | Ningbo |
High Light | 0.05mm excavator spare parts ,500mm excavator ripper tooth ,0.05mm excavator ripper tooth |
Heavy Machinery Parts Excavator Ripper Tip rock teeth rock bucket teeth ripper tooth
Description:
It is very popular used in Construction Machine, the material can be various based on customer requirement.
It is long life time Using.
1. Products Information:
Name | Heavy Machinery Parts Excavator Ripper Tip rock teeth rock bucket teeth ripper tooth | Material | Alloy Steel | |
Weight | KG | Application | Excavator/Loader | |
Price | USD/KG | 1.3-1.5 | Currency | RMB USD EUR |
Surface treatment | Shot blasting and Yellow Paiting | Process | Water glass investment process | |
Payment terms | 30% deposit, and 70%after see the copy of B/L | Packing | Plywood box | |
Terms of Trade | EXW FOB CIF | ![]() | ![]() | |
Delivery Time | 5days for sample making, 15days for mass production |
2. Manufacturing Process:
Process design⇒ Tooling making ⇒ Wax injection ⇒Wax pattern assembly⇒ Mold preheat ⇒ Wax removal ⇒Stuccoing ⇒Dipping Casting⇒ Mold shake out ⇒Work piece cut-off ⇒ Grinding ⇒ Pack& transport ⇒ Final inspection ⇒Machining ⇒ Heat treatment
3.Application
4.FAQ.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2007
Total Annual:
4,600,000-5,400,000
Employee Number:
100~1
Ecer Certification:
Site Member
Ningbo fenghua hengao machinery co., LTD is located in fenghua district, ningbo city, zhejiang province, close to ningbo international airport.The company adopts advanced precision casting technology, the production of carbon steel, alloy steel, stainless steel, wear-resistant steel and other materi... Ningbo fenghua hengao machinery co., LTD is located in fenghua district, ningbo city, zhejiang province, close to ningbo international airport.The company adopts advanced precision casting technology, the production of carbon steel, alloy steel, stainless steel, wear-resistant steel and other materi...
Get in touch with us
Leave a Message, we will call you back quickly!