Payment Terms | T/T, L/C, D/P |
Supply Ability | 40000 pcs per Month |
Delivery Time | 4-8 weeks |
Packaging Details | Plywood Box/According to customer's requirement |
Type | Links |
Material | Alloy Steel |
Product Name | Chinese Supplier Alloy Steel Lost Wax Investment Casting Car Accessory For Links |
Color | Natural Color |
Size | Customer Size |
Surface treatment | Shot blasting |
Application | Car Accessory,Construction Machinery Parts |
Process | Lost wax investment casting |
Brand Name | OEM service available |
Model Number | OEM service available |
Certification | ISO9001 |
Place of Origin | Ningbo |
View Detail Information
Explore similar products
Alloy Steel Castings of Excavator Parts Bucket Teeth
Alloy Steel Clip 6.3um Water Glass Investment Casting
Car Accessory Exhaust Pipe of 1200mm Alloy Steel Castings
Natural Color Joint Links 800mm Alloy Steel Castings
Product Specification
Payment Terms | T/T, L/C, D/P | Supply Ability | 40000 pcs per Month |
Delivery Time | 4-8 weeks | Packaging Details | Plywood Box/According to customer's requirement |
Type | Links | Material | Alloy Steel |
Product Name | Chinese Supplier Alloy Steel Lost Wax Investment Casting Car Accessory For Links | Color | Natural Color |
Size | Customer Size | Surface treatment | Shot blasting |
Application | Car Accessory,Construction Machinery Parts | Process | Lost wax investment casting |
Brand Name | OEM service available | Model Number | OEM service available |
Certification | ISO9001 | Place of Origin | Ningbo |
High Light | 0.55mm lost wax investment casting ,CT7 low alloy steel casting ,0.022" Lost Wax Investment Casting |
Chinese Supplier Alloy Steel Lost Investment Casting Car Accessory For Links
1. Products Information:
Product Name | Chinese Supplier Alloy Steel Lost Investment Casting Car Accessory For Links |
Material | Alloy Steel,Carbon Steel,Stainless Steel,Gray Iron,Ductile Iron,Aluminium |
Material Standard | GB,BS,ISO,ASTM,AISI,JIS,NF,DIN |
Weight | 0.1-100KG |
Process | Lost Wax Casting, Silica Casting ,Sand Casting, Shelling Mould Casting,Lost Foam Casting,Raw Material Machining |
Heat treatment | Normalizing,Annealing,Quench( Oil or Water),Tempering, |
Surface treatment | Blasting, Machining,Polising,Painting,Zinc Plated,Galavinized,Blacken,Oxided |
Curreney | RMB USD EUR |
Terms of Trade | EXW FOB CIF |
Terms of Payment | 50% of mould and clamp charge when do the sample, and after sample approved, pay 50% balance. And for mass production, 50% deposit when order played, and 50%balance after see the copy of B/L. |
Packing | Non-fumigation Plywood case/ Pallet/Also can do according to customer requirment |
Delivery Time | 50 days for sample making, and 45 days for mass produciton |
2. Manufacturing Process:
Process design⇒ Tooling making ⇒ Wax injection ⇒Wax pattern assembly⇒ Mold preheat ⇒ Wax removal ⇒Stuccoing ⇒Dipping Casting⇒ Mold shake out ⇒Pouring⇒Work piece cut-off ⇒ Grinding ⇒ Heat treatment⇒Machining⇒ Final inspection ⇒ Pack& transport
Advantage of Lost Wax Casting:
Lost Wax Casting-Also called Investment Casting is generally more exppensive than it's related metal casting methods of "die casting" or "sand casting",but can product complicated structures that require little rework or machining.
♦ complex shapes can be cast as one part without welding
♦ products with counter-relief /inner structures can be cast
♦ machining costs are reduced to minium
♦ can be performed on almost any alloy
3.Quality Insurance
The goods quality is controlled well, it is the important process also to deliver the goods part to customer.
We monitor each step of making the rough casting, and have inspector check the goods for each process, after the rough casting come out, there has the equiment to check the goods, for there chemical compositon and mechnican property. Also check the part size before delivery.
Spectrograph Spectrum Analyse Chemical Analyse
Tensile Machine&Hardness Machine Shaping Machine Simple Hardness Test Machine
3.FAQ
a. Are you a factory or trading company?
We are have a factory and a trading department.
b. Where is your factory located?Can we have a visit?
Our factory is located in Fenghua District, Ningbo,China.You can fly to Shanghai Airport and take the train to ningbo, Also can fly to Ningbo Air port directly.All our clients, from home or abroad, are warmly welcome to visit us.
c. How does your factory to regarding quality control?
Quality is priority, we always attach great importance to quality controlling from the very beginning to the very end.We also has gained ISO9001:2008 Authentiation.
4. Welcome the customer from abroad and domestic to send the inquiry.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2007
Total Annual:
4,600,000-5,400,000
Employee Number:
100~1
Ecer Certification:
Site Member
Ningbo fenghua hengao machinery co., LTD is located in fenghua district, ningbo city, zhejiang province, close to ningbo international airport.The company adopts advanced precision casting technology, the production of carbon steel, alloy steel, stainless steel, wear-resistant steel and other materi... Ningbo fenghua hengao machinery co., LTD is located in fenghua district, ningbo city, zhejiang province, close to ningbo international airport.The company adopts advanced precision casting technology, the production of carbon steel, alloy steel, stainless steel, wear-resistant steel and other materi...
Get in touch with us
Leave a Message, we will call you back quickly!