Material | Stainless Steel |
Technics | Casting |
Connection | roll grooved coupling |
application | grooved system for stainless |
Usage: | Fire Sprinkler System |
size | custom |
Packaging Details | standard export seaworthy packing or as required |
Delivery Time | 5-20 days |
Payment Terms | L/C, T/T, Western Union |
Supply Ability | 15000Tons |
Place of Origin | China(mainland) |
Certification | ISO9001 |
View Detail Information
Explore similar products
Forged Grooved Connection 45 Degree Elbow Easy To Dismantle For Petroleum
Sandblasting Groove Lock Pipe Fittings Grooved Equal Tee For Pipeline
FM UL Approved Groove Lock Pipe Fittings Stainless Steel Material For Fire
Uniform Thickness Groove Lock Pipe Fittings , Grooved Pipe Clamps For Industrial
Product Specification
Material | Stainless Steel | Technics | Casting |
Connection | roll grooved coupling | application | grooved system for stainless |
Usage: | Fire Sprinkler System | size | custom |
Packaging Details | standard export seaworthy packing or as required | Delivery Time | 5-20 days |
Payment Terms | L/C, T/T, Western Union | Supply Ability | 15000Tons |
Place of Origin | China(mainland) | Certification | ISO9001 |
High Light | groove lock pipe couplings ,groove lock coupling |
High Strength Groove Lock Pipe Fittings Groove Lock Clamps Customized Size
Grooved Piping System
The grooved piping system is one of the most advanced, versatile, economical and reliable systems available today. After the pipe ends are grooved a gasket is stretched over the pipe ends. The coupling segments are then placed over the gasket and the bolts and nuts are fastened resulting In a secure and leak free joint.
A coupling can be installed 3–4 times faster than a comparable welded or brazed joint and there is no need fora flame or welding torch on the job site. A coupling can be installed by fastening a pair of bolts and nuts while using only a wrench or spanner, whereas a comparable flanged joint requires the fastening of many bolts and nuts with a pair of wrenches. The grooved system allows for easy material take-offs and unlike a threaded system, there is no need to allow for added pipe length for thread engagement. With the removal of just a few bolts one can easily access the system for cleaning, maintenance, changes and or system expansion.
JUNT
|
|||
Company Type
|
Manufacturer
|
||
Standard
|
ANSI,ASTM,DIN,JIS,GB,BS
|
||
Materal
|
stainless steel
|
||
Color
|
Red RAL3000 , Orange , Bule or according to custom requirements
|
||
Surface Treatment
|
Paint, Epoxy, Galvanization or Dacroment
|
||
Threaded
|
BSPT NPT
|
||
Certification
|
UL FM CE ISO 9001
|
||
Delivery Time
|
Normally within 15-30days
|
||
Pressure
|
300PSI 500PSI 2.5MPA
|
||
Payment Terms
|
T/T L/C OR Other
|
||
Useage
|
1) Automatic sprinkler system for fire production on commercial,civil and municipal constructions like water supplying ,gas supplying , heat supplying , etc
|
||
2)Industrial pipeline system on shipping , mine , textile oil field , power plant , etc
|
|||
3)Pipeline system on subway station , railway station airport , seaport, brided , etc
|
Our Service
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. after sending, we will track the products for you , until you get the products. When you got the goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer the solve way for you.
FAQ
Q1. What is your MOQ?
A: Generally, Our MOQ is 1 piece, if no storage, the MOQ depend on steel grade and size
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Employee Number:
>100
Ecer Certification:
Active Member
Wenzhou New Kongshi Machinery Co.,ltd is a modem high-tech enterprise with Import and export right. Stainless steel trench water filter, stainless steel trench waterproof converter, stainless steel telescopic tube, building fire water supply stainless steel elbow. stainless steel trench, stainless s... Wenzhou New Kongshi Machinery Co.,ltd is a modem high-tech enterprise with Import and export right. Stainless steel trench water filter, stainless steel trench waterproof converter, stainless steel telescopic tube, building fire water supply stainless steel elbow. stainless steel trench, stainless s...
Get in touch with us
Leave a Message, we will call you back quickly!