China factories

China factory - Langfang pangolin construction machinery co. LTD

Langfang pangolin construction machinery co. LTD

  • China,Langfang ,Hebei
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Double Hoppers Drilling Equipment Liquid Jet Mud Mixer
China Double Hoppers Drilling Equipment Liquid Jet Mud Mixer

  1. China Double Hoppers Drilling Equipment Liquid Jet Mud Mixer
  2. China Double Hoppers Drilling Equipment Liquid Jet Mud Mixer

Double Hoppers Drilling Equipment Liquid Jet Mud Mixer

  1. MOQ:
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms T/T
Delivery Time 5-15work days
Packaging Details According to customer needs
Viscosity ≤120s / ≤80s
External dimension 2650x2400x1150 , 2200x1700x1200 , 2130x1650x1150 , 2000x1650x1100
Flow (m3/h) 2x240 / 240 / 200 / 180
Weight (kg) 3000 / 1800 / 1400 / 1280
Density (g/m3)/(Ib/gal) ≤2.8/23.4 , ≤2.4/20 , ≤2.0/16.7
Burden Speed (kg/min)/(lbs/min) ≤100/220 , ≤80/176.4 , ≤35/132.3
Pressure (Mpa) 0.25~0.40
Hopper Dimension (mm)/(in) Φ700*Φ150 / Φ28*Φ6
Brand Name Pangolin
Place of Origin Hebei China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Delivery Time 5-15work days
Packaging Details According to customer needs Viscosity ≤120s / ≤80s
External dimension 2650x2400x1150 , 2200x1700x1200 , 2130x1650x1150 , 2000x1650x1100 Flow (m3/h) 2x240 / 240 / 200 / 180
Weight (kg) 3000 / 1800 / 1400 / 1280 Density (g/m3)/(Ib/gal) ≤2.8/23.4 , ≤2.4/20 , ≤2.0/16.7
Burden Speed (kg/min)/(lbs/min) ≤100/220 , ≤80/176.4 , ≤35/132.3 Pressure (Mpa) 0.25~0.40
Hopper Dimension (mm)/(in) Φ700*Φ150 / Φ28*Φ6 Brand Name Pangolin
Place of Origin Hebei China
High Light Liquid Jet Mud Mixer45kw Jet Mud MixerDouble Hopper Mud Mixer

Double Hoppers Drilling Equipment Liquid Jet Mud Mixer

 

 

 

Introduction


Mud jet mixer is a special equipment used to prepare and increase the weight of drilling fluid by adding bentonite, stirring, changing the density of drilling fluid, changing the density, viscosity and dehydration of drilling fluid. The effect of matching with shear pump is more prominent. Jet mud mixers are equipment used in oil drilling and horizontal directional drilling (HDD) together with solids control systems. The device includes a sand pump, a jet mixing hopper and a jet mixer. The jet mixer is installed on a base with pipeline valves. Safe and stable, easy to move. At the same time, a double-nozzle mud mixer can be made according to user requirements. It is composed of a solid-controlled bentonite mud mixer and a drilling mud tank jet mixer.

 

 

The main structure features
 

1. Sand pump and jet mixing hopper can be installed in combination or separately, connected by pipeline and valve. Seal with packing and mechanical double seal, good sealing performance.
2. The jet mud mixer can effectively change the density, viscosity and water loss rate of the mud, enhance the dispersion effect of the material, and increase the pressure head of the mixed liquid.
3. The single jet mud mixer is composed of a sand pump and a jet mixing hopper. The hopper is installed on a base with a pipeline valve. The dual-nozzle mud mixer is composed of two sand pumps and two nozzle mixing hoppers.

 

 

Product parameters

 

Matching Pump 2xCP68-55 / CP68-55 / CP68-45 / CP56-30
Capacity 240㎥/h , 180㎥/h , 120㎥/h , 60㎥/h
Power (Kw) 2x55 / 55 / 45 / 30
Flow (m3/h) 2x240 / 240 / 200 / 180
Lift (m)/(ft) 36/118 , 33/108 , 28/92
Pressure (Mpa) 0.25~0.40
Inlet Pipe (mm)/(in) DN150/6
Nozzle Caliber Φ50/2 , Φ40/1 1/2 , Φ35/1 3/8
Hopper Dimension (mm)/(in) Φ700*Φ150 / Φ28*Φ6
Burden Speed (kg/min)/(lbs/min) ≤100/220 , ≤80/176.4 , ≤35/132.3
Density (g/m3)/(Ib/gal) ≤2.8/23.4 , ≤2.4/20 , ≤2.0/16.7
Viscosity ≤120s / ≤80s
Weight (kg) 3000 / 1800 / 1400 / 1280
External dimension 2650x2400x1150 , 2200x1700x1200 , 2130x1650x1150 , 2000x1650x1100
Voltage 380V/460V or customized

 

 

Field of use

Jet mud mixers are widely used in drilling waste management, oil and gas drilling, trenchless HDD and tunnel construction, oil and mud separation, bored piling, water drilling, oil mud dehydration system, coal bed gas solid phase control system and other industries.

 

 

Advantages

The drilling fluid flows into the jet pump at a certain pressure. The fluid in the jet pump is first ejected from the jet nozzle, and then flows into the shear tube through the mixing chamber. The material is added from the hopper to the mixing hopper, and enters the shear tube with the airflow. In this process, they are dispersed and mixed. The mixed fluid flows out of the shear tube and enters the drilling fluid tank.
The shear tube is hollow and can gradually expand on a certain curved surface. It is mainly used to expand the shearing force in the tube, further disperse the material, increase the mixing head, and facilitate the material to enter the circulation tank.
The shear tube has a fast flow rate under low pressure and a slow flow rate under high pressure, using Bernoulli effect. When the fluid is ejected from the nozzle at a high speed, the pressure in the chamber is relatively low; after the fluid enters the shear tube, the cross section increases, the flow velocity decreases, and the pressure increases.

 

 

Pic Show

 

 

 

FAQ:

 

1. How to order products?

A: Please send an inquiry with a detailed project description or model.

 

2. How about the regular packing?

A: If there is no special packing requirement, we will take it as regular packing. First put them in small cartons, then put large cartons together to make sure the goods are finished.

 

3. Can I expect a quality products?

A: Yes. mature production technology ensuring the quality satisfy international request.

 

4. How to check the product are the exact one you want?

A: If possible, please attach one reference picture to avoid any misunderstanding or any links from our website for a better understanding.

 

5. How to control quality?

A: We have our own experienced QC team,there will be strict inspection and testing for each order before shipping out.

 

6. Fast delivery time:

A: Usually it takes 25 days for production.only 3 or 5 days if we have stock of your request size.

 

7. Competitive price:

A: Our factory can supply you the lowest price due to direct sale to customers without distributor!

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2011

  • Total Annual:

    2,000,000-4,000,000

  • Employee Number:

    50~100

  • Ecer Certification:

    Active Member

Pangolin Engineering Machinery Co., Ltd. produces all kinds of drilling equipment, drill bits, parts, etc. Has achieved industrialization, serialization, and has the ability to supply batches. The company focuses on technical exchanges and cooperation with international and domestic counterparts. Ma... Pangolin Engineering Machinery Co., Ltd. produces all kinds of drilling equipment, drill bits, parts, etc. Has achieved industrialization, serialization, and has the ability to supply batches. The company focuses on technical exchanges and cooperation with international and domestic counterparts. Ma...

+ Read More

Get in touch with us

  • Reach Us
  • Langfang pangolin construction machinery co. LTD
  • Guangyang Plot, Langfang City, Hebei Province, China
  • https://www.hddholeopeners.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement