China factories

China factory - Langfang pangolin construction machinery co. LTD

Langfang pangolin construction machinery co. LTD

  • China,Langfang ,Hebei
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Polyurethane Screen 300GPM Drilling Mud Recycling System
China Polyurethane Screen 300GPM Drilling Mud Recycling System

  1. China Polyurethane Screen 300GPM Drilling Mud Recycling System
  2. China Polyurethane Screen 300GPM Drilling Mud Recycling System

Polyurethane Screen 300GPM Drilling Mud Recycling System

  1. MOQ:
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms T/T
Delivery Time 5-15work days
Packaging Details According to customer needs
Total Power 25Kw -184 Kw
Cyclone (mm) 250 -900
Tank Volume 5-30 ㎥
Customized YES
Specification Can be customized according to requirements
Application Drilling
Screen mate Polyurethane
Impeller material Cr26
Brand Name Pangolin
Place of Origin Hebei China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Delivery Time 5-15work days
Packaging Details According to customer needs Total Power 25Kw -184 Kw
Cyclone (mm) 250 -900 Tank Volume 5-30 ㎥
Customized YES Specification Can be customized according to requirements
Application Drilling Screen mate Polyurethane
Impeller material Cr26 Brand Name Pangolin
Place of Origin Hebei China
High Light 300GPM Drilling Mud Recycling System300GPM Mud Recycling System300GPM Drilling Recycling System

Polyurethane Screen 300GPM Drilling Mud Recycling System

 

Easy To Disassemble, Saving Time HDD Mud Recycling System

 

 

Introduction

The HDD drilling fluid recovery system is designed for horizontal directional drilling rigs (HDD).


According to drilling mud requirements, THE HDD mud recovery system may include vibrating screen, mud cyclone, mud cyclone, CAN separator centrifuge, mud tank, mud mixer, mud gun, conveying pump, etc. Performance of the vibrating screen under mud flow and drilling mud separation and different mud requirements.

 

 

Main structural features

1. Good capacity and performance: The system capacity can reach 240m3/h (1000GPM), which can meet the slurry treatment of large-scale trenchless projects.
2. The high wear-resistant polyurethane cyclone separator is the same as the international brand, can be used for more than 3800 hours, has a long service life and good interchangeability.

3. All parts of the equipment are connected quickly and disassembled conveniently, saving time.
4. Explosion-proof lamps meet the requirements of night construction, easy to operate, safe and reliable.

 

 

Product parameters

 

Customized YES
Capacity 50-240 ㎥/h (200-1000 GPM)
Screen Area 2.2-8.4 ㎡
Separation Stage 2stage / 3stage
Tank Volume 5-30 ㎥
Total Power 25-184 Kw
Total Weight 5.5-20 t
Land Transport Dimension (mm) customized
Screen material Polyurethane
Cyclone (mm) 250 -900
Impeller material Cr26
Application Drilling
Specification Can be customized according to requirements

 

Model CSJ-FN-30C CSJ-FN-60C CSJ-FN-120C CSJ-FN-200C
Capacity (m3/h) 30 60 120 200
Slurry pump Model DC-EHM-1.5C DC-EHM-3C DC-EHM-3C DC-EHM-4C
Power (Kw) 7.5 11 22 37
Pressure (MPa) 1.0~2.0
Shale shaker Power(Kw) 1.5 2 3 3
Vibration force(KN) 30 40 60 60

Screen

size (mm)

UP 1400X600 1700x700 1900X1000 2100x1200
Down 1400X600 1700x700 1900X1000 2100x1200
Cone Model FN-100 FN-150
Cone Number 3 6 12 8
Separation size (μm) 10-30
Total Power (KW) 9 13 25 40
System Max.Size(mm) 1650X1450X2150 2000X1600X2250 2170X2000X2400 2400*2300*2400
System weight (Kg) 1200 1900 2500 3500

 


HDD mud recovery system working procedures


1. After 1 or 2 or 3 sets of desander cyclones sit on the vibrating screen, a set of centrifugal pumps will separate the desander cyclong in the second stage, and the solid desander will discharge the vibrating screen or directly cut the box and the liquid flow desander Will flow into the desander chamber.
2. After the de-sander, a certain number of de-sand cyclones will be placed to separate fine particles. The solids except the de-sand will be discharged into the vibrating screen or cuttings box, and the fluid in the de-sand will enter the de-sand chamber .

3. There is a drilling machine on each side of the drilling machine and a set of vertical mud pumps are installed on the top of the drilling machine to feed the vibrating screen. The shale shaker separates the drill cuttings and the fluid portion falls into the sand pool through the sieve hole.
4. The mixing pump is installed on the anti-skid trough to transport the drilling mud and inject the mud into the mud hopper to remix the new mud with new chemicals. The mixing hopper can be installed on the top of the tank or on the slider according to customer requirements.

 

 

Advantages

1. Modular design, small floor space, flexible configuration and installation according to customer requirements.
2. The side plate of the mud tank is designed as a corrugated load-bearing type, which is safe and reliable, and can withstand larger loads.
3. The system adopts electric centralized control, which is easy to operate.
4. All equipment adopts corrosion-resistant and wear-resistant design with long service life.
5. Suitable for harsh drilling conditions, cold resistance, heat resistance, explosion-proof, leak-proof, corrosion-resistant, and rain-proof.
6. Simple installation and disassembly, convenient for frequent movement of drilling personnel.

 

 

Pic Show

 

 

 

FAQ:

 

1. How to order products?

Please send an inquiry with a detailed item description or model number.

 

2. How about ordinary packaging?

A: If there is no special packaging requirement, we will handle it as normal packaging. Put them in a small carton first, and then put them in a big carton together to ensure that the goods are complete.

 

3. Can I expect high quality products?

Is. Mature production technology can ensure the quality of products in line with international requirements.

 

4.How to control the quality?

A: We have our own experienced quality control team, and every order is rigorously checked and tested before shipment.

 

5. How to confirm whether the product is what you want?

Answer: If possible, please attach a reference picture to avoid misunderstanding, or attach any link to our website for better understanding.

 

6. Fast delivery time:

A: Usually production takes 25 days. If we have the stock size you requested, it only takes 3-5 days.

 

7. Competitive price:

A: Our factory can provide you with the lowest price and sell directly to customers, no distributors are needed!

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2011

  • Total Annual:

    2,000,000-4,000,000

  • Employee Number:

    50~100

  • Ecer Certification:

    Active Member

Pangolin Engineering Machinery Co., Ltd. produces all kinds of drilling equipment, drill bits, parts, etc. Has achieved industrialization, serialization, and has the ability to supply batches. The company focuses on technical exchanges and cooperation with international and domestic counterparts. Ma... Pangolin Engineering Machinery Co., Ltd. produces all kinds of drilling equipment, drill bits, parts, etc. Has achieved industrialization, serialization, and has the ability to supply batches. The company focuses on technical exchanges and cooperation with international and domestic counterparts. Ma...

+ Read More

Get in touch with us

  • Reach Us
  • Langfang pangolin construction machinery co. LTD
  • Guangyang Plot, Langfang City, Hebei Province, China
  • https://www.hddholeopeners.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement